You are on page 1of 14

Feb 2013

ABB SACE Maintenance


Preventive Maintenance Program
Maintenace
Agenda

Aim
Mind-Changing
Why maintaining
Miths and Facts
Estimated lifetime

ABB SACE Maintenance portfolio:


Maintenance with ABB SACE: Benefits
Offer:
Preventive Maintenance – PMP
Maintenace theory
Aim: Mind-changing

‘’Any maintenace activity is a cost’’


The customer has to understand that performing a
correct and periodic maintenance is essential to:
- Reduce the total managing costs
- Use the resources according to needs
- Standard, directives and laws
Maintenace Theory
Myths & Facts

Common Myths Proven Facts


• Circuit-breakers are Circuit-breakers are protecting
L S Efree •

FA
maintenance devices: periodical check on
functionality and maintenance
are required to guarantee the
original performance level
• Circuit-breakers • Circuit-breakers Preventive
Preventive Maintenance consists in
L
MaintenanceS Eis just checking the integrity of all the
FAdown
dusting electrical and mechanical
components to limit aging on
components and prevent faults
• The circuit-breaker is • All the mechanical and electrical
always in closed components need maintenance
soSitEdoesn’t
position L (as lubrication) in particular in
FAany
require harsh environments.
maintenance
Maintenace Theory
Why maintaining
Direct
costs Direct Costs
• Maintenance: personnel,
materials

Indirect/induced Costs:
• Higher risk in Health & Safety
• Reduction of products lifetime
• Management of urgency
• Poor quality
• Energy consumption
• Environmental impact
• Resource availabilities
Indirect • Inefficiency in personnel
costs • Insurance policies
• Production Losses
• Losses in market share
Maintenace Theory
Estimated lifetime

Based on ABB experience, it is possible to define


average component lifetimes

BUT

a SITE SURVEY is always recommended.

It is performed by a circuit breaker specialist, who


inspects the products, on-site spares, environment,
fault history, etc...

The result of a site survey is a proposal of short and


long term maintenance actions
ABB SACE Maintenance Portfolio
Maintenance with ABB - benefits

ABB technicians are skilled and properly trained:


 Before operating on the field spend at least 1
year in the production line
 Regular courses to be updated on new products
 By turns work in the internal assembly line for
repair
 Original Spare Parts
 Right tools
 Continuous communication between R&D/
Quality dep. and Service  Knowledge on CB
updates (modification for improvements)
ABB SACE Maintenance Portfolio
ABB SACE offer
(in accordance with EN 13306:2010)

Before a failure After a failure


Maintenance

Preventive Corrective

Conditioned
Predetermined
- based
Urgent Deferred

Scheduled Predictive
ABB SACE Maintenance Portfolio
Preventive maintenance

Before a failure

Preventive
Maintenance

Conditioned-
Predetermined
based
Maintenance Maintenance

Scheduled LEAP
PMP Predictive
Maintenance Maintenance +PMP
ABB SACE Maintenance Portfolio
Preventive and Scheduled Maintenance - PMP

Reduce the risk of failure and working deterioration of the low


voltage circuit-breakers installed in the plant
It is structured in a cycle of three maintenance interventions:
• 1st-2nd intervention: Ordinary Maintenance
Maintaining the original integrity of the product:
• Maintaining or restoring the efficiency of the products
• Containing the normal deterioration of use
• Guaranteeing the useful life of the product
• Facing accidental events
• 3rd intervention: Extraordinary maintenance
Extend the useful life and/or improve:
• efficiency
• reliability
• productivity
• facility of maintenance and inspection
All interventions are carried out by chief skilled technicians
ABB SACE Maintenance Portfolio
Preventive and Scheduled Maintenance for Emax

 Provides systematic
and functional means of
maintaining a specific
breaker
 Each ABB ACB series
has its own schedule
which is based on years
of experience and
knowledge of
manufacturing and
maintaining circuit
breakers

Ordinary Maintenance Extraordinary


Maintenance
ABB SACE Maintenance Portfolio
PMP: Benefits
 Circuit breaker efficiency/reliability preservation
 Guaranteeing the plant & people safety
 Probability of unwanted shut-downs reduction
 Providing the best management of maintenance costs
 Direct costs: Direct maintenance : technicians, spare parts…
 Indirect costs: non-production, accident, failure, maintenace
management, …
 Customer support during all product life phases
 ABB professional competence guaranted:
 Preventive maintenance to increase: performances, reliability,
availability of circuit breakers and systems
ABB SACE Maintenance Portfolio
Summary

 Maintenance management maximizes the value of


circuit breakers and customers investments.
 All the circuit breakers have aging and wearing in
components: a proper preventive maintenance is
required
 Maintenance schedule specifies the recommended
maintenance actions for preventive maintenance

You might also like