Engine Division
Quality improvement points by using TPIA at regions.
Quality Improvement Points & Implementation Status
Monitoring Sheet
No of Inspectors : 5 May to Oct 2021
Batch Quantity
SL No, of inspection visit Type of component Batch Quantity Batch Quantity rejected at
Region
NO suppliers (Batch) accepted at supplier rejected at supplier receiving area
TPI
1
Pune 102 159 158 1Batch (91Qty) 4
2
Bangalore 183 225 208 17 8
3
Mysore 60 74 72 1 10
5 Coimbatore 43 82 81 1 1
1
Pune 67 12 3 8 7 1 8 - - NA NA NA
2
Bangalore 127 42 12 10 15 NIL 6 - - 1 - -
3
Mysore 52 22 - - NIL NIL - - - - - -
4
Kolhapur 63 28 5 11 NIL NIL 4 - - NA NA NA
5
Coimbator 61 18 - 3 1 NIL - - NA NA NA
e
1
Pune 22 16 3 NIL 3 NIL - - - NA NA NA
2
Bangalore 45 12 8 5 9 NA 1 - - 3 - -
3
Belgaum 24 7 1 1 NIL NIL 2 - - NA NA NA
4
Kolhapur 8 2 NIL NIL NIL NIL - - - NA NA NA
1
Pune 26 19 3 8 NIL 1 - - - - - 2
2
Bangalore 84 18 All AV 1 16 1 In Progress - - - - - 6
3
Belgaum 28 10 NA NIL NIL NIL - - - NA NA NA
4
Kolhapur 39 13 AV NIL NA In Progress NA - - NA NA NA
1
Pune 28 20 3 8 NIL 1 - - - - - 2
2
Bangalore 85 19 All AV 1 16 1 - - - - - 6
3
Belgaum 24 10 2 NIL NIL NIL - - - NA NA NA
4
Kolhapur 29 22 All AV NIL NA 2 NA - - NA NA NA
Engine Division
STATUS OF TPIA INSPECTION – INHOUSE – MYSORE
Receiving Inspection May’21-jan’22
No of
Sl. Location Inspector components Observations Feed backs Resolved Significant improvements / Assignments
No inspected
No of
Sl. Significant improvements / Assignments
No Location Inspector components Observations Feed backs Resolved
inspected
No of
Sl. Significant improvements / Assignments
No Location Inspector components Observations Feed backs Resolved
inspected
No of
Observatio Significant improvements / Assignments
Sl.No Location Inspector engines Feed backs Resolved
inspected ns
Inspecte
36 70 105 126 20 40 64 70 72
d
Accepte
35 64 94 104 15 39 49 55 58
d
rejected 01 6 11 22 5 01 15 15 12
Mandatory conditions to be implemented at suppliers works.
1.100% inspection to be carried for New development parts all the parameters
(Dimensional, metallurgical, Heat treatment process, surface coating details etc.)
and record to be submitted before bulk supply.
2. Tatra/HDT component suppliers to inform BEML source inspection team (SIT) /
TPIA for inspection and clearance for all the supplies.
3. Pressure Test to be carried out for all casting after complete machining.
7. Cpk = 1.33 min for machined critical dimensions to be maintained and records
to be attached in every batch of supply.
8. Supply of Warranty parts (Performance related) and shelf life items should
be from latest manufacturing date only. Should not be older than fifteen
days wherever the warranty begins from MFD date on component Name plate .
9. Packing tubular items having brazing joints to be packed individually with
suitable supports to retain the pipe bending shape.
The above conditions are apart from regular inspection procedure.
Following are the requirements for verification of casting quality and documents
links in suppliers’ reports.
1. DC No. or Invoice No. to be incorporated in your reports.
2. Record heat Nos. and corresponding quantity, Part number, part name in the reports.
3. Once in six month or for every 100th piece (Cylinder heads) and every 50th piece for
Cylinder block, Fly wheel hsg, gear case, gear case cover , oil cooler hsg & covers etc -
castings lay out to be made and report to be forwarded to division.
4. Tensile bar (Machined) to be provided once in six months for re verification at our
laboratory.
5. To confirm and document, weight of the castings, once in six months needs to
be measured and record to be provided.
Note: For easy tracking January and July of every year shall be identified for verification
and reports submission.