Professional Documents
Culture Documents
DEVELOPMEN
T PROJECT
Presented by: Shivani K Nair
2028149
Overview for presentation plan
Phase 7 Phase 2
Website Developemt
Testing,Reviewing Life Cycle Design
Designing
and Launching
Phase 3
Phase 6
Phase 4
Phase 5 Phase 4
Content Writing and
Coding Assembly
Executing effective web design project
management
Set and meet client expectations
Goals
High Level Development
ONSHORE Analysis Design Coordination Deployment
Detail
OFFSHORE Planning Architecture Development Testing
01 Scope –The project scope will not change once the stakeholders sign of
on the scope statement
Detailed
Detailed
project plan
02 Delivery - The project servers are configured as planned, and the
websites are built according to the specifications.
project plan
a) Required assumptions
03 Budget- The overall cost of day-today operations will not increase
a) Required assumptions
04 Technology - Software development, platforms, environments, networks,
firewalls, and bandwidth are all possible concerns.
• A table can be deployed to highlight all the possible risk along with their Impact and Frequency of occurrence
• Detailed planning is essential to creating a project schedule
• Create a project charter document for your client describing what your team will deliver
c) EFFORT ESTIMATION
Analogous approach
• Identification of Resources
• Forecasting Resources for each Module and scheduling according to timeframe
• Creating a detailed project timescale and resource schedule
• Setting resources according to Budget
• Forecasting future Planning
e) STEPS TO ENSURE QUALITY
Would test page-load speed, User testing guarantees that visitors to your Taking the time to test buttons,
fundamental web vitals, and how website can easily navigate around it and forms, menus, and links during
the site responds to attempted discover the information they need to help the functional testing phase
overloads at this period. them perform the action you want them to ensures that the site functions as
do. intended.
Module Testing
Resource allocation and Time Top-Down approach will be used Better communication
Schedule have been estimated for the estimation of the remaining between offshore offsite and
during the Planning Phase modules onsite teams