Professional Documents
Culture Documents
FUNCTION of Siding:
• Sidings may be used for storing, loading, and unloading vehicles.
• Common sidings store stationary rolling stock especially for loading and
unloading.
• Industrial sidings go to factories, mines ,collieries and ware house .
In Single line Main Track, siding can also be used to pass the crossing train
from other side.
2
BALLAST
BALALST:
It is a granular material, usually broken stone, which laid on the formation to
form a bed for the track fittings like sleepers.
FUNCTION of Ballast:
1. Transmit the uniform load to formation below ballast
2. Allow Efficient drainage
3. Holding track in vertical, lateral and longitudinal direction without much of
Safer : for
permanent deformation. Sustainable: World: World (not
everyone
associated with Sustainable restricting to nation)
usBallast
and our Cushion: buildings / AND also, fulfilling
customers. infrastructure and dreams. Customer’s
250-300 mm Cushion responsibility dream infra / home
Superior quality
of products. towards project which means
Size of Ballast: environment. world to them.
20mm -65 mm (98 %)
3
OVERVIEW OF THERMIT
WELDING IN RAILWAY
Thermit Welding
This only form of site welding adopted in Railway.
5
THERMIT WELDING
Thermit Welding
This only form of site welding adopted in Railway.
6
7
8
9
10
THANK YOU
ALL THE BEST
11