Professional Documents
Culture Documents
TB 1
TB 1
NO. I-A
SURVEYING, MAPPING
AND PLANNING
DEVELOPMENT AND
OTHER ACTIVITIES FOR
EXPANDED NATIONAL
GREENING PROGRAM
PLANTING SITES
This technical bulletin enumerates the activities to be undertaken in 2016 onwards in order to pave the way for the
smooth implementation of Expanded NGP in compliance to Executive Order 193 series of 2015 beginning 2017. It
also specifies prescribed color to be used for the polygon from 2017-2022 as well as the cost in the conduct of SMP.
Activities to be Undertaken Geotagging of planting site- all identified planting sites shall be geotagged
1. Survey assessment and preparation of GIS generated map of all
showing its geographic coordinates and date and time when the photo was taken
planting- All identified planting sites shall be subjected to perimeter
survey, assessment and preparation of GIS generated map, in shapefile The prescribed color of polygons for CY 2017-2022 shall be as follows:
format, following the prescribed color, site code and with corresponding
RGB COMBINATION
completed attribute/data/information. YEAR COLOR
RED GREEN BLUE
Required field Field Properties Description Sample Data
Region Text (50 char) What region (Roman Numeral) II 2017 Free Speech Green 25 232 2
District Text (50 char) What congressional district Lone District
2018 Olive Green 181 179 92
CENRO Text (100 char) Name of CENR Office Talavera
PENRO Text (100 char) Name of PENR Office Nueva Ecija 2019 Red Berry 142 0 0
Barangay Text (100 char) Name of Barangay Digmala
2020 Blizzard Blue 163 227 237
Mun_City Text (100 char) Name of Municipality Bongabon
Province Text (25char) Name of Province Nueva Ecija 2021 Crusta 253 123 51
Area Double (10,4) Area in hectares 20.14414767
2022 White Rock 2 37 237
Name _Org Text (255 char) Name of Organization involve in plantation establishment Digmala Upland F.A
Contact_Pers Text (50 char) Name of contact person of the organization Juan Dela Cruz
REVISED GUIDELINES IN
SURVEYING, MAPPING
AND PLANNING
DEVELOPMENT AND
OTHER ACTIVITIES FOR
EXPANDED NATIONAL
GREENING PROGRAM
PLANTING SITES
Required field Field Properties Description Sample Data
This technical bulletin is the revision of the Technical Bulletin 1-A issued in
June 03, 2016. This enumerates the activities to be undertaken in 2019 onwards Region Text (50 char) What region (Roman Numeral) II
in order to pave the way for the smooth implementation of ENGP in compliance District Text (50 char) What congressional district Lone District
to Executive Order No. 193 series of 2015 and its Revised Implementing Rules CENRO Text (100 char) Name of CENR Office Talavera
and Regulations under DAO 2019-03. For the ENGP, site assessment and PENRO Text (100 char) Name of PENR Office Nueva Ecija
activities and survey, mapping and planning (SMP) activities should be Barangay Text (100 char) Name of Barangay Digmala
thoroughly done to ensure that plantations to be established are suitable in the Mun_City Text (100 char) Name of Municipality Bongabon
area so that high success rates will be attained. This revised TB added guidelines Province Text (25char) Name of Province Nueva Ecija
on the inclusion of data on soil analysis as part of the requirement for the SMP Area Double (10,4) Area in hectares 20.14414767
of ENGP sites to be established. Name _Org Text (255 char) Name of Organization involve in plantation establishment Digmala Upland F.A
Contact_Pers Text (50 char) Name of contact person of the organization Juan Dela Cruz
Activities to be Undertaken Type_Org Text (50 char) Type of Organization PO, LGU,NGA
A. Conduct of Consultation and Information, Education and Component Text (50 char) Name of component (e.g. Agroforestry, reforestation, etc) Agroforestry
Communication (IEC) campaign- This activity should be done to inform Commodity Text (50char) Name of component (e.g. fuelwood, timber) Fuelwood
B. Conduct of Soil Analysis- This activity should be done to determine Tenure Text (100 char) Tenurial instrument CBFM
soil properties and species appropriate to it as well as to identify No. of LOA Short integer (100) No. of LOAs issued 45
interventions to improve the soil condition of proposed ENGP sites. A Riv_Basin Text (100 char) Name of river basin where the project is located ,if there is any Bicol River Basin
Watershed Text (100 char) Name of watershed where the project is , if there is any Upper Pampanga
separate ENGP TB will be issued for this activity. Watershed
C. Survey, Assessment and Preparation of GIS generated map of all Remarks Text (255 char) Other relevant information Commodity change, etc.
planting sites programmed to be established for the succeeding year of Yr_CD String/text type Year the plantation was established 19
shapefile format, following the prescribed color, site code and with the SITE_ID String/text type Site number assignment 0001
corresponding completed attribute data/information AREA_CD String/text type Contracted area planted 0020
SOIL_N Text (50 char) Result of soil test on Nitrogen (N) content (Low, Medium, High) Medium
SOIL_P Text (50 char) Result of soil test on Phosphorus (P) content (Low, Medium, Low
High)
The prescribed color of polygons for CY 2017-2028 shall be as follows:
1. All identified planting site shall be subjected to perimeter survey and
RGB COMBINATION geotagged photos and shapefile using WGS 1984 datum.
YEAR COLOR 2. SMP shall identify areas into the following category or zone
RED GREEN BLUE i. Areas to be developed for production
ii. Areas to be developed for protection
2017 Free Speech Green 25 232 2 iii. Areas to be developed for conservation
iv. Areas for special treatments (Assisted Natural Regeneration (ANR)
2018 Olive Green 181 179 92
enrichment planting, densification, cover crop planting, non plantable areas, old
NGP sites)
2019 Red Berry 142 0 0 3. All areas identified for development or rehabilitation which had undergone SMP
and soil collection shall be certified by the head of DENR Field Office who
2020 Blizzard Blue 163 227 237 conducted the SMP and soil collection.
2021 Crusta 253 123 51 D. Planning- DAO 2019-03 section 5.3, states the activities to be undertaken in
the planning process of land development which requires the submission of a
2022 White Rock 2 37 237
reforestation/rehabilitation and restoration operation plan by forest landscape,
2023 Deep Pink 255 20 147
critical community or proclaimed watershed and/or conservation area.
2024 Wheat 245 222 179 Standard Cost: the cost of SMP is Php 550.00 per hectare as stipulated on the
Technical Bulletin I-A.
2025 Indigo 75 0 130