You are on page 1of 12

Government of the Punjab

CONSTRUCTION OF ROAD FROM GT ROAD


(MORE EMINABAD) TO EMINABAD UPTO
DISPOSAL LENGTH = 2.00 KM.

ADP NO. 2573 (2020-21)


CONSTRUCTION OF RCC ROAD FROM GT ROAD TO MORR EMINABAD UPTO
DISPOSAL STATION LENGTH 1.95 KM
DISTRICT GUJRANWALA.

EMINABAD

SI
D)

AL
( PA K PW
O AD

KO
AB A D R
EMIN

T
A TO

EM
AL EN
PIPLIW

KM 2
PO D

)
=1 UP

IN
IN

(L RO
5
T

.0

AB
G
CHAND

A
DA QILA

D
0K 1
M)

RO
0.9 P
(L= ROU
START

AD
POINT

G
SIALKOT
BYPASS N- 5 ( NHA )
A )
NH
-5(
N Legend:-
Allotted (Group 1)
Yet to be allotted (Group 2)
KHIALI BYPASS G.T ROAD/ N-5
Highway Road Road
Minor
CONSTRUCTION OF ROAD FROM GT ROAD (MORE EMINABAD) TO
EMINABAD UPTO DISPOSAL
LENGTH = 2.00 KM DISTRICT GUJRANWALA

▪ ADP 2020-21 Gs.No. 2573


▪ Allocation 2020-21 Rs.4.0+5.0=9.0 M.
▪ Approved Cost Rs.59.859 M.
Government of the Punjab

▪ 1st Revised approved cost Rs.59.733 M.


▪ 2nd Revised PC-1 cost Rs. 59.733 M.
▪ Length 2.00 Km.
▪ GROUPS
► Group No.1 2800-Rft(Allotted /In progress.
► Group No.2 3500-Rft.(Yet to be allotted)
▪ Existing Metalled Width 20’
▪ Formation Width 32’
▪ Metalled Width 24’
▪ Design & Scope
 Sub Base 4” Thick
► Rigid Pavement 8” Thick
► PCC 1:2:4 Shoulders.
► Construction of Hodi 68-No.
► Utility Ducts 10-No.
CONSTRUCTION OF ROAD FROM GT ROAD (MORE EMINABAD) TO
EMINABAD UPTO DISPOSAL
LENGTH = 2.00 KM DISTRICT GUJRANWALA

REASON OF REVISION
⮚ Some variations as per site requirement has been
Government of the Punjab

incorporated which are as under:-


❑ New rates of 2nd Bi-Annual 2020( 1st July to 31st December
2020) for Un allotted Group-2 incorporated in the instant
estimate.
❑ No of Inlet Chambers reduced as per site requirements.
❑ Dismantling of 1640 Rft PCC provided as per site
requirements.
❑ Length reduced by 100 Rft for compensation of cost.
CONSTRUCTION OF ROAD FROM GT ROAD (MORE EMINABAD) TO
EMINABAD UPTO DISPOSAL
LENGTH = 2.00 KM DISTRICT GUJRANWALA

COMPARISON OF COST
1st Revised
Sr. 2nd Revised PC-I
DESCRIPTION Approval
No. (Rs. in Million)
(Rs. in Million)
Government of the Punjab

1. Road Work 48.058 49.568


2. Road structure
5.483 4.033
3. Road Furniture
0.763 0.672
4. Contingency
1.629 1.628
5. Consultancy 1.086 1.085
6. 5% PST 2.714 2.713

Total Cost: 59.733 59.699


SCOPE COMPARISON
1st Revised
REVISED
DESCRIPTION APPROVED REMARKS
SCOPE
SCOPE
LENGTH 1.95- KM 1.92 – KM Length reduced due to
compensation of cost

METALLED WIDTH 24-ft 24-ft No Change

FORMATION WIDTH 40-ft 40-ft No Change

RIGID PAVEMENT 1.95 Km(24’) 1.92 Km(24’) Length reduced due to


compensation of cost

Pipe Culverts (24” dia) 02-No 02-No. No Change

In let Chambers (Hodi’s) 98-No 68-No No reduced due to


compensation of cost

Utility Ducts 10-No 10-No No Change


LINEAR PLAN OF ROAD.
GROUP 2 (YET TO BE ALLOTTED)
Government of the Punjab

9
GROUP 2 (YET TO BE ALLOTTED)
Government of the Punjab

10
GROUP 2 (YET TO BE ALLOTTED)
Government of the Punjab

11
GROUP 2 (YET TO BE ALLOTTED)
Government of the Punjab

12