Deformation Monitoring
Introduction to Monitoring
• What is Monitoring?
Monitoring is the systematic process of collecting, analysing and using information to track a programme’s progress
toward reaching its objectives and to guide management decisions. Understanding that asset’s behaviour through the
delivery of meaningful data and information.
• Monitoring involves:
The selection of sensors to meet a specific requirement
The integration of those sensors, both within and outside a structure
Observations
Data capture and transmission
Computational power and processing ability
Data and information presentation
Analysis and decision making.
GNSS
Delta Link – Key Feature Benefits
IP65
Delta Link – Connection ports
Delta Log – Key Feature Benefits
Local Grids
45
Create an arbitrary number of local coordinate
ing
systems,
ild
Bu
Reference movement vectors to structural axes
e.g. tunnel axes, building facades
n
tio
Easy to relate movement vectors to Structural
va
ca
Ex
axes
Eastern
Delta Watch – Key Feature Benefits
DELTA WATCH
processing
FTP transfer
LAN Communication
DELTA WATCH
processing
FTP upload
Remote
Desktop DELTA VIEW
Administration client licences
Australia | Sydney
North West Rail Link
Project: November 2014
Key Data:
• 2 Total Stations
• 60 prisms
Australia | Sydney
Wynyard Walk
Project: June 2013
Key Data:
• 5 Total stations
• 1,275 Monitoring Points
• 34 inclination sensors
• borehole Inclinometers
• 2 hydrolevel systems
Denmark | Copenhagen
Noerreport, Metrotrappe
Project: August 2013
Key Data:
• 1 Total Stations
• 35 prisms
Denmark | Copenhagen
Nordhavnsvej Road Construction
Project: October 2010
Key Data:
• 9 Total Stations
• 200 prisms
• 90 (load cells) leveling
points
• 48 borehole inclinometers,
• 12 vibrating wire strain gauges
Germany | Karlsruhe
Kombilösung
Project: May 2014
Key Data:
• 8 Total Stations
• >1,000 prisms
• >1,000 points
• 130 borehole inclinometers
• 200 extensometers
Germany | Ludwigshafen
Monitoring of Turbine Foundations
Project: December 2015
Key Data:
• 3 hydrolevel systems
Israel | Tel Aviv
Western Line Stations
Project: November 2015
Key Data:
• 7 Total stations
• 250 prisms
• 500 leveling points
• 50 borehole inclinometers
• 50 extensometers