Professional Documents
Culture Documents
Integrating process
1. Call the NOC
Call the NOC (+97336031969)
Inform the NOC the WO NO.
Check the existing alarm on site before the activity.
9/13/2014
DONE BY: MAHMOUD HASSAN
2. Check the Existing Alarm
Log in the DUW and check the existing alarms and take snapshots for both cases
clear or have alarm.
9/13/2014
DONE BY: MAHMOUD HASSAN
3. Preparation
Install the DUS and power it UP.
Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
9/13/2014
DONE BY: MAHMOUD HASSAN
a. Log in the DUS through Hyper.
10
9/13/2014
DONE BY: MAHMOUD HASSAN
3. Preparation
Uploading the packages.
9/13/2014
DONE BY: MAHMOUD HASSAN
B. Uploading the packages
9/13/2014
DONE BY: MAHMOUD HASSAN
B. Uploading the packages
169.254.1.11
169.254.1.10
9/13/2014
DONE BY: MAHMOUD HASSAN
B. Uploading the packages
9/13/2014
DONE BY: MAHMOUD HASSAN
B. Uploading the packages
9/13/2014
DONE BY: MAHMOUD HASSAN
B. Uploading the packages
9/13/2014
DONE BY: MAHMOUD HASSAN
B. Uploading the packages
9/13/2014
DONE BY: MAHMOUD HASSAN
B. Uploading the packages
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Commission
From tools select integrate the RBS
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Commission
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Commission
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Commission
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Commission
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Commission
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Commission
Check the DUS reachability with integration team.
If ok.
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Installation
We have two Types
1) Mixed Mode
2) Single Mode
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Installation (Mixed Mode)
Label the old jumpers with different colors.
Install the new RUS.
Connect Data1 to the DUS.
Connect Data2 to the DUG.
Log on the 1800 DUG and change the configuration as mixed mode and no of RUS.
Connect the GPS cable form the DUS to the 1800 DUG’s.
9/13/2014
DONE BY: MAHMOUD HASSAN
4. Installation (Single Mode)
Label the old jumpers with different colors.
Install the new triplexers.
Put the 1800 DUG in maintenance mode.
Connect the 1800 band old port to the new triplexers.
connect the jumpers to old 1800 RUS.
Remove the maintenance mode.
Connect the new jumpers to the LTE RUS.
9/13/2014
DONE BY: MAHMOUD HASSAN
5. Check the Existing Alarm
If the site is finished from the integration side.
Log in the DUS and check the alarm.
9/13/2014
DONE BY: MAHMOUD HASSAN
6. Call the NOC
Call the NOC (+97336031969)
Check the existing alarm on site After the activity.
Move to the next site…..
9/13/2014
DONE BY: MAHMOUD HASSAN
9/13/2014
DONE BY: MAHMOUD HASSAN