You are on page 1of 35

Contents need to

be refined to

Connect. Automate.
better connect to
next slide

Exploit emerging digital construction technologies to enable


clients, design teams, construction teams and the supply chain
to work more closely together to improve safety, quality and
productivity during construction.
5D
4D COST AND ESTIMATION
3D Estimating expenses,
PLANNING material management

3-DIMENSIONAL Construction timeline,


MODEL simulation of production,
2D logistics of execution
Visualization of project,
interdisciplinary, quantities,
DOCUMENTATION IFC/RVT
Construction plans,
2D drawings
Connect. Automate. With 5D BIM Model.
Introducing the new Cubicost TAS C-IV.
A 5D BIM Quantity Takeoff Solution to enhance productivity in construction.

Efficient Accurate Visualized


Common Pain Points in Construction

Challenges
1. Manual method of quantification of progress work done based
on demarcated 2D drawings and update to spreadsheet.

2. Require to progressively output not only work done by % of


completion, but also work done by trade. Time-constraint

3. No integrated solution to centralize and view information in


single source, giving rise to fragmented and outdated
information being used throughout construction. Error-prone Repetitive
What’s New in TASC-IV 2022 | Segmentation

New and Optimized

20% Check Segmentation

30% Define Work Done

50% Set Associated Segmentation


Set Associated Segmentation Optimization

Solution
1. Each trade work is clearly differentiated with
distinctive colors by defaults.

2. Now you can select any entity and associate


trade work to be included in a segmentation.

3. Quantities are segregated and displayed by


segmentations.

Progress Claim-1 : Formwork

Progress Claim-2 : Concrete


Flexible

Straight-forward
Optional. Only
include if time is
allowable.
Define Work Done

Solution
1. You can easily define the % of work done
for any vertical element to be quantified in
a segmentation.

2. Quantities are auto-calculated to the


defined % in respective segmentations.

% of work done defined by user


Reliable

Transparent

Up-to-date
Optional. Only
include if time is
allowable.
Check Segmentation

Solution
1. When cross-checking progress work done
submitted, you can easily switch between
segmentations to view respective
demarcation.

2. Mouse-over entity to view the associated


work done %.

3. Save in high-quality JPEG to substantiate


your interim payment application.

Intuitive

Useful
Optional. Only
include if time is
allowable.
Optimizations | TAS C-IV 2022

Project Attributes
1. Customize Attribute Display

2. Add Custom Attributes

3. Share Attribute Template


Project Attributes

Focus on what matters. More personal. More intuitive. More efficient.

Share Template

Add Custom Attributes Customize Attribute Display


Optimizations | TAS C-IV 2022

Auto Arrange - Beam & Wall


More efficient ways to draw beam and wall
Auto Arrange - Beam/Wall

Auto Arrange for Wall Auto Arrange for Beam

Create model 2x faster by auto arrange.


Efficient. Accurate. Flexible.
Optimizations | TAS C-IV 2022

Draw Steel Truss by


CAD Line
Faster way of modelling
Draw Steel Truss by CAD Line

Support | Shift +
Draw by CAD Line

Draw steel beams accurately and swiftly.


50% more efficient.
Efficiency Improvement in TRB C-IV 2022
Calculation
(for projects with fabric )

6 times
View Quantity

Drawing operation
40-90%
40-75%
Optimizations | TRB C-IV 2022

Beam Rebar – Densified


Links at Lap Joints
Beam Rebar – Densified Links at Lap Joints

Now additional calculation setting


is added to common settings of
beam to enable densified links.
Adding Rebar Strength

* Extracted from SNI 07-2052-2017

Added 7 new rebar strengths & 12 new rebar types based on SNI.
Optimizations | TRB C-IV 2022

Local Staircase Parametric


Template
Local Staircase Parametric Template

Only frequently used


templates based on
investigation.

Add thread rebar.


Optimizations | TRB C-IV 2022

Beam Rebar - Lap Splice


Location (ACI ONLY)
Beam Rebar - Lap Splice Location (ACI ONLY)

Before After
Optimizations | TRB C-IV 2022

Parametric Arrangement for


Non-Rectangular Slab
Parametric Arrangement for Non-Rectangular Slab

Before After
Optimization | UI & UX

Redesigned. Informative.
All-New Start View of TAS & TRB

More Intuitive. More Helpful.


Search File or even Answer to Your
Question At Ease
All-New Start View of TAS & TRB
Software New File Navigation Tab Glodon eCommunity Quick
Update (Local/Cubicost Cloud) Access
File
Menu

FAQ & News

New
Navigation
Bar
Search File or Help At Ease

Enhanced Quick Search can show various results –


Command, eCommunity & Help Center.
Project Group can organize your project files in groups; Filter
can easily locate the group and its files; Expand/Fold to make it Help you quickly locate function in toolbar.
looked more focused.
To replace with
another image
E-Learning

Use the new filter bar to help you quickly find Quick Start Guide to get 1st
contents you’d like to learn timer to onboard

Latest training courses are updated periodically.


You can always learn new skills or even refresh your skills at your preference.
Information Portal

Learn about what’s


happening
Success stories in Glodon
from our star users
across the nation to
inspire you to build
a better brand
image with Recent News / FAQ
Cubicost
Glodon eCommunity Quick Access
Thank You!
www.glodon.com

You might also like