Professional Documents
Culture Documents
• GAP adds
– interactions occurring in surface network
• E.g. Back pressures depend on other wells
– Extra equipment
– More extensive constraints, precise control and detailed analysis
Purpose of GAP
• Network modelling
– Determine all pressures, pressure drops, temperatures, rates etc.
from source (reservoir), through wells and flowlines to Separator
Riser
• Determining optimal operation
Manifolds
Wells
Tanks
What do we need?
Pipeline
Well
•50 ft Long
•Oil Well 2 •8” Diameter
•PI = 200 STB/d/psi •0.0006” Roughness
•GRE (modified by PE)
•Oil Well 3
•PI = 150 STB/d/psi
And Now … Using GAP
Gas Lifted Example
Example 2 – Gas Lifted
•1.7 MMscf/d - Well 2
•2.5 MMscf/d – Well 3
•1” Fixed Choke •1 MMscf/d – Well 4
•1.8 MMscf/d – Well 5
•0.8 MMscf/d – Well 6
•Total 7.8 MMscf/d •120 psig
•61.6 Deg F
•8 BTU/h/ft2/Deg F