QA/ QC Report

Date: 5 July 2014

Subject: Witness of Receiving the 5 Well Head and X- Tree from THARWA-BREDA
PETROLUM SERVICES at R/SH Materials Stock .

A Visit was made by Gupco QA/QC , Eng. Bassem Khafaga and Eng. Mohamed Said Ibrahim .

The following documents were reviewed and were compared with contents of the wooden box
with Packing Document :
Figure 1: Show Inventory 2 1/16’’ Manual Gate valve (3000Psi and 5000Psi).

Figure 2: Shows Inventory the protectors & Studs and bolts.


Figure3: Shows inventory Tubing Hanger &Ring Gasket &Wear Busing & Pressure Gauge And
Sharp VEE valve remove .

Figure4: Shows 4 1/8” X-Tree Solid Block .


Figure 5 :Shows 133/8’’ Tubing Head spooling .

Figure 6:Shows 11’’ NOM Tubing Hanger assembly .


Figure 8: Shows 135/8’’ Nom Wear Bushing .

Figure 9: Shows 135/8’’ Casing Head Housing .