1. From Client Insulation Specification / Procedure / Details - 2577M-00-P-1532-03, there is no
specification for insulating the 4-Way valve and its actuator cylinder, as-is on site. Confirm that we are to insulate the 4-Way valve and its actuator cylinder. If yes, provide us with Valve Details drawings for the 4-Way Valve and its actuator cylinder. 2. The Pipe Support Details drawings sent to us is showing pipe shoes details, but the as-is on site is pipe saddles and trunnions. Provide us with Pipe Support Details drawings for pipe saddle and trunnions. 3. From Client Insulation Specification / Procedure / Details - 2577M-00-P-1532-03, supports, stiffeners, rings, girders attached to vessels, tanks, and exchangers shall have the same insulation thickness as that for the equipment insulation thickness. Confirm that the trunnion attached to the launcher and receiver shall have an insulation thickness of 4 times that of the equipment insulation thickness. This was not confirmed during our site visitation / inspection.
Zadco'S Value Assurance Process ةق يرط لا ةع ب ت م لا ي ف ةكرش او كداز نامض ل ةظ فاحم لا ىل ع ةي مق لا ةب س ت ك م لا By Zaid Hashem Al Habshi Student ID number 110028