Professional Documents
Culture Documents
Keunggulan :
Menghemat pemakaian volume beton
Mudah dan cepat dalam pemasangan
Sebagai pengganti tulangan positip satu arah
Sebagai bekisting & lantai kerja
Transportasi ringkas
SPECIFICATION KRUPPDECK 1000 :
TM
A
C
B
D
POTONGAN A-A
POTONGAN B-B
APLIKASI KRUPPDECK PADA KONSTRUKSI BETON
3. Detail Pemasangan Kruppdeck KD-1000 pada Dinding
DETAIL
4. Detail Arah Pengecoran pada Kruppdeck KD-1000
2. TEGAK LURUS RIB
1. SEARAH RIB
Correct storage of panel bundles on site
Placing of deck should be follow the sequence
Pouring by using of buggy
Pouring by concrete pump
Correct lifting arrangements for panel
bundles. (a) Short panels. (b) Long panels
Heavy loads on over support
Local Loads on decking before pouring
concrete: (a) Loads above supports. (b)
Loads in mid-span
PENGUJIAN TERHADAP KETAHANAN API (KEBAKARAN)
PENGUJIAN TERHADAP GESER
Hotel Grand Royal Project Hotel Buana Project
Kantor Optic Seis Project Pusat Grosir Metro Tanah Abang Project
TYPICAL CONIC FRAMING PLAN AND
DETAIL INCORPORATING KRUPPDECK
3
4
3
1
1
5
5
3
3
1
1
2
4
2
4
1
1
SHEAR
CORE
1
1
6
3
3
1
1
- BEAM FRAMING PLAN
MAIN BEAM ( MARK 1, 2 )
PERIMETER BEAM ( MARK 3, 4 )
4
4
- Page 1/3
DETAIL INCORPORATING KRUPPDECK
SECTION 1 - 1
SECTION 2 - 2
- Page 2/3
DETAIL INCORPORATING KRUPPDECK
SECTION 4 - 4
SECTION 3 - 3
SECTION 5 - 5 Detail 6
- Page 3/3