You are on page 1of 1

Route Hazard Alert

Date 23 Sep 2022


Type of Hazard
Location Access road to South Buzdar
Temporary 
Identified by Waseem Ahmed
Permanent

A pothole developed on the culvert at link road of South Buzdar


Details
facility near Saand Mor.

• Repair work of damaged culvert is required, because


route is being used by UEP light & heavy vehicles. Also,
the rig move is planned at this route.
• Cordon off the damaged portion
Recommendations • Stay extra cautious while passing through the affected patch,
particularly in the night.
• Advance scanning and timely observation of hazards is
mandatory.
• Reduce speed.
• Brief the drivers & share the alert.

Potential Impact

Health

Safety 

Environment

Property

Damage

Reputation

Business
Interruption

Security

You might also like