Prepared by: Dr. Ismail Ladipo, Reviewed by: Baraa Yousuf and Dr. Muawia Ramadan.
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Materials in this course are based on the text, A Guide to the Project Management Body of Knowledge (PMBOK® Guide), Sixth edition, Project Management Institute, Inc.
Learning Objectives
◦ Recognize the fundamentals of Project resources
◦ Understand the various types of resources
◦ Distinguish Project resource management
processes
◦ Create estimations for Project resources
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Overview
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Overview contd.
The Project management processes ensures that the right
resources in the right quantity will be available to the project
team at the right time and place.
Types of resources :
Physical resources - Equipment, materials, facilities
and infrastructures.
Human resources - Personnel (human beings).
To manage a project successfully, there is need to estimate
properly the required team resources as well as physical
resources.
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Project Resource
Management
Overview
(Inputs, Tools &
Techniques, and Outputs of
the Project Resources
Management processes)
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute Inc., 2017, Page 308.
Resource Management Mind
Map
Monitoring
Planning Executing and
Controlling
Plan
Acquire Control
Resource
Resources Resources
Management
Estimate
Develop
Activity
Team
Resources
Manage
Team
Project Resources Management Process
* Plan Resource Management - The process of defining how to estimate, acquire,
manage, and utilize physical and team resources.
* Estimate Activity Resources - The process of estimating team resources and the
type and quantities of material, equipment, and supplies necessary to perform
project work.
* Acquire Resources - The process of obtaining team members, facilities, equipment,
materials, supplies, and other resources necessary to complete project work.
* Develop Team - The process of improving competencies, team member interaction,
and the overall team environment to enhance project performance.
* Manage Team - The process of tracking team member performance, providing
feedback, resolving issues, and managing team changes to optimize project performance
* Control Resources - The process of ensuring that the physical resources assigned and
allocated to the project are available as planned, as well as monitoring the planned
versus actual use of resources, and performing corrective action as necessary .
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
*These definitions are taken from the Glossary of Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition,
Project Management Institute Inc., 2017.
Activity1- Quiz on
Nearpod
RESOURCE MANAGEMENT
10/29/2022 9
Estimate Activity Resources
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute Inc., 2017, Page 321
What is Estimate Activity
Resources ?
This is the process of estimating team
resources, type and quantities of material,
equipment, and supplies necessary to perform
project work.
The main benefit of estimating activity
resources is that it determines the type, quantity,
and characteristics of resources required in a
project.
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Planning Resources Activity # 1
Project:
Write an online textbook People
on Programming with
Python.
Deliverables:
1. e-book Equipmen
t
2. Lab exercises
3. Solutions
Material
Planning Resources Activity # 2
Project:
People
Build a gaming lab
@ Dubai Campus
Deliverables:
1. 5 gaming Equipmen
stations t
2. Furniture
3. Mobile app to
track usage
Material
Activity2-
Collaborate on
Nearpod
PLANNING RESOURCES – UPLOAD IMAGE
10/29/2022 14
Estimate Activity Resources
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute Inc., 2017, Page 321
Estimate Activity Resources
Inputs:
Project Management Plan
• Resource Management Plan – The resource management plan is part of the project
management plan that provides information. These information includes but are
not limited to rates (personnel and other resources), estimation of travel costs, and
other foreseen costs that are necessary to estimate the overall project budget.
• Scope Baseline -The scope baseline includes the project scope statement, WBS,
and WBS dictionary.
Projects documents – Some of the documents in a project that can be considered as
inputs for this process include:
• Activity attributes
• Activity list
• Assumption log
• Cost estimates
• Resource calendars
• Risk register
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Estimate Activity Resources
Inputs (Cont.):
Enterprise Environmental Factor
• Resource location
• Resource availability
• Team resource skills
• Organizational culture
• Marketplace conditions
• Published estimating data
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Estimate Activity Resources***
Tools and Techniques for Estimation:
Expert Judgement
Bottom-up Estimating
Analogous Estimating
Parametric Estimating
Data Analysis
Project Management Information System
Meetings
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Technique Features Example
Expert Ask domain experts PM asks a software engineer
Judgement for durations for building an
app
10/29/2022 23
Estimate Activity Resources
Outputs:
Resource Requirements
Basis of Estimates
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Estimate Activity Resources
Outputs contd.
Resource Requirements –
This contains the type and quantity of resources required for
each work package or activity in a work package.
The resource requirements documentation can include
assumptions that were made in determining which types of
resources are applied, their availability and what quantities are
needed.
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Estimate Activity Resources
Outputs contd.
Basis of Estimates*
◦ Method used in developing estimate.
◦ Resources used to develop estimates.
◦ Assumption associated with estimates.
◦ Known constraints.
◦ Range of estimates.
◦ Confidence level of estimates.
◦ Documentation of identified risk influencing the
estimates.
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
*Based on Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute Inc., 2017,
Page 326.
Resource Breakdown Structure
Sample***
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
*Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute Inc., 2017, Page
327.
What is the Resource
Breakdown Structure? Write a
short definition in your own
words.
Group
Activity
10/29/2022 29
Estimate Activity Resources
Outputs contd.
Project Documents:
Documents that are updated in the estimate activity
resources includes:
Activity attributes
Assumption log
Lesson learned register
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
Apply the correct estimation technique
Write down the estimating technique used in each scenario below.
1. Omar calls the contractor who installed the new computer network at SWC.
He asks him how much resources will be needed to upgrade the SMC
network based on the new requirements.
2. Saif creates a spreadsheet with all of the historical information from similar
network upgrade projects. He types in the desired length and the square
footage of the room to calculate an estimated cost and quantity of resources.
3. Yousef estimates each and every activity and resource that he is going to
need. Then he adds up all of the estimates into “rolled-up” categories. From
there he adds up the categories into an overall number.
4. Hamad sets up an appointment with the same contractor his friend used. The
contractor comes to the clinic, takes a look, and then gives an estimate of the
resources needed for the work.
Activity 6- Quiz on
Nearpod
RESOURCE ESTIMATION
10/29/2022 32
Resource Management -
Executing
Acquire Resources
❏ Acquire Resources is the
process of obtaining team
members, facilities,
equipment, materials,
supplies, and other resources
necessary to complete project
work.
❏ The key benefit of this process
is that it guides the selection
of resources and assigns them
to their respective activities.
❏ This process is performed
throughout the project as
needed.
34
Resource Management - Executing
Manage Team
❏ Manage Team is the process
of tracking team member
performance, providing
feedback, resolving issues,
and managing team changes
to optimize project
performance.
❏ The key benefit of this
process is that it influences
team behavior, manages
conflict, and resolves issues.
❏ This process is performed
throughout the project
35
Resource Management - M&C
Control Resources
❏ Control Resources is the process of
ensuring that the physical resources
assigned and allocated to the project
are available as planned, as well as
monitoring the planned versus actual
utilization of resources and taking
corrective action as necessary.
❏ The key benefit of this process is
ensuring that the assigned resources
are available to the project at the right
time and in the right place and are
released when no longer needed.
❏ This process is performed throughout
the project.
36
Activity 7- Quiz on
Nearpod
ACQUIRE AND CONTROL RESOURCES
10/29/2022 37
Summary
Project resource management is an important aspect
of project management that involves planning,
managing and controlling all the types of resources in
project management.
Estimate activity resources is found in the project
resources management knowledge area and planning
activity group.
Failure to efficiently manage the team and physical
resources can lead to PROJECT FAILURE.
The PMI Registered Education Provider logo is a registered mark of the Project Management Institute, Inc.
End of Lesson Checklist
Task Status
Review slides