(ROAD PROJECT)
PHILIPPINE RURAL DEVELOPMENT PROJECT TITLE: (H) Hold
Sub-Poject Title: Revision No.: (W) Witness
Location: Page 1 of 3 (S) Surveillance/Monitoring
(X) Self Inspection
Submitted by: Reviewed By: Recommending Approval Approved By: cc: PSO/NPCO
__________________ _______________________ _______________________ _____________________
PROJECT MANAGER (CONTRACTOR) PPMIU ENGINEER PPMIU HEAD LCE PARO II Head
MINIMUM MATERIALS AND TESTING REQUIRMENT for PRDP
IN SUMMARY
“Quality can not be
inspected in a
structure. It has to
be built into it.”
TESTING
Recognize the basic technologies in testing of
construction materials.
work.
If the test is not conducted at the proper time, there is no
quality control since it will then be too late to correct anything
that is defective.
T. Urmaza
S. Orate CLARITA C. FLORES
J. Tagalo Engine e r V
J. Be rgonio
C. de la Cruz ATTESTED :
Witnessed by:
Const. Of 2 Storey RGR Type Sch. Bldg. At Dona Ma. Platon Laurel, Aya, Talisay, Bats.
Project : Const. Of Circumferential Road Around Lake Taal, Agoncillo, Bats.
Completion of Aya-Tranca-Talisay Road, Talisay, Bats.
Kind of material : Reinforcing Steel Bar ( 16 mm dia., deformed )
Sample identification : DMP- 5
Quantity represented : 10,000 kgs.
Sampled at : Stockpile at jobsite
Original source : Top Steel
Supplied by : Revere Construction & Supply
Proposed use : for concrete reinforcement
Spec's Item No. : PNS 49 Grade 275 NW
Sampled by : F. Opena,Lab. Tech. II DPWH-Bats. 3rd DEO 06-08-06
(Name & designation) (Office) (Date)
Submitted by : Ma. B. M. Marquez - do - 6-14-06
(Name & designation) (Office) (Date Received)
Lab. No. : 1718-06 ( Paid under OR No. 2595342 )
Witnessed by:
(Date)
TEST REPORT ON CONCRETE MASONRY UNITS
Project : Construction of 2 Storey RGR Type Sch. Bldg. At Dona Ma. Platon Laurel, Aya, Talisay, Bats.
Type of Unit : Concrete Hollow Blocks (Non Load Bearing) 4" thick
Quantity represented : 10,000 pcs.
Sampled at : Stockpile at jobsite
Original source : Allied
Supplied by : REVERE Construction & Supply
Proposed use : for walling
Spec's Item No. : ASTM C-129 ( Non- Load Bearing )
Sampled by : N. Magnaye Revere Cons't. & Supply 06-08-06
F. Opena,Lab. Tech. II DPWH-Bats. 3rd DEO 06-08-06
(Name & designation) (Office) (Date)
Submitted by : Ma. B. M. Marquez - do - 6-16-06
(Name & designation) (Office) (Date received)
Lab. No. : 1720- 06 ( Paid under OR No. 2595342 )
SAMPLE I.D. TESTS REQUIREM ENTS RESULTS
T. Urmaza
A. Emperador CLARITA C. FLORES
J. Tagalo Engine e r V
J. Bergonio ATTESTED:
Witne s s e d by :
Project : Concreting of Road, Barangay II, San Carlos City, Negros Occidental
Sample identification : CRBII-01
Quantity represented : 2000 bags
Sampled at : Jobsite
Manufactured by : Taiheiyo Cement Phils., Inc., San Fernando, Cebu City
Brand : Grand Portland Cement
Supplied by : Kuntel Construction
Spec's Item No. : ASTM C-150
Sampled by : R.dela Cruz/J.Yanson DPWH-Neg. 1st EDO/Kuntel Const. 6-16-06
: (Name & designation) (Office) (Date)
Submitted by : N.A. Noble-Engr. III DPWH-Neg. 1st EDO Neg. Occ. 6-20-06
: (Name & designation) (Office) (Date received)
Lab. No. : 1741-06 (Paid under OR # 2595384)
TESTS REQUIREMENTS RESULTS
Magnesium Oxide (MgO), % 6.0 Max. 1.30
Sulfur Trioxide (SO3), % 3.0 Max. 2.47
Loss on Ignition, % 3.0 Max. 4.70*
Insoluble Residue, % 0.75 Max. 1.10*
Air Content of Mortar, % 12.0 Max. -
Fineness : Amount Passing
No. 0.075 mm Sieve, % - 99
Autoclave Expansion, % 0.8 Max. 0.03
Time of Setting : Gilmore Test
Initial set, min. 60 Min. 120
Final set, min. 600 Max. 253
Compressive Strength, Avg. mortar
cubes, Mpa:
3 days 12.0 Min. 19.0
7 days 19.0 Min. 17.5
28 days 28.0 Min. 23.0
Specific Gravity - 3.09
REMARKS: * Sample fails to meet Specification requirements.
Tested by: Checked by:
P. Malonzo
B.A. Minano
E. Cruz CLARITA C. FLORES
E. Flores Engineer V
M. S. Gianan ATTESTED :
Witnessed by:
Witne s s e d by: