PARAMETERS
1. Project Location and Limit
Verification of limits of the project if in
accordance with the approved contract and
plans
2. Scope of Works
Verification of programmed quantity if in
accordance with the scope of works
Assessment of individual items in the
approved Program of Works (POW) and
approved plans
Assessment of all other items not included in the
approved Program of Works (POW) but essential
in the project
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
Verification of dimensions
(thickness, height, width,
slant height, slope, etc.)
Provision of Berm
(if height is more than 3.0m)
Verification of sufficiency of
mortar grout (1:3 cement-sand)
Verification of placement of
stones/boulders
Verification of weephole size,
spacing, alignment and
installation
Verification of gravel filter
backing
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
Verification of dimensions
(thickness, height, width,
slant height, slope, etc.)
Verification of rock backing
Provision of Berm
(if height is more than 3.0m)
Verification of sizes of stones
T=150mm and larger
W=1.5T
L=1.5W
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
Verification of sufficiency of
mortar grout (1:2 cement-sand)
20-50mm
Verification of placement of
stones/boulders
Verification of weephole size,
spacing, alignment and
installation
Verification of provision of
end anchorage
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
Verification of workmanship
Verification of alignment
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
6. Concrete Revetment/Structure
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
6. Concrete Revetment/Structure
Foundation
Cut-Off Wall
Verification of type of
cut-off wall (RC or rubble concrete)
Verification of cut-off
wall elevation
Verification of cut-off wall
dimensions (height, thickness,
length)
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
Foot Protection
Gabions Spurdike
Verification of spacing
Verification of height
Verification of alignment
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
Gabions Spurdike
Gabions Spurdike
Verification of the required eight (8) cross-connecting
wires
Verification of soundness test of boulders
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
Mattresses
Verification of alignment
Verification of boulders (size and placement)
Verification of filter cloth provision
Verification of the required eight (8) cross-
connecting wires
Verification of the diameter of the Mattress wires
(Selvedge , body , tie wires)
Verification of conduct of soundness test of
boulders
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
8. Earthdikes (Embankment)
Department of Interior and Local Government
Assistance to Disadvantaged Municipalities
Verification of sideslope
Side Slope both on the river and on the land
sides if in accordance with the Approved Plan
Provision of Berm (if height is more than 3.0m)