equipment
life can be
defined in
three ways:
physical life,
profit life,
and
economic
(Cont…)
One can see in the graph that over the physical life of the
machine, it takes sometime for the new machine to earn
enough to cover the capital cost of its procurement.
It then moves into a phase where the equipment earns more
than it costs to own, operate, and maintain, and finishes its life
at a stage when the costs of its maintenance are greater than
what it earns during the periods when it is in operation.
4.3.2.1 Physical life
equipment’s life.
The minimum cost method fits very nicely into a public construction
agency’s equipment management policy as the focus on replacing
equipment at a point in time where the overall cost of operating and
maintaining a given piece of equipment is minimized and hence the
strain on the taxpayer is also reduced
The maximum profit method furnishes a model for construction
contractors and other entities that utilize their equipment in a profit-
making enterprise to make the replacement decision with an eye on
their bottom line.
Theoretical Method (Cont…)
Equipment downtime-
the major unidentifiable machine factor that has
considered effect on productivity.
Estimated to raise up to 22% for heavy construction
equipment.
Includes
Administrative time
Maintenance time
Supply time
Cost of Down time
Repair cost
Idle related resource cost /personnel and/or
equipment
Loss of productivity costs/disruption,new
learning,moral/
Contract related costs /Liquidated
damage,escalation,disruption/
Other costs:extended overhead cost,extended
overtime,accelaration cost/
CONSEQUENCES OF DOWN
TIME
Idleness of equipment
Idleness of crews
Work disruption
Activity delay
Loss of productivity
B. Operator factors
Your machine is as good as its operator.
What is the Way out?
Technical capability
Improve by providing appropriate training and skill
up grading fitting to modernization of equipments.
Work ethics and moral
Creates awareness
Provide appropriate benefits
Establish proper controlling system
C. Working conditions
Space constraints
Weather and climate effects
Organization of the work structure
D. Management factor
Proper equipment fleet management policy
Organization culture
Project management level
Plan & avoid suprises!