QUALITY
“THE DEGREE TO WHICH A SET OF INHERENT
CHARACTERISTICS FULFILL REQUIREMENTS” (ISO 9000 [18].).
GRADE
GRADE IS A CATEGORY ASSIGNED TO PRODUCTS OR SERVICES
HAVING THE SAME FUNCTIONAL USE BUT DIFFERENT TECHNICAL
CHARACTERISTICS
2
MODERN QUALITY
MANAGEMENT
CUSTOMER SATISFACTION
( CONFORMANCE TO REQUIREMENTS & FITNESS FOR USE )
CONTINUOUS IMPROVEMENT
( PLAN-DO-CHECK-ACT ) CYCLE
MANAGEMENT RESPONSIBILITY
( RESPONSIBILITY OF MANAGEMENT TO PROVIDE THE RESOURCES NEEDED TO SUCCEED)
8
TAILORING CONSIDERATION
Stakeholder Engagement
Continual Improvement
AGILE & ADAPTIVE ENVIRONMENT
Regular check
Retrospective meeting
4- Project Integration Management 4.1 Develop Project Charter 4.2 Develop Project Management Plan 4.3 Direct and Manage Project 4.5 Monitor and Control Project 4.7 Close Project
Work Work or phase
4.4 Manage Project Knowledge 4.6 Perform Integrated Change
Control
5- Project Scope Management 5.1 Plan Scope Management 5.5 Validate Scope
5.2 Collect Requirements 5.6 Control Scope
5.3 Define Scope
5.4 Create WBS
6- Project Schedule Management 6.1 Plan Schedule Management 6.6 Control Schedule
6.2 Define Activities
6.3 Sequence Activities
6.4 Estimate Activity Durations
6.5 Develop Schedule
7- Project Cost Management 7.1 Plan Cost Management 7.4 Control Costs
7.2 Estimate Costs
7.3 Determine Budget
8- Project Quality Management 8.1 Plan Quality Management 8.2 Manage Quality 8.3 Control Quality
9- Project Resource Management 9.1 Plan Resource Management 9.3 Acquire Resources 9.6 Control Resources
9.2 Estimate Activity Resources 9.4 Develop Team
9.5 Manage Team
10- Project Communications 10.1 Plan Communications Management 10.2 Manage Communications 10.3 Monitor Communications
Management
11- Project Risk Management 11.1 Plan Risk Management 11.6 Implement Risk Responses 11.7 Monitor Risks
11.2 Identify Risks
11.3 Perform Qualitative Risk Analysis
11.4 Perform Quantitative Risk Analysis
11.5 Plan Risk Responses
12- Project Procurement 12.1 Plan Procurement Management 12.2 Conduct Procurements 12.3 Control Procurements 12
Management
13- Project Stakeholder 13.1 Identify Stakeholders 13.2 Plan Stakeholder Engagement 13.3 Manage Stakeholder 13.4 Monitor Stakeholder
Management Engagement Engagement
DIFFERENCE BETWEEN QUALITY
PROCESSES
Plan Quality Management Manage Quality Control Quality
Planning Implementation Control
Determine which quality standards are Determine if the quality measurement is relevant Perform the measurement and compare
relevant and how to measure them to the plan
PLAN QUALITY MANAGEMENT
7 5 4
6
Vendors Change control Artwork
Artwork out
Make proofs approved
For proofs Of specs
yes
no no
8 10
Package 9 Approved
yes yes
development /QA review Proof back
/Review approval To vendor
approval
11
12
Specs signed
Order material
)package and QA (
CRITERIA ARE PRIORITIZED AND WEIGHTED BEFORE BEING APPLIED TO ALL AVAILABLE ALTERNATIVES TO OBTAIN
A MATHEMATICAL SCORE FOR EACH ALTERNATIVE. THE ALTERNATIVES ARE THEN RANKED BY SCORE
MATRIX DIAGRAMS
LOGICAL DATA
MODEL
LOGICAL DATA MODELS ARE A VISUAL REPRESENTATION OF AN ORGANIZATION’S DATA, DESCRIBED IN BUSINESS
LANGUAGE AND INDEPENDENT OF ANY SPECIFIC TECHNOLOGY.
THE LOGICAL DATA MODEL CAN BE USED TO IDENTIFY WHERE DATA INTEGRITY OR OTHER QUALITY ISSUES CAN ARISE
MANAGE QUALITY
23
Cause of late time entry
35
30
25
20
15
10
5
0
Insufficient Management Process System
Travel
Time Direction Documentatio Failure
Series1 22 3 30 3 16
type or category
their frequency
followed up
Pareto's Law
Scatter diagrams can demonstrate a relationship between any element of a process, environment, or activity on one axis and
LCL
LSL
Time
USL- upper specification limit UCL-upper control limit
USL
UCL
LCL
LSL
Time
USL- upper specification limit UCL-upper control limit
36
1) EVALUATING OVERALL PROJECT PERFORMANCE
REGULARLY IS PART OF :
A ) QUALITY MANAGEMENT.
B ) QUALITY ASSURANCE.
C ) QUALITY PLANNING.
D ) QUALITY CONTROL.
37
2 ) PARETO CHARTS HELPS THE PROJECT MANAGER:
38
3 ) WHICH OF THE FOLLOWING IS TRUE OF INSPECTIONS?
39
4 ) A CONTROL CHART SHOWS THAT THE LAST EIGHT PIPES PRODUCED WERE
ALL LESS THAN AVERAGE WEIGHT. YOU NEED TO INFORM MANAGEMENT
THAT THERE IS A PROBLEM BECAUSE THE SITUATION VIOLATES THE :
A ) RULE OF SEVEN.
B ) RULE OF EIGHT .
C ) 50/50 RULE.
D ) 3 SIGMA RULE. 40
5 ) WHICH OF THE FOLLOWING HELPS A PROJECT MANAGER
DETERMINE POSSIBLE CAUSES OF POTENTIAL PROBLEMS AND
ACTUAL PROBLEMS?
B ) A FISHBONE DIAGRAM
C ) A CONTROL CHART.
D ) A PARETO CHART . 41
6 ) ALL THE FOLLOWING ARE NOT EXAMPLES OF
QUALITY ASSURANCE EXEPT?
A ) INSPECTION.
B ) PROCESS ANALYSIS.
C ) PARETO CHART.
D ) FISHBONE DIAGRAM.
42
7 ) FIVE OF THE SEVEN PHASES ON THE PROJECT CONTAIN WORK
THAT IS SIMILAR. WHAT MUST THE PROJECT MANAGER DO?
A ) SEE WHAT CAN BE DONE TO MAKE SURE THE WORK IS CAREFULLY REWORDED TO
REMOVE SIMILARITY.
B ) MAKE SURE THE SAME RESOURCE COMPLETES ALL THE SIMILAR WORK
PACKAGES.
D ) MAKE SURE THE FIRST AND LAST OF THESE WORK PACKAGES IS SCHEDULED43
CLOSE IN TIME TO EACH OTHER.
8 ) WHEN A PRODUCT OR SERVICE COMPLETELY MEETS
A CUSTOMER’S REQUIREMENTS :
A ) QUALITY IS ACHIEVED.
45
10 ) BY POLICY THE PROJECT MANAGEMENT OFFICE REGULARLY
EVALUATES THE PROJECT PERFORMANCE. THIS IS DONE IN ORDER TO
ENSURE STANDARDS ARE BEING FOLLOWED. THIS EXAMPLE OF:
C ) Quality planning.