Tech Construction
Road map 2020
DATE: 17TH JULY 2020
Version:1
Content
• Current situation
• Work Flow
• Analysis
• Proposal
• Upgradation Mechanism.
Current Situation-where are we?

Tender listing Recommendation Apply


• All tenders relating to • Shortlisted Tenders are studied • BOQ is prepared and shared to
and green signal provided by Prabin Dai for cross verification
 Building
Barna dai and Prabin dai.
• All Bid Documents are prepared
 Road and applied.
 Bridges • Started applying Bid from
 Irrigation February 2020.

• Above 5 crore enlisted in • Till todays date 15 bids have


bolpatra been applied.

• Share on “What's app” Group.

Where are we?


Hunting Stage

Non of the Bid have been awarded.


Current Channel

Dillen
1. Finalization of
Dillen BOQ discussing
Dillen
1.Prepare BOQ with Binod Mama /
Prabin / Barna Dai 2. Prepare all Bid Prabin dai and
1.Bid listing above documents. Aayus Dai then get
5 crore 1:Recommendation the maximum
for bid apply 3. Bid security below rate.
2.Sharing daily bid generation by
list on whats app Aayus dai. 2. Upload all
group documents and
apply for the BID.
Analysis
• Started applying Bid from February 2020.
• Total Bid Applied 15.
• Till date 13 bid result have already been published and 2 bid yet to be published.
• Our Bid price is 3-17% higher that the Bid that have been accepted.
• In average take13% difference.
  Danfe Detail Bid Awarded detail  
Project Title Bid Price Tentative amount Less% Bid Winner Bid winner amount Less% Bid difference

Construction of Biratnagar 5,6,11,12 to Jogbani Border Dev & Sayar- ISNB j,V
363,947,595 440,000,000 17.28463747 296309566.7 32.6569167 -15.37227919
Road, Morang Janakpur, Dhanusha

Construction of Itahari 5 (Miteri Pul) to Madanmarga, Rautaha Construction,


241,194,055 292,000,000 17.39929636 197944182.1 32.2108965 -14.81160017
Sunsari Triyunga-2, Udaipur

Construction of Budiganga-1 Puspalal Chowk Navajyoti


Marga Khadra Tol west canal To Manmohan Polytechnic 226,708,137 248,000,000 8.585428569 Sharma-Sagun, JV Butwal 184505149.5 25.6027623 -17.01733373
Road

Upgrading works on Piplebhanjyang Simle Khatar


148,530,821 160,000,000 7.168237037 Kancharam Jv   23 -15.83176296
Hayutaar Road, Sindhuli

Sindhulimadi Bhumesthan Chakmake Udaypur Katari


390,728,064 520,000,000 24.85998768 Ashish Nirman sewa   37 -12.14001232
Road, Sindhuli (CH: 0+000 to 14+560 km)

Upgrading works on Ward No. 3, Sola Bhanjyang


Taruphedi Golanjor-7, Khurkot Road, Sindhuli Chainage : 137,554,934 220,000,000 37.47503007 Lama Oiva Khadka J.v   41 -3.524969927
0+000-7+712Km
Why non of Bids awarded yet?
• All we can assume is:
• Our Bid Price higher than other Bidders.
So why our Bid Price Higher than others?
• May be other bidders have more owned equipment's.
Findings: Sindhulimadi Bhumesthan Chakmake Udaypur Katar, Ashish have ongoing project near by area, where all equipment's and resources were already on stock after
completion of near by project by which they have been able to quote the bid price up to 37% below tentative amount.

• Leakage of our quotation.


• Because accepted bid is proportionately 15 % lower than our Bid price on Morang’s 3 Tenders.

Findings: Danfe have Old employees who have already resigned but still knows the User and Password of EGP>
Solution: We have already changed the user and password.

• Other Bidder might have some channel


• May be our Bad luck and we need to try yet more.
Proposal

• Register O.Tech Construction on EGP


• Get the license so that we can apply for small tenders from O.Tech Construction itself.
• Listing for small projects of Kathmandu Valley, ( Kathmandu, Bhaktapur, Lalitpur) and proceed further for Bid process
via O.Tech Construction.
• Register on Tender sewa to know the Bid result and improve bid listing more precisely.
O Tech Construction License requirement
In order to get License for D class Construction below are the requirement
• Authorized Capital Requirement : 5 Lakhs
• Vat/ Pan registered
• Resource:
• Civil engineer-1
• Certificate of civil engineer
• Appointment letter of civil engineer
• Project Manager -1
• Certificate of Project manager
• Appointment letter of Project Manager
•Machine:
•Mixer machine -1
•Theodolite/ level machine-1
•Water pump-1
•Vibrator -1
•All machine Vat Bill
•Insurance proof.
•Certification mentioning that all machine are in working condition
Point to Focus

• We have already summarized Danfe’s experience however need to Optimize Summary for all experiences including
all quantities and project amount.
• Update the Danfe Company profile with current year’s Turnover.
• Plan for 3 Bridges Along Madan Bhandari Road.
• Agreement Date: 5 th July 2020
• Submission of Design Detail: 4 th Dec 2020
• Project time line: 33 months ( i.e start Date: 5th June 2020 and End Date: 5 th March 2023
• Foundation 5 numbers
• Super structure 5 Numbers
• Total length 235m as per contract Data sheet.
Upgraded Mechanism

• Listing for small projects related to Building for Kathmandu Valley, ( Kathmandu, Bhaktapur, Lalitpur) and proceed further for
Bid process via O.Tech Construction. (discussion going on with Prabin dai too)
• Listing of projects from Tender sewa as well.
• Share Daily Tender listing from Bolpatra and Tender sewa .
• Briefing on all listed tenders and decide which to apply after discussing with Prabin dai and Barna dai..
• Share monthly Analysis report for Bid that we have applied.
• Share the Plan for 3 Bridges along Madan Bhandari Road.
• Share the EGP Registration detail of Otec Construction.
• Share Updated Company Profile.
• Share Updated experience summary.
Thank You
Presentation: Dillen
Suggestion:
• 95% of the listed bid can be applied.