You are on page 1of 24

JUST-IN-TIME

MANUFACTURING
A PowerPoint Presentation

BY
VARUN BABU
WHAT IS JIT?

 JIT is a manufacturing
philosophy involving an
integrated set of
procedures/activities
designed to achieve a volume
of production using minimal
inventories.
 A highly coordinated
processing system in which
goods move through the
system, and services are
performed, just as they need.
bvarun.weebly.com 02/07/202
3
2
HOW IT WORKS?

bvarun.weebly.com 02/07/202 3
3
HISTORY

 Evolved in Japan after World War II, as a


result of their diminishing market share
in the auto industry.
 Founded by Taiichi Ohno, a vice
president of Toyota.
 Basically implemented in Toyota plant
1950, well established after 1970.

bvarun.weebly.com 02/07/202 4
3
FOLLOWERS

 Adopted by General Electrical in the USA in


the 1980.
 Some companies referred JIT with different
names:
i. TOYOTA – ‘Toyota System’
ii. IBM – ‘Continuous flow manufacturing’
iii. GE- ‘Management by sight’
iv. HEWLETT- PACKARD- ‘stockless production
& repetitive manufacturing system’

bvarun.weebly.com 02/07/202 5
3
7 WASTES

1) Waste of over production


2) Waste of waiting
3) Waste of transportation
4) Waste of Underutilization
of Employees
5) Waste of Inventory
6) Waste of motion
7) Waste of making
defective products
bvarun.weebly.com 02/07/202 6
3
PRINCIPLES OF JIT
PRODUCTION

bvarun.weebly.com 02/07/202 7
3
TOTAL QUALITY MANAGEMENT

 Seek long-term

commitment

 Quality must be a

higher priority than cost

 Minimize Waste
bvarun.weebly.com 02/07/202 8
3
PRODUCTION MANAGEMENT
 Pull System vs. Push System
 Pull = Made to order
 Push = Made for inventory

 Communication Techniques
 Completion of task-Kanban
 Problem- Andon or siren/light

 Flexibility of the system

bvarun.weebly.com 02/07/202 9
3

 Design For Testability


SUPPLIER MANAGEMENT

 Establish Long Term Relationships with few


E.g. Toyota Productions
suppliers.

 Delivery of Parts = 100% Defect Free


 Where they are needed
 When they are needed
 The exact quantity

 Work Together
bvarun.weebly.com 02/07/202 10
3
INVENTORY MANAGEMENT
 Eliminate Safety Stock = Zero Inventory
 Inventory is Evil

Traditional systems use


Water = Inventory inventory (water) to buffer the
process from problems (rocks)
that cause disruption.
Poor
Material Break Material
training
handling
bvarun.weebly.com

downs
02/07/202
3 quality
11
Long
problems setups
JIT systems view inventory as waste and work to lower
inventory levels to expose and correct the problems (rocks)
that cause disruption.

Material
Material Poor Break quality Long
handling
bvarun.weebly.com
training downs
02/07/202
3 problems
12
setups
Lowering the level of inventory is relatively easy to do.
However, the problems that arise must be corrected
quickly … Otherwise, the process will flounder.

Poor
Material
training
Material
bvarun.weebly.com
Break downs quality
02/07/202
3
13
Long
handling problems setups
HUMAN RESOURCE
MANAGEMENT
 Company-wide Involvement
 Motivation for

continuous
improvement
 Problem Solving

 Diversified Employees

 Management Support and


bvarun.weebly.com 02/07/202
3
14

Empowerment of workforce
JIT MANUFACTURING BUILDING
BLOCKS

Ultimate A
Goal balanced
rapid flow

Supporting Reduce setup


Goals and lead times
Eliminate disruptions Eliminate waste
Make the system flexible Minimize inventories

Product Process Personnel Manufactur-


bvarun.weebly.com
Design Design Elements
02/07/202
3
15
ing Planning
REQUIREMENTS OF JIT

 Respond to Customer
 Use a pull Production
Requirements System
 Integrate all Processes  Design products for
 Employee Participation Manufacturing
 Company wide  Develop Controllable
Commitment to Production Processes
education  Have Defect Prevention
 Eliminate redundancy Program
 Reduce all Inventory  Reduce Setup Times
 Establish Continuous
Improvement Goals  Build Products to
bvarun.weebly.com
Specification
02/07/202 16
3
OBSTACLES IN CONVERSION

 Management not committed


 Workers not cooperative
 Decide which parts need most effort
 Start by trying to reduce setup
times
 Gradually convert operations
 Convert suppliers to JIT
 Prepare for obstacles
 Suppliers may
resist
bvarun.weebly.com 02/07/202 17
3
ADVANTAGES OF JIT

 High quality
 Flexibility
 Reduced setup times
 Reduced need for indirect labor
 Less waste
 Low warehouse cost
 Synchronization between production scheduling
and work hour
bvarun.weebly.com 02/07/202 18
3
DISADVANTAGES OF JIT

 Time consuming

 No spare product to meet un expected


order

 Supply Shock : If products do not reach on


time

bvarun.weebly.com 02/07/202 19
3
 High risk factor
JIT IN GOODS :

 Leveraged JIT principles to make its manufacturing


process a success

 Leverage their suppliers to achieve the JIT goal

 Provide exceptionally short set up times to their


customers

 Suppliers carry inventory instead of carrying it


themselves.
bvarun.weebly.com 02/07/202
3
20
 Seamless system that allows it to transmit its
component on requirements

 Willingness of suppliers to keep inventory on hand.

bvarun.weebly.com 02/07/202 21
3
JIT IN SERVICES: MAC D

McDonald’s is the best example of JIT in


bvarun.weebly.com 02/07/202 22

Services ! 3
 McDonald's doesn't begin to cook until a
customer has placed a specific order.

 The major benefits are better food at a lower


cost.

 Wastage is reduced along with an improvised


taste that makes you want to scream out I’m
bvarun.weebly.com
Lovin’ It ! 02/07/202
3
23
THANK YOU!!

bvarun.weebly.com 02/07/202 24
3

You might also like