Introduction :
 

The sixth practical period when I was in this company


was very useful, because it helps me to deal with
machines and electricity, and increase my experience at
mechanic in the future. With this practice I don’t need
to have any practice when I finish the university level, I
will be a successful engineer.

page1
About NAPCO

NAPCO established in 1991 , in the city of Nablus-


Palestine , the National Aluminum & profile company
(NAPCO), a publicly-traded share holding company that
is a subsidiary of the Arab Palestinian Investment
company (APIC). NAPCO is the first aluminum profiles
manufacturers in Palestine. Originally lunched to serve
the basic needs of Palestine’s residents. 4

page2
NAPCO has a seven production lines :
• Cast House
• Extrusion Line
• Powder Coating
• Anodizing
• Wood Effects
• Thermal break line
• Packaging & Delivery
page3
:ACTIVITIES ACHIEVED (PROGRESS)
In maintenance department:
1. Make check list to the main air compressors in the company , in this
check list , we checked the maximum and minimum pressure , the
temperature , leaking and noise.

2. Taking gas, water and electrical meters reading monthly for all
company lines, to calculate the company consumption.

Page 4
:ACTIVITIES ACHIEVED (PROGRESS)
3. Follow up external company's to maintenance some machines in
company like (forklifts, elevator and air conditions device) and take the
maintenance nots machines to registration in technical department.

4. Follow up ETCO company to maintain company generators we checked


an oil & water level, noise battery's and tested the generator's to sure it
works properly.

5. Follow up anodizing line daily and make a check list temperatures


check, any leakage in tanks, boilers, rectifier, suction, and cooling tower.

Page 5
:ACTIVITIES ACHIEVED (PROGRESS)
6. Checking the electrical equipment's in the electrical panels:
relays, photo electrical sensor, proximity sensor, push button,
selector switch limit switches , over loads , contactors, circuit
breakers, timers and sensors by the digital multi meter
(DMM).

7. If The electricity lost, I restarted the production lines in the company,


and restarted the compressors in the powder line.

Page 7
:ACTIVITIES ACHIEVED (PROGRESS)

8. Fixing the cranes in all production lines in the company, like: the extrusion
line crane, all cranes in the warehouse, the cast house crane, anodizing crane,
soda crane, dies crane and I can to change the remote control to any crane.

9. Solved an electrical problem in extrusion line crane the problem is a short


circuit is make an over current to cutoff over load protection device and stop
work crane after the check we found short circuit in up wire we fixed it and
then it works properly.

page8
:RECOMMENDATIONS

I hope in the next practical periods from the company to develop my training by

make a graduation project increase my experience in industrial field and

included in a different section .

page10
:CONCLUSION

how to deal with machines, and workers, obligation in the work , work clothes,
listening to the advices, speed in work, respect all , I learned to work in all
working conditions in hard, and comfortable work, and work in any section in
the company is help me to develop my experience, to make me successful
engineer.