Weekly Technical Report – W20 from 16/5 to 22/5/ 2022


MOSUL Region
Transmission Dep.
Weekly Active PM Auditing and SPMS status

35

PM plan 63
30

PM performed 63
25

PM audit 41
20
cleared PM 41
15
snags (minor/major)0
10
0 10 20 30 40 50 60 70

0
BB hub VIP mini-hub Normal

160
140
120 Weekly implemented MOPs (W20)
100 # Description Performed by
80
Reroute 2 sites (NE0642,NE0772) to the new link NE0822-NE0642
60 1 Korek team
40 Reroute site CW6464 to the new link CW6464-NE0819
20 2 Korek team
20
2 2
0 3
total May W20

2
Weekly Active CM Auditing and SPMS status

20
18
16
14
12
10
8
6
4
2 0 0 0 0 0
0
total sites down MW fiber ITPC issue not solved

# Site ID Root Cause Regional Action taken

3
Work order 1- Install new link between site CW6464 with site NE0819 to reroute site CW6464 due to link issue on old
link.

2- Install new link between site NE0822 with site NE0642 to reroute site NE0642 & NE0772 due to block LOS
Work order on old link.

Work order 3- Dismantled the old link between NE0493 – NE0642 ( out of service)

Transmission Dep Work order 4- Dismantled the old link between CW6464 – NE0631 (out of service)

preventive maintenance 5- Repair the fiber link between site NE0400 with site NE0802 by replace the patch cord in site NE0802

4