You are on page 1of 12

DISCIPLINE OF ELECTRICAL, ELECTRONIC &

COMPUTER ENGINEERING
UNIVERSITY OF KWAZULU–NATAL
STUDENT NAME: SIPHESIHLE NKOSI – 217012929
COURSE : ELECTRICAL DESIGN 5

CODE: ENEL4EA

INTERIM PRESENTATION
RADIO INTERFERENCE VOLTAGE MEASUREMENT SYSTEM FOR THE
MEASUREMENT OF CORONA
 
RADIO INTERFERENCE THEORY

• If not controlled, radio interference (RI) from electric power transmission line hardware
poses severe electromagnetic interference to nearby systems.
• Thus, investigating the characteristics and prediction methods for radio interference may
have a particular guiding significance.
• These discharges might not show a glow discharge depending on their position and
intensity.
• Partial discharges typically happen in gaps, cracks, or interfaces within that insulating
system or from the sharp edges of electrified apparatus elements.
PARTIAL DISCHARGES REPRESENTATION

• Due to the fact that partial discharges are related to getting old of a cable, charge
measurement of PDs is useful.
• When a cable sample has an internal defect or a surface defect, a practical scheme can
give a representation of the situation as shown in the figure:
EXPERIMENTAL TEST SETUP
EXPERIMENTAL TEST SETUP THEORY

• Firstly, the cable must be disconnected at


both ends.
• One end is then used for measurement
purposes and the other is open-circuited.
The choice is arbitrary.
• The measurement end also acts as the input
for the high voltage AC supply since, having
been disconnected from its inherent supply,
an external supply must be connected.
SIMULATED MEASUREMENT CIRCUIT AND CURRENT MEASUREMENT
SIMULATED MEASUREMENT CIRCUIT AND VOLTAGE MEASUREMENT
BANDPASS FILTER STEP RESPONSE
BAND PASS FILTER SIMULATION CIRCUIT
BAND PASS FILTER FREQUENCY RESPONSE
PROJECT PLAN

• For a project to be successful and on time, a project plan should be prepared.


• A project plan may be presented in a chart format an example of a project plan is shown:

ECONOMIC PLAN

• The economic plan comprises of: Labour costs, component costs and breakdown analysis.
• This section is used to determine how much money should be spent on the project.
• It also entails selling 100 units for a set price and calculating weather the project will
make a loss or a profit.