Improvement Activities
April 2022
Sensitivity: Public
Maintenance improvement activities
Zero Breakdown activities DONE
Improvement Plan Photo
Sensitivity: Public
Maintenance improvement activities
Preventive maintenance activities
Improvement Plan Photo
Benefits:
Increase the lifetime of the metal parts.
Offers the necessary grease protection
for the forming metal rollers.
Sensitivity: Public
Maintenance improvement activities
Sensitivity: Public
Maintenance improvement activities
Improvement Plan Photo
Before After
5. The plastic cable protection arrived with the ss
U-shell robot was unproper.
Sensitivity: Public
Automation improvement activities
Cycle time improvement for Foaming Cabinet Line FS/BI : DONE
4 SEC
Transfer time
24 sec 20 sec
BEFORE AFTER
4 SEC
Transfer time
24 sec 20 sec
Sensitivity: Public
Automation improvement activities
Cycle time improvement for Foaming Cabinet Line FS/BI : DONE
Problems addressed Actions
4 SEC
REDUCTION
40 sec 36 sec
Sensitivity: Public
Automation improvement activities
Improve cycle time – Preassembly DONE
Problems addressed
Improve cycle time Improve cycle time
Actions
Decrease transfer time from 15 sec to 10 sec Decrease transfer time from 18 sec to 15 sec
PLC Software modification! ABB Robot software modification!
Sensitivity: Public
Automation improvement activities
Decrease stoppages_Zero Chokotei – Assembly line DONE
Problems addressed
When line number 6 was full, the product that When line 11(BI) unload the products, FS out No synchronization between conveyor that
was loaded from Assy line are still blocked at conveyor to assy was blocked until line 11 load the cabinet to vacuum line and carousel.
the last conveyor because it has no direction finished complete unloading Was lost one cabinet at 2 boxes.
Actions
PLC software modification,improve cycle time When line 11 was unloading, FS product PLC software modification, synchronize the
with 3 sec. needed to wait until the line was finish speed of the motor
unloading, now has been synchronized to
transfer 1 product from line 11 and pass 1 FS
product , software modification!
Sensitivity: Public
Automation improvement activities
Decrease stoppages – Preassembly/Assembly
DONE
Problems addressed
Bad quality of the sticking evaporator on the When the local emergency stop is pressed In mix production BI and FS the equipment
inner liner from the packaging line, the last station(rotary had a lot of stoppages according with wrong
table) lost the information about the action and data sent to the PLC
kept blocked after depress the emergency
Actions
PLC software modification for keep the inner PLC software modification for continue the PLC software modification to send correct
in position in order to stick all the surface of actions automatic after depress the data and eliminate the stoppages!
the evaporator! emergency button!
Sensitivity: Public
Automation improvement activities
Cycle time Improvement – Packing line DONE
Problems addressed
One cabinet spend ~ 15 min for load/unload at the transfer to warehouse Desynchronization between load and unload of
product that create empty space between them(Final
quality check)
Actions
Sensitivity: Public
Automation improvement activities
Decrease stoppages – Packing line DONE
Problems addressed
Missing timeout warning signal final quality check Stoppages on the elevator movement
Actions
Installation of the warning light after 17 seconds, PLC hard/software PLC software modification, adjust software parameter of the servo drive
modification!
Sensitivity: Public
Automation improvement activities
Cycle time Improvement – Performance Test line In/Out DONE
Problems addressed
Improve cycle time Improve cycle time
Actions
Adjust and synchronize the conveyor speed , reduce cycle time from 18 min to 15 min Adjust conveyor speed
PLC software modification for in/out! PLC software modification!
Decrease transfer time from 70 sec to 59 sec ,
software modification!
Sensitivity: Public
Automation improvement activities
Decrease % of rejected product - Sorting Area DONE
From 100 products aprox 40 cabinet was directed to reject Decrease percent of rejected product from ~40 % to ~2 %
conveyor according with lost information about the diverting Modify the PLC software program
to sorting lines Modify the position of the sensors
38 %
~40 % ~2 %
Sensitivity: Public
Automation improvement activities
Traceability for process parameters - Foaming cabinet Side B (FS) –SCADA system: DONE
Plan Actions/Benefits
DONE
Automation of Quality and Production Controls for PU foaming parameters FS cabinets, Integration of PLC on the OPC server data collection
Generate the PLC tags on Scada System
Side B. Develop the interface
Test the interface
Put in function on the equipment area
Poured weight;
Iso and Pol temperatures (set and actual);
Iso and Pol pressures (set and actual);
Oven temperature
Fixture walls temperature
Vaccum pressure
Weight empty cabinet
Weight foamed cabinet
Avalalility of equipment
Wait infeed
Wait outfeed
Product rate
Piece rate
Sensitivity: Public
Preventive and corrective maintenance activities
DONE
Weekly meeting together with HQD team and maintenance team, in order to
establish the necessary maintenance works for the weekend period.
Sensitivity: Public
Automation Project
Sensitivity: Public