PRODUCTION
PERFORMANCE REVIEW
WEEKLY
SLIDESMANIA
PIT SEKTOR 1 Fleet PIT SEKTOR 2 PIT SEKTOR 4 Fleet PIT SEKTOR 7
EX1785 Cluster 4 EX1129
EX1157 Fleet EX2360
Cluster 2 EX1186
EX2358
EX1757
Fleet Fleet
EX1809
EX1759 EX1167
EX1144
EX1719 EX2362
EX1137 Cluster 6 EX1734
Cluster 5
Fleet
Cluster 1 SH504
EX1126 Cluster 3
EX1725
SLIDESMANIA
EX1808
EX1142
Sektor 1 PC 2000
EX1719 problem material tipis & putaran DT tidak normal • Switch PC1250 expose seam Hu & Hl melorong denan Opreng Progress
Productivity karena spotting time di front saat progress ekspose Hu & ex1137
Hl Mozak area melorong. • Penyediaaan working area & broken material di floor J &
I Mozak.
Opreng Close
Ex1785 Top loading/Double bench area extend semangat. • Observai MTO area pasiran extend semangat
• Penyiapan area blasting di pasiran ekspose K semangat.
PC 1250&PC800
Ex1157 Top loading/Double bench area extend semangat & • Observasi MTO area pasiran extend semangat
cutback low wall semangat. • Expose seam H semangat sisi utara. Opreng Progress
EX1137 top loading saat progress minor seam area HW • Expose seam Hu/Hl mozak menggantikan ex1719
mozak RL10 dan ekspose HU/HL mozak. Opreng Close
Ex1167 di S7 problem material non blasting saat progress • Pengawasan GL area untuk pekerjaan develop buka
loading bukit Utara area develop untuk buka subcrop seam subcrop seam G. Opreng Progress
G.
Problem PA unit Ex1785 actual 80% under dari plan 89%, • Follow up ke dept Plant terkait problem PA
Cont PS500 & Low power Error PLANT Closed
Jam Hujan over dari plan, Akt MTD 29.6, dari plan 15.1,
PA %RS actual 23% over dari plan 11%.
Idle
SLIDESMANIA
• EX1144 problem top loading trace coal seam G/F Teweh • Prioritas pengerjaan ke arah crop line coal seam G/F Opreng W3 Aug
Teweh sehingga loader dapat area swing cukup lebar
terhadap HD785 serta penyediaan area kerja Palangka
• EX1186 problem material tipis expose Seam K dan I vcut Raya
Sereak • Support dozer saat loading material tipis ekspose untuk Opr Closed
optimalisasi jenjang loader, serta penyediaan broken
material stripping G Pujon & Stripping M Sereak
• EX1126 problem top loading untuk trace coal Seam H area • Progres area trace coal Seam H Rinjani dengan
Rinjani pembentukan dudukan loader saat loading dan support Opreng W1 Aug
dozer
• EX1142 problem loading material non blasting dan • Support dozer saat loading material tipis ekspose untuk
material tipis saat eksp seam L dan K Rinjani optimalisasi jenjang loader, serta penyediaan broken Opreng W1 Aug
material ekspose Seam L Rinjani
PC 3000
• SH504 problem putaran DT tidak normal karena spotting • Pergeseran arah loading ke sisi selatan agar dapat
time di front loading saat progres crest +40 area sempit dilakukan double side loading serta penurunan area selatan Opreng 7 Aug
to RL +30
PC2000
• EX1809 problem double bench loading progres extend Pit
Batapah crest +50 yearly dan top loading progres area • Pengamatan MTO pada saat PC2000 double bench loading
Manarang dengan Tim OTD serta penyediaan working geometry Eng dan Continue
• EX1757 problem material tipis ekspose Seam H Batapah – Manarang – Palangka raya OTD
Pujon dan problem kondisi fisik jalan overgrade pada • Support dozer pada saat ekspose untuk optimalisasi
segmen front ke Jl. Malinau jenjang loader serta pembentukan jalan low wall Pujon Opreng W2 Aug
• EX1725 problem drainase pada area Rinjani atas grade 6%
• Evaluasi inner drainage area highwall Rinjani serta
pembentukan paritan sisi highwall Rinjani ke arah Opreng W2 Aug
Lamandau
SLIDESMANIA
PC1250
• EX1129 problem material non blasting dan double bench • Pemenuhan broken inventory Sektor 4 untuk ekspose/ Eng W1 Aug
loading saat extend pit ke sisi selatan – barat stripping seam stripping Seam G dan H sisi selatan - timur
H
SLIDESMANIA
Prog_220716_s1 vs Pit_2207_s1
Idle Jam Hujan over dari plan, Akt MTD 29.6, dari plan 15.1, %RS actual 23% over Menjaga rasio R/S as plan Opr Cont
dari plan 11%.
SLIDESMANIA
Prog_220727vs
Prog_220703_s2 vsPit_2207_s2
Pit 2207_s2
COAL MINING REVIEW & PICA
Issue Problem / Reason Corrective Action PIC DD
Review Sequence • Coal Seam G dan H Jati belum dapat getting karena masih tergenang, plan • Meminimalisir catchment area Sump Jati dari Disposal Opreng W1 Aug
coal seam G 7.7rb ton actual 1.6k ton, coal seam H Jati plan 6.4rb ton actual Bontang ke arah luar pit, serta optimalisasi debit 1 x pompa
2.6k ton terambil. sump Jati ke arah Sump Buhut
• Coal Seam H area Batapah sebagian belum terekspose, dari plan 18k ton, • Continue coal ekspose Seam H area Batapah sisi vcut, plan Opreng W1 Aug
actual getting 6.5k ton. Undercut pada area tersebut karena delay hujan dan pembentukan ramp turun pada layer kedua stripping H ke
prdty loader OB (refer to Pica OB). Aktual 1 x PC2000 progres area tersebut arah low wall Pujon agar dapat diprogres dari dua sisi
pada Week 31 • Join pit geos PAMA – ABB terkait area optimasi seam G
• Coal Seam G area optimasi Teweh di-plan-kan 6.5k ton, actual seam G tidak Teweh Eng Closed
menerus ke sisi utara • Pembentukan ramp jalan pada floor I Puruk Cahu ke arah
SLIDESMANIA
• Coal Seam K area Sereak undercut karena area sempit dan masih tertahan low wall Pujon sehingga area Sereak dapat di-cut ekspose Opreng 10 Aug
menjadi jalan HD785 progres ekspose Seam I Puruk Cahu Seam K secara parallel dengan penurunan floor I Puruk
Cahu
Idle
og_220426 vs Pit 2205_s2_r0 • R/S over dari plan, plan R/S 19.1, actual R/S 39.1 hrs • Menjaga rasio slippery <30% Opr Continue