INTRODUCTION
 Oil Companies International Marine Forum (OCIMF) are developing
Offshore Vessel Management Self Assessment (OVMSA) for offshore
vessel operators – expected to be launched by January 2011
• The Geophysical Contractor Management and Self Assessment is
based on principles and guidelines of OCIMF’s Tanker Vessel
Management and Self Assessment (TVMSA). TVMSA been a
successful tool for vessel operators in marine transportation.
• Industry standards provide the foundation for SHE&S management
systems – GCMSA is intended to supplement these standards

2
OBJECTIVES OF GCMSA

Objectives of self assessment process:


• Promotes continuous improvement
• Provides a structured and staged approach
• Provides expectations and guidance on how to meet
expectations
• Industry standards lay foundation for HSE&S Management
Systems – GCMSA looks to build on this
• Provides guidance on how to set targets
• As business processes change, GCMSA will evolve

3
CONTINOUS IMPROVEMENT
An office based management culture of continuous improvement
with regard to safety, quality and environmental protection is
reflected in the execution of field activities.

4
CONTINOUS IMPROVEMENT
The key benefits for organizations implementing a continuous
improvement program include:

• Builds management team consensus about what the priority


organizational objectives are, and how to focus the organization on
these objectives.

• The process of systematically analyzing an organization is proven to


deliver tangible results.

• Builds awareness of the gap between the current strategy and where
the organization wants to go, and how to develop a plan to bridge that
gap.

5
CONTINOUS IMPROVEMENT
• Builds team awareness on the need for designing management
practices to ensure management are aligned towards achieving
their goals and more importantly how to implement them.

• Exposes management and staff to best practices.

• Builds trust between the company and business associates.

• Achieves consistently client, people, system and financial


benefits.

• Tool to enhance sub-contractor performance.

6
GCMSA AND INSPECTION FLOW
Seismic Operations

Land Marine

• To work with the


Contractors that own Contractors that lease/charter
Industry to develop a
and operate seismic vessels
tool similar to GCMSA
vessels  To work with Industry to
 From 1Q 2011 – will develop a tool similar to
be covered by OVMSA GCMSA

Vessel Operator
 From 1Q 2011 – will be
covered by OVMSA

Seismic, Support and Chase


Vessels
 Presently audited using
OVIQ, transitioning from IMCA
CIMD to OCIMF’s OVIQ
7
GCMSA – ELEMENTS
• Element 1 - Management, leadership and accountability
• Element 2 - Recruitment and management of shore-based personnel
• Element 3 - Recruitment and management of vessel personnel
• Element 4 - Reliability and maintenance standards
• Element 5 - Navigational safety
• Element 6 - Geophysical, Ballast, Mooring and Rigging operations
• Element 7 - Management of change
• Element 8 - Incident investigation and analysis
• Element 9 - Safety management
• Element 10 - Environmental management
• Element 11 - Emergency preparedness and contingency planning
• Element 12 - Measurement, analysis and improvement
• Element 13 - Selection and monitoring of sub contractors
8
ABOUT THE GUIDELINES
• Each Element indicates a fundamental area of management practice.
• The main objective defines goal to be achieved.
• Supporting paragraphs within the Elements explain the objectives can
be achieved.
• Each Element defines KPIs required to meet the objective.
• Individual KPIs within the Elements provide measurement of the
standards currently achieved.
• Activities in each Element is grouped into four stages.
• Higher stages build from lower stages.
• There is no expectation that compliance is a must for all stages.
• As each stage is achieved, each company would then establish a
continuous improvement plan to achieve the next stage.
9
PROCESS
• Seismic contractor completes GCMSA
– Requires realistic self assessment of current status.
– Consider fixing low hanging fruit
– Prioritise improvements
– Update the continuous improvement plan

• Submit GCMSA to client upon request


– Client reviews submission
– Validates submission by visiting the office of seismic contractor
and/or sub-contractor

• Reports after office reviews will not be shared with other potential
clients.

10
NEXT STEPS

• Vessel operators will be covered by OCIMF’s OVMSA –


January 2011.

• Vessels covered by OCIMF’s inspection format.

• Handover the GCMSA to OGP/IAGC HSSE Sub-Committee


and have a Work Group modify GCMSA to suit land seismic
contractors and marine seismic contractors who do not
operate vessels.

11
OVMSA / GCMSA
OVMSA AND GCMSA ARE NOT STATEMENTS OF COMPLIANCE

THEY ARE INTENDED TO ESTABLISH A CONTINUOUS


IMPROVEMENT PROCESS TO DRIVE POSITIVE CHANGE

High

Stage 4

Stage 3
Quality
Operations

Stage 2

Stage 1
Low
Industry Standards
12
CLOSING THOUGHT……

“When it comes to achieving excellence, figuring out


the right things to do isn’t nearly as difficult as
continuing to do them over the long term”

Gary Harpst