The document outlines the requirements and process for Pollution Control Officer (PCO) accreditation in the DENR-EMB Region 4A Office, including minimum competency requirements, required training, application preparation and submission steps, and fees. Applicants must be designated by their company, attend prescribed training, prepare and submit their application through the Clearance and Permitting Division, and renew their Certificate of Accreditation every three years.
The document outlines the requirements and process for Pollution Control Officer (PCO) accreditation in the DENR-EMB Region 4A Office, including minimum competency requirements, required training, application preparation and submission steps, and fees. Applicants must be designated by their company, attend prescribed training, prepare and submit their application through the Clearance and Permitting Division, and renew their Certificate of Accreditation every three years.
The document outlines the requirements and process for Pollution Control Officer (PCO) accreditation in the DENR-EMB Region 4A Office, including minimum competency requirements, required training, application preparation and submission steps, and fees. Applicants must be designated by their company, attend prescribed training, prepare and submit their application through the Clearance and Permitting Division, and renew their Certificate of Accreditation every three years.
1. Appointment / Designation of PCO based DENR-EMB Region 4A Office http://calabarzon.emb.gov.ph/
on minimum competency (for complete directory and list 2. Attendance to prescribed PCO Training Dir. NOEMI A. PARANADA of requirements) including Managing Head training Regional Director, EMB R4A 3. Preparation of Application Requirements pcor4a@emb.gov.ph 4. Submission of pco application through Clearance and Permitting Division (for submission of application) email (CPD) 5. Pay P500 per application at EMB R4A Office upon pick up of the Certificate of Accreditation (COA) 6. Renewal of COA every three (3) years
Scan QR Code to visit
EMB R4A website Environmental Impact Statement System (PEISS) Reference: PD 1586 and DENR AO 2003-30
APPLICANT CONCERNED OFFICE LINK / EMAIL / GUIDE
1. Secure Environmental Compliance
Certificate (ECC) for Project Category A/B EMB Central (for EIS) http://calabarzon.emb.gov.ph/ or Certificate of Non-coverage (CNC) for DENR-EMB Region 4A Office (for complete directory and list Project category D of requirements) 2. Secure PAMB Clearance for Project located Dir. NOEMI A. PARANADA in ECA Regional Director, EMB R4A https://ecconline.emb.gov.ph/liv e/Default.aspx 3. Submit application online (new IEE Checklist) or email (old/existing/expansion Clearance and Permitting Division (CPD) (for ECC online) project) 4. Submit complete requirements (Proof of cpd_calabarzon@emb.gov.ph land ownership, Zoning compliance, (for ECC amendment/existing Building/Project Layout, Prescribed Scan QR Code to visit project) environmental Report, Etc) EMB R4A website LIST OF TRANSPORTED / TDS WITH VALID REGISTRATION