You are on page 1of 7

PROJECT CARGO

Step produce on the project.


OPERATION PROCESS

• Value step progress on the positioning.


• Ensure equal identities to prove from assumption of work completion.
• Example work of time on the sketch plan project without procedure and skip
position.
• Unaccording procedure or skip step work cutted cist of quality work and affect
to the all project from minimum position.
• Matching gift to protect are silent during emergency Does not Equal to the
surrounding.
• Communication leak are distraction to hold the quality.
MINOR FACTOR

• Minimum interact in between project of the employee and person incharge to


handle the cargo shipment.
• Step taken to produce a quality and need of process work.
• Create a procedure work to produce the elimination for minimise error during
handling the PPE.
• Memorize the important work to proceed for every step with effective and
efficient value when lifting the cargo for transportation.
• Alias to the other employee to cooperate efficiently for a completion work
infact to the changing system that cause to proper solution.
ADJUSTMENT & ESTIMATION

Roughly control the capitals, modal to create the project matter.


Minimise prejunktion cost when proceed to transport of cargo matter.
Determination on interruption to give a help to the working time.
Target to complete the work on relevant of time,day and month or even a fine day.
ADVANZ PRO & CON

• Barricade the collection usable stowage for • Ignore the negative work cargo when problem
unsafe defect co-operation. occur.

• Perfectly create a strong work of flow with • Lifting cargo equal to the procedure to achieve
flash of photo as a growth in the product the procedure in recent time.
life cycle. • No capitalism to start-up the project.
• Dramatic to occur the current work. • Only complete without quality of contract
project that will cause the work stranded and
• Desire potential to create the strategy start left over.
up project.
Just attend to work as a worker without having
• Communication effectively with recent any intention to exist the base of work that will
work to complete the cargo shipment. not last long.
PASSING THE PARCEL

CARGO CONTAINERIZATION
• Work duties as a employee to get the • Reliable product of measurement tools to lift the container
with different size to proceed thus minimum the cost of
function of working place to extend work and energy of the employee.
more time. • Command on the procedure work in the in the middle of
operation.
• Faded attachment can be referr to the
• Shortcut will lead to uneffective Project that will not last
manager as a strong work flows. long.

• • Value operation work versus cut cost time of work,


Doubt can be confidential confirm with
manager to assist the effective system. • Position work effectively to compare the faded work.
• Value of tools are not met with the payment to consider the
insertion of cashback according to the statement.
MAINTAINABLE POSITION

You might also like