0% found this document useful (0 votes)
368 views31 pages

Domestic Water Pumping System For High Rise Building

The document discusses the design of a domestic water pumping system for a high-rise building. It covers topics such as preventing water hammering, the advantages of using inverter drives, water level controls for tanks, and compares the costs of different system designs with varying tank capacities and pumping times.

Uploaded by

Sim Khoon Aun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
368 views31 pages

Domestic Water Pumping System For High Rise Building

The document discusses the design of a domestic water pumping system for a high-rise building. It covers topics such as preventing water hammering, the advantages of using inverter drives, water level controls for tanks, and compares the costs of different system designs with varying tank capacities and pumping times.

Uploaded by

Sim Khoon Aun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd

DESIGN FOR DOMESTIC WATER PUMPING

SYSTEM OF HIGH RISE BUILDING

PLEASE DO NOT HESITATE TO CONTACT ME FOR ANY QUESTIONS.


PREVENT THE WATER HAMMERING WHEN
THE PUMP STOP
1) Install the Silent Check Valve at the riser pipe
to prevent water back flow.
2) Install Surge Anticipating Valve at the riser
pipe to release the back pressure of the
water back flow into suction tank or drain.
3) Using Inverter Drive Control Panel by setting
Decelerate Time of the inverter to reduce
90% of the water back flow and water
hammering.
Silent Check Valve Surge Anticipating
Valve
ADVANTAGES OF USING INVERTER
DRIVE FOR PUMPING SYSTEM
1) Lower Starting Amp and Lower Incoming
Amp Supply = Smaller Cable Size
STARTING AMP INCOMING AMP SUPPLY
BELOW 100A = FULL LOAD AMP X 2 TIMES BELOW 150A = FULL LOAD AMP + 50%
100A – 200A = FULL LOAD AMP X 2.5 TIMES ABOVE 150A = FULL LOAD AMP + 80%
200A – 500A = FULL LOAD AMP X 3 TIMES
By Using Inverter

Soft Start = Prevent Vibration of the Pump & Pipe


Soft Stop = Prevent Water Hammering & Noise created
By Inverter

By Inverter
Volt meter
Amp meter
Voltage
Ampere selector
selector switch
switch
INVERTER

MCCB

MCB + ELCB FOR CONTROL MCB PUMP 1/2

MAIN ELCB
CONTROL RELAY

FLOATLESS RELAY DC POWER SUPPLY

PLC
ADVANTAGES OF USING INVERTER DRIVE
FOR PUMPING SYSTEM
2) Varying pump speed for varying loads
= Energy Saving
WATER LEVEL CONTROL FOR SUCTION TANK
SENSOR ROD BALL FLOAT VALVE

PUMP START AT 50% OF TANK LEVEL

PUMP STOP AT 20% OF TANK LEVEL

ROD FOR COMMON

SUCTION TANK SENSOR ROD INSTALL FOR PUMP SYSTEM DRY RUN PROTECTION
WATER LEVEL CONTROL FOR ROOF TOP STORAGE TANK

PUMP STOP AT 90%


OF THE TANK LEVEL

PUMP 1 START AT 70%


OF THE TANK LEVEL

PUMP 2 START AT 50%


OF THE TANK LEVEL

LOW WATER LEVEL ALARM


AT 20% OF THE TANK LEVEL

COMMON ROD AT 10% OF THE TANK LEVEL


TANK HEIGHT = 1.22M X 3 TIER = 3.66M
PUMP PLINTH HEIGHT = 1M
TOTAL = 4.66M

(3.5M X 3) + 4.66M = 15.16M


(3.5M X 4) + 4.66M = 18.66M
(3.5M X 5) + 4.66M = 22.16M
NONE DISCLOSE AGREEMENT
(NDA)
Seek for your help for don’t disclose
my briefing to my competitor.
Experience = Cost Saving
3 THINGS THAT CAN EFFECT THE COST FOR
HIGH RISE BUILDING PUMPING SYSTEM
1) Single Stage Pumping System
2) Define The Roof Top Tank Capacity
3) Define The Pumping Time To Fill Up The
Roof Top Tank
1) Single Stage Pumping System

From SPAN Page 60, Year 2014

From SPAN Page 60, Year 2018

BENIFITS OF SINGLE STAGE PUMPING


COST SAVING BECAUSE DON’T HAVE THE INTERMEDIATE TANK & REDUCE THE
BUILDING LOAD
SPACE SAVING FOR THE INTERMEDIATE PUMP ROOM AND CAN USE FOR OTHER’S
USAGE
DON’T HAVE THE NOISE INTERUPTION FOR THE SAME FLOOR UNITS AND FLOOR
BELOW THE PUMP ROOM.
2) Define The Roof Top Tank Capacity

From SPAN Page 60, Year 2018

3 OPTIONS FOR SUCTION TANK & ROOF TOP TANK CAPACITY


OPTION 1 = SUCTION TANK 10% - 15% & ROOF TOP TANK = 100% (PBA STANDARD)
OPTION 2 = SUCTION TANK 30% & ROOF TOP TANK = 70%
OPTION 3 = SUCTION TANK 70% & ROOF TOP TANK = 30%
IF REALLY WANT TO HAVE THE BUILDING LOAD SAVING, CAN CONSIDER FOR
OPTION 2. BUT PBA OPERATION DEPARTMENT MAY COMMENT FOR IT FOR
OPTION 3.
3) Define The Pumping Time To Fill Up The
Roof Top Tank

From SPAN Page 60, Year 2018


3 OPTIONS OF PUMPING TIME TO FILL UP THE ROOF TOP TANK
OPTION 1 = 6 HOURS TO FILL UP ROOF TOP TANK (PBA STANDARD)
OPTION 2 = 8 HOURS + 15% TO FILL UP ROOF TOP TANK (SADA STANDARD)
OPTION 3 = 8 - 12 HOURS TO FILL UP ROOF TOP TANK (KL & SELANGOR STANDARD)
WE CHOOSE FOR 12 HOURS FOR 1 PUMP TO FILL UP ROOF TOP TANK
1 PUMP RUNNING = 12 HOURS & 2 PUMPS RUNNING = 6 HOURS
WATER LEVEL CONTROL FOR ROOF TOP STORAGE TANK

PUMP STOP AT 90%


OF THE TANK LEVEL

PUMP 1 START AT 70% 12 HOURS PUMPING


OF THE TANK LEVEL FOR 1 PUMP RUNNING

PUMP 2 START AT 50% BECOME 6 HOURS PUMPING


OF THE TANK LEVEL WHEN 2 PUMPS RUNNING

EARLIER DESIGN IS 1 PUMP


RUNNING AT 50% OF TANK
LEVEL FOR 6 HOURS PUMPING
LOW WATER LEVEL ALARM
AT 20% OF THE TANK LEVEL

COMMON ROD AT 10% OF THE TANK LEVEL


PRICE COMPARISON FOR 1 DUTY = 6 HOURS &
1 DUTY = 12 HOURS, 2 DUTY = 6 HOURS
EXAMPLE CASE STUDY 1 = 15 STOREY APARTMENT WITH 391 UNITS HOUSES
ROOF TOP TANK CAPACITY = 645M3/HR ÷ 6 HOURS = 107.5M3/HR
ROOF TOP TANK CAPACITY = 645M3/HR ÷ 12 HOURS = 53.75M3/HR
PUMPING HEAD REQUIRED = 70M
OPTION 1 = 107.5M3/HR@70M (1 DUTY = 6 HOURS)
OPTION 2 = 53.7M3/HR@70M (1 DUTY = 12 HOURS, 2 DUTY = 6 HOURS)
1 DUTY = 6 HOURS 1 DUTY = 12 HOURS, 2 DUTY = 6 HOURS
GROUND FLOOR BOOSTER PUMP GROUND FLOOR BOOSTER PUMP
MODEL : VMS 85-40S C/W 30KW MODEL : VMS 42-40S C/W 15KW
PRICE : RM13,800 X 2 UNIT = RM27,600 PRICE : RM9,150 X 2 UNIT = RM18,300
PUMP PRICE DIFFERENT = RM9,300
2 X 30KW AUTO TRANSFOMER CONTROL 2 X 15KW STAR - DELTA CONTROL PANEL =
PANEL = RM10,800 RM7,850
2 X 30KW INVERTER TYPE CONTROL 2 X 15KW INVERTER TYPE CONTROL PANEL
PANEL = RM41,300 = RM23,200
CONTROL PANEL DIFFERENT = RM2,950
(STAR-DELTA) / RM18,100 (INVERTER)

SAVE 32%
SAVE 40%
TOTAL PRICE DIFFERENT = RM 12,250 (STAR-DELTA) / RM27,400 (INVERTER)
PRICE COMPARISON FOR 2 DUTY = 6 HOURS &
2 DUTY = 12 HOURS, 4 DUTY = 6 HOURS
EXAMPLE CASE STUDY 2 = 35 STOREY CONDOMINIUM WITH 496 UNITS HOUSES
ROOF TOP TANK CAPACITY = 995M3/HR ÷ 6 HOURS = 166M3/HR
ROOF TOP TANK CAPACITY = 995M3/HR ÷ 12 HOURS = 83M3/HR
PUMPING HEAD REQUIRED = 133M
OPTION 1 = 166M3/HR@133M (2 DUTY = 6 HOURS)
OPTION 2 = 96M3/HR@133M (2 DUTY = 10.4 HOURS, 4 DUTY = 5.2 HOURS)
2 DUTY = 6 HOURS 2 DUTY = 12 HOURS, 4 DUTY = 6 HOURS
GROUND FLOOR BOOSTER PUMP GROUND FLOOR BOOSTER PUMP
MODEL : EVO-V 9006 C/W 45KW MODEL : EVO-V 4507 C/W 30KW
PRICE : RM33,000 X 4 UNIT = RM132,000 PRICE : RM25,300 X 4 UNIT = RM101,200
PUMP PRICE DIFFERENT = RM30,800

4 X 45KW INVERTER TYPE CONTROL 4 X 30KW INVERTER TYPE CONTROL PANEL


PANEL = RM112,000 = RM82,500
CONTROL PANEL DIFFERENT = RM29,500

TOTAL PRICE DIFFERENT = RM 60,300 (SAVING 24.7%)


PRICE COMPARISON FOR 2 DUTY = 6 HOURS &
2 DUTY = 12.5 HOURS, 4 DUTY = 6.5 HOURS
EXAMPLE CASE STUDY 3 = 35 STOREY CONDOMINIUM WITH 496 UNITS HOUSES
ROOF TOP TANK CAPACITY = 995M3/HR ÷ 6 HOURS = 166M3/HR
ROOF TOP TANK CAPACITY = 995M3/HR ÷ 12 HOURS = 83M3/HR
PUMPING HEAD REQUIRED = 133M
OPTION 1 = 166M3/HR@133M (2 DUTY = 6 HOURS)
OPTION 2 = 76M3/HR@133M (2 DUTY = 12.5 HOURS, 4 DUTY = 6.5 HOURS)
2 DUTY = 6 HOURS 2 DUTY = 12.5 HOURS, 4 DUTY = 6.5 HOURS
GROUND FLOOR BOOSTER PUMP GROUND FLOOR BOOSTER PUMP
MODEL : EVO-V 9006 C/W 45KW MODEL : EVO-V 4506 C/W 22KW
PRICE : RM33,000 X 4 UNIT = RM132,000 PRICE : RM22,000 X 4 UNIT = RM88,000
PUMP PRICE DIFFERENT = RM44,000

4 X 45KW INVERTER TYPE CONTROL 4 X 22KW INVERTER TYPE CONTROL PANEL =


PANEL = RM112,000 RM62,000
CONTROL PANEL DIFFERENT = RM50,000

TOTAL PRICE DIFFERENT = RM 94,000 (SAVING 38.5%)


PRICE COMPARISON FOR 2 DUTY = 6 HOURS &
1 DUTY = 16 HOURS, 2 DUTY = 8 HOURS
EXAMPLE CASE STUDY 4 = 35 STOREY CONDOMINIUM WITH 496 UNITS HOUSES
ROOF TOP TANK CAPACITY = 995M3/HR ÷ 6 HOURS = 166M3/HR
ROOF TOP TANK CAPACITY = 995M3/HR ÷ 16 HOURS = 62M3/HR
PUMPING HEAD REQUIRED = 133M
OPTION 1 = 166M3/HR@133M (2 DUTY = 6 HOURS)
OPTION 2 = 67M3/HR@133M (1 DUTY = 15 HOURS, 2 DUTY = 7.5 HOURS)
2 DUTY = 6 HOURS 1 DUTY = 16 HOURS, 1 DUTY = 8 HOURS
GROUND FLOOR BOOSTER PUMP GROUND FLOOR BOOSTER PUMP
MODEL : EVO-V 9006 C/W 45KW MODEL : EVO-V 6406 C/W 37KW
PRICE : RM33,000 X 4 UNIT = RM132,000 PRICE : RM27,500 X 2 UNIT = RM55,000
PUMP PRICE DIFFERENT = RM77,000

4 X 45KW INVERTER TYPE CONTROL 2 X 37KW INVERTER TYPE CONTROL PANEL =


PANEL = RM112,000 RM47,000
CONTROL PANEL DIFFERENT = RM65,000

TOTAL PRICE DIFFERENT = RM 142,000 (SAVING 58.2%)


EXAMPLE CASE STUDY 5 = 12 STOREY APARTMENT WITH 113 UNITS HOUSES
ROOF TOP TANK CAPACITY = 244.8M3/HR ÷ 6 HOURS = 40.8M3/HR
ROOF TOP TANK CAPACITY = 244.8M3/HR ÷ 12 HOURS = 20.4M3/HR
PUMPING HEAD REQUIRED = 57M
OPTION 1 = 40.8M3/HR@57M (1 DUTY = 6 HOURS)
OPTION 2 = 20.4M3/HR@57M (1 DUTY = 12 HOURS, 2 DUTY = 6 HOURS)
1 DUTY = 6 HOURS 1 DUTY = 12 HOURS, 2 DUTY = 6 HOURS
WILO GROUND FLOOR BOOSTER PUMP WILO GROUND FLOOR BOOSTER PUMP
MODEL : EVO-V 4503 C/W 11KW MODEL : EVO-V 2005 C/W 5.5KW
PRICE : RM11,300 X 2 UNIT = RM22,600 PRICE : RM7,300 X 2 UNIT = RM14,600
PUMP PRICE DIFFERENT = RM8,000 (35.4%)

SHINDO GROUND FLOOR BOOSTER PUMP SHINDO GROUND FLOOR BOOSTER PUMP
MODEL : VMS 42-30S(G) C/W 11KW MODEL : VMS 20-50S(G) C/W 5.5KW
PRICE : RM8,000 X 2 UNIT = RM16,000 PRICE : RM5,500 X 2 UNIT = RM11,000
PUMP PRICE DIFFERENT = RM5,000 (31.2%)

PRICE DIFFERENT FOR WILO PUMP & PRICE DIFFERENT FOR WILO PUMP &
SHINDO PUMP = RM6,600 (29%) SHINDO PUMP = RM3,600 (24.6%)
2 X 11KW STAR-DELTA TYPE CONTROL 2 X 5.5KW STAR-DELTA TYPE CONTROL
PANEL = RM5,800 PANEL = RM5,000
CONTROL PANEL DIFFERENT = RM800
TOTAL PRICE FOR WILO & CONTROL PANEL TOTAL PRICE FOR WILO & CONTROL PANEL
= RM28,400 = RM19,600 (DIFFERENT RM8,800) (31%)
1 DUTY = 6 HOURS 1 DUTY = 12 HOURS, 2 DUTY = 6 HOURS
TOTAL PRICE FOR SHINDO & CONTROL TOTAL PRICE FOR SHINDO & CONTROL
PANEL = RM21,800 PANEL
= RM16,000 (DIFFERENT RM5,800) (26.6%)
2 Points To Define The Pumping Time To
Fill Up The Roof Top Tank

3 OPTIONS OF PUMPING TIME TO FILL UP THE ROOF TOP TANK


OPTION 1 = 6 HOURS TO FILL UP ROOF TOP TANK (PBA STANDARD)
OPTION 2 = 8 HOURS + 15% TO FILL UP ROOF TOP TANK (SADA STANDARD)
OPTION 3 = 8 - 12 HOURS TO FILL UP ROOF TOP TANK (KL & SELANGOR STANDARD)

1) From the above Guidelines, even though we select for 12 hours


filling time. But we still have backup pump at lower level to increase
to 6 hours filling time if the water continue to drop to hit 50% water
level of the tank.
2) Most of the apartment/condominium are not fully occupied.
COMMITMENT FOR THE PUMPING
DESIGIN PROPOSED
• We will fully responsible for the pumping system
that we had proposed. We are willing to sign the
agreement to assure for future 10 – 20 years later,
when the building is fully occupied and my pump
system is able to support for the usage demand.
Otherwise, we will upgrade the pump size FOC to
the developer. Excluded others external factors
that cause the pumping system can’t perform
normally. Like low PBA incoming water supply and
electric supply issue.