MINING PLAN EOM MEI

2023
IGKM – TOMA
Plan Drill 23 Mei – 4 Juni
(1).1102=90 Hole Plan Drill 23 Mei – 4 Juni

(6). 2195=179 Hole


(2).584=47 Hole

(7). 556=45 Hole

(3).1271=103 Hole

(8). 365=29 Hole

(4).556 = 45 Hole (1). 1102=90 Hole

(5). 925=75 Hole

(4). =103 Hole

Total Hole = 613


BB B”
B”

A A A”

Cross Section North – South


Cross Section West - East
Situasi 19 Mei Plan EOM Mei

RL 130

125

RL 118
118

110 RL 110