CONTENT OF PRESENTATION
2
Instrumentation and Automation
Need for SCADA system
Second level shall consist of PLC hardware-based control system. This system will be programmed to execute
functions like generating data from plant parameters. It will also cater local PLC Panels also like Chlorination plant,
Dosing system, RIO Panels of Filter Beds, Pump House etc. The data from first level system will be acquired by this
system
Third level will communication, where communication will be stablished to next level of system i. e. In WTW Ring
network of FO/ Ethernet will be preferred. For Remote sites Ethernet/Modbus based Radio communication will be
adopted. For Locations to central monitoring Station Radio communication or GPRS (based on feasibility) based
reliable communication media based on telemetry system, may be adopted.
Forth level will be web based SCADA system at Zone2 & Zone 3 with analytics for customizes reporting at new
WTW, which will have redundant Server, 2 OS, 3 WS & 1 ES , Video wall 4x2 ,UPS. And this data will be transferred
to Central Servers at Maseru. 3000 Tags will also be provisioned for Metolong WTW, & 3 nos other sites under
WASCO.
Intake
Rising Main
WTW
Z2PS1 Z2PS2
Rising Main
Rising Main
Z2R1 Z2R2
Outlet of Reservoirs
INSTRUMENTATION & AUTOMATION
INSTRUMENTATION & AUTOMATION
8
Scope of Works at Intake & Raising Main
Measurement & Control of Motors, Electrical Actuated Smart Valves, Flow Switches, Water Quality, Level,
Pressure & (Inlet & Outlet) Flow at Intake, Hlotse of raw water flow quantity at Aeration fountain
Access Control & CCTV
PLC Panel with Radio Communication (GPRS) to CCRs, with Local/Remote facility.
Earthing
To provide continuous real time data monitoring, recording and control from control
room of all Raw Water & Pure water pumping stations.
To create & display mathematical model for water Balance flow and efficiency
computation for individual pump at each pumping station along with kWh/ ML
Benchmark for each pumping station.
Monitoring of WTP parameters of flow, pressure, level, water pH, water turbidity,
residual chlorine etc. at each WTP location.
INSTRUMENTATION & AUTOMATION
12
Monitoring and control of parameters of flow, pressure, sump level and energy parameters like
kWh consumption, voltage, current, power factor etc. at each Water Treatment Plant & Pump
location.
To provide alerts, in case of emergency, to the appropriate authorities to quickly initiate actions
for disaster management.
Sending alarm SMS messages from central server at Maseru, Zone 2 & 3 to WASCO engineers
to connect them with the system on 24x7 basis.
Storage of process data and generation of log reports, water & power audit reports.
Type of
S. Nr. Service No. Instrument Function
Instrument
V. Automation
• Redundant Servers
• Mobile Application- How Many
• Remote Server – 2 Nos
• Web Based Server asked.
INSTRUMENTATION & AUTOMATION CONTD… 19
A. Specifications, FDS & Commissioning Sheets to be prepared
1. Flow meters (EMF)
2. Radar/Ultrasonic Level
3. Pressure Transmitter
4. Smart Actuators
5. Altitude Valves at outlet of reservoirs.
6. Temperature ( 250Kw & Above motors)
7. Vibration ( 250Kw & Above motors)
8. Chlorine Analysers
9. Turbidity Analyzer
10. PH Analyzer
11. Fe Analyzer
12. Micro PLC/RTU
13. PLC for WTW & PS
14. Redundant Server
15. SCADA
16. UPS
17. 2 OS, 3 WS, 1 ES & 8 Screen Video Wall (Size not mentioned)
18. RTU Panel for Radio Communication
19. Make List
INSTRUMENTATION & AUTOMATION CONTD… 20