You are on page 1of 18

PT.

EQUIPMENT
Hauling Project RELIABILITY
Sumatra Based MANAGEMENT
CONTENT

• Mobilisasi unit
• Komisioning
• Workshop
• Plan Produksi
• Operational

Progress Meeting
Topic one
MOBILISASI UNIT
Delivery Unit ke Site
Delivery #1

No Merk Lokasi Awal Lokasi Tujuan Tanggal Tiba

1 HINO Hino Jakarta Workshop Setia - Jetty SBL 16-Nov-22

2 HINO Hino Jakarta Workshop Setia - Jetty SBL 16-Nov-22

3 HINO Hino Jakarta Workshop Setia - Jetty SBL 16-Nov-22

4 HINO Hino Jakarta Workshop Setia - Jetty SBL 16-Nov-22

5 HINO Hino Jakarta Workshop Setia - Jetty SBL 16-Nov-22


Delivery #2

No Merk Lokasi Awal Lokasi Tujuan Tanggal Tiba

1 HINO Hino Jakarta Workshop Setia - Jetty SBL 18-Nov-22

2 HINO Hino Jakarta Workshop Setia - Jetty SBL 18-Nov-22

3 HINO Hino Jakarta Workshop Setia - Jetty SBL 18-Nov-22

4 HINO Hino Jakarta Workshop Setia - Jetty SBL 18-Nov-22

5 HINO Hino Jakarta Workshop Setia - Jetty SBL 18-Nov-22

11/18/2022 Progress Meeting 4


Delivery Unit ke Site
Delivery #3

No Merk Lokasi Awal Lokasi Tujuan Tanggal Tiba

1 HINO Hino Palembang Workshop Setia - Jetty SBL 19-Nov-22

2 HINO Hino Palembang Workshop Setia - Jetty SBL 19-Nov-22

3 HINO Hino Palembang Workshop Setia - Jetty SBL 19-Nov-22

4 HINO Hino Palembang Workshop Setia - Jetty SBL 19-Nov-22

5 HINO Hino Palembang Workshop Setia - Jetty SBL 19-Nov-22


Delivery #4

No Merk Lokasi Awal Lokasi Tujuan Tanggal Tiba

1 HINO Hino Palembang Workshop Setia - Jetty SBL TBA

2 HINO Hino Palembang Workshop Setia - Jetty SBL TBA

3 HINO Hino Palembang Workshop Setia - Jetty SBL TBA

4 HINO Hino Palembang Workshop Setia - Jetty SBL TBA

5 HINO Hino Palembang Workshop Setia - Jetty SBL TBA

11/18/2022 Progress Meeting 5


Topic two
KOMISIONING
Komisioning Status

No Merk Tipe No Plat No Lambung Status Komisioning Delivery

1 HINO FM 280 JD BK 9586 FA 1929 Done Delivery #1

2 HINO FM 280 JD B 2838 XGW 1939 Done Delivery #1

3 HINO FM 280 JD BG 8405 LH 1949 Done Delivery #1

4 HINO FM 280 JD BM 8709 RU 1959 Done Delivery #1

5 HINO FM 280 JD BK 9927 EL 1969 Done Delivery #1

11/18/2022 Progress Meeting 7


Komisioning Status

• Komisioning unit – unit


delivery ke dua #2 :
• Collecting SIM, KTP, STCK
• STCK asli sudah diminta untuk
tidak dibawa Kembali oleh
dealer
• Proses pengajuan

11/18/2022 Progress Meeting 8


Topic three
WORKSHOP
Workshop temporary

• Untuk saat ini dibantu oleh • Workshop milik ERM saat ini
workshop setia, untuk check masih proses pembangunan,
poin dekat Jetty estimasi di bulan Desember /
Januari sudah dapat digunakan

11/01/2022 Weekly Meeting 10


Workshop ERM

• KM 18

11/01/2022 Weekly Meeting 11


Topic Four
LOGISTIK
LOGISTIK

• Spring / Suspensi
• Oli
• Penyiapan spare part “fast moving” • Filter
• Stokist • Tire (Ban Luar & Inner Tube)
• Kompressor
• Tools

11/01/2022 Weekly Meeting 13


LOGISTIK

• Pembelian 2 unit tangka solar : 2 x


• Tangki Solar
10KL Tanki bekas CPO

11/01/2022 Weekly Meeting 14


Part Hino FM 280 JD 1872 6 Bulan
No P/N Description Qty Price Total Remarks
1 23304JAE51 Element Set, Fuel Filter 7 83,000 621,504 250 Hrs
2 23304JAF20 Element Set, Pre-Filter 2 179,000 335,088 1000 Hrs
3 23304JAF40 Element Set, Oil Filter 7 224,000 1,677,312 250 Hrs
4 31250JAE90 Disc Assy Clutch 1 3,261,000 3,261,000
5 31210JAC40 Cover Assy Clutch 1 4,792,000 4,792,000
6 S312421060 Bearing Clutch Throwout R/F 1 567,000 567,000
7 SZ37125045 Bearing, Ball 1 297,000 297,000
8 04477JAE50 Brake Lining, Fr 2 116,000 232,000
9 04477JAE60 Brake Lining, Rr 4 165,000 660,000
10 48101LAA52 Leaf Spring Fr, No.1 W/Bush 2 1,214,000 2,428,000
11 48112LAA52 Leaf Spring Fr, No.2 2 1,075,000 2,150,000
12 48113LAA42 Leaf S/A Fr, Spring No.3 2 836,000 1,672,000
13 48211LAA51 Leaf Spring Rr, No.1 2 1,424,000 2,848,000
14 48212LAA51 Leaf Spring Rr, No.2 2 1,368,000 2,736,000
15 48213LAA51 Leaf Spring Rr, No.3 2 1,387,000 2,774,000
27,050,904
LOGISTIK
No Merk Size Qty Price Total Remarks
1 Techking 11.00R20-18PR (Radial ETFN U tread depth 21mm) 5 5,200,000 26,000,000 New
2 Techking 11.00R20-18PR (Radial ETFN U tread depth 21mm) 5 2,100,000 10,500,000 Trade in
36,500,000

No Component Oil & Coolant Spec Qty Price Total Remarks


1 Engine Oil SAE 15W/40 CI-4 = 34 ltr 262 28,708 7,523,828 250 Hrs
2 Trans Oil SAE 30 TO-4 = 25 ltr 47 26,316 1,231,579 1000 Hrs
2 Final Drive Oil SAE 30 TO-4 = 57 ltr 107 26,316 2,808,000 1000 Hrs
3 Tandem Oil SAE 30 TO-4 = 95 ltr 89 26,316 2,340,000 2000 Hrs
4 Circle Gear SAE 90/GO = 8 ltr 9 42,105 394,105 2000 Hrs
5 Front Axle SAE 30/EO = 0,9 ltr 1 26,316 24,632 2000 Hrs
6 Hydraulic SAE 10W/ISO VG 46 = 80 ltr 75 25,837 1,934,699 2000 Hrs
7 Radiator Coolant AF-NAC =58 Ltr 27 4,385 119,016 4000 Hrs
8 Grease 15 1,425,000 21,340,800
16,375,858

79,926,762
11/01/2022 Weekly Meeting 15
RUTE Hauling

KM 57 Jetty
GPU KM 18
SBL

128 Kilometer

11/01/2022 Weekly Meeting 16


Thank you
PT. EQUIPMENT RELIABILITY
MANAGEMENT
The way to get started is to
quit talking and begin doing.
Walt Disney