SyteLine:
Using Bills of Material & Engineering Change
Notices (BOM/ECN)
• Annotation tools
• Select an annotation tool and
click inside the Content Viewer to use
Log on credentials:
User ID: SytelineTest011 – 017
Password: nah5rehest
Step Description
SA-50910, Bicycle Frame
10 Weld
10, Weld
SA-50910, Bicycle Frame TR-20000, Aluminum Frame
TR-20000, Aluminum Frame 20, Paint
20 Paint
SP-908, Sprocket PT-10000, Blue Paint
PT-10000, Blue Paint 30, Assemble
30 Assemble
SP-908, Sprocket
40 Inspect 40, Inspect
• Procedure
Many default values on the following forms originate from other forms:
• Work centers
• Operations
• Materials
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
16
Check your understanding
In SyteLine, what is the difference between an item routing
and a bill of materials?
Current BOM
• In this lesson, we will focus on a few of the fields that are key to creating
BOMs.
• Shrink Factor – linked to the Yield field on any of the item’s operations
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
29
Check your understanding
What does a low-level code of zero indicate for an item?
• Resources, resource groups, and work centers are now needed before
defining operations.
• Procedure
• Create a resource group record.
• Complete the header fields.
• Specify the resources that are part of the group.
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
41
Check your understanding
How can you assign one specific resource to an operation?
• Identify the key fields on the Current Operations form for creating a BOM.
• The following elements for our BOM have been created in the last two
lessons:
• Items
• Resources
• Resource groups
• Work centers
• In this lesson you will learn how to add operations records to an item
routing, set production times, and assign resource groups to each
operation.
• Quantity
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
56
Check your understanding
When entering the hours per piece on an operation record,
the value of which field determines whether the Machine
Hours per Piece field or the Labor Hours per Piece field is
used?
• Identify the key fields on the Current Materials form for creating a BOM.
• In this lesson you will learn how to add materials to operations, and how
to specify alternate materials as needed.
For Item 2, Item 3a is primary material, Item 3b is first alternate material, Item 3c is second alternate material
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
72
Check your understanding
Describe how the Effective Date field on the Current
Materials form is used.
• List the system records that must be set up for using outside operations in
a routing.
• Uses that PO’s due date when scheduling the finish date of the operation.
• Create a shift that starts on Sunday at 00:00 hours and ends on Saturday at 24:00
hours (7 days x 24 hours).
• Shifts tab – add the scheduling shift created in previous step (24 x 7)
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
89
Check your understanding
How should a scheduling shift for an outside operation
resource be set up?
• Explain the use of the Item Current Routing and Indented Current BOM
reports.
• There are other activities in SyteLine that you may find useful when
working with BOMs.
• Shows each operation for the standard job for a selected range of items,
product codes, and operations.
• Also includes:
• Materials
• Alternate materials
• Notes
• Click Process.
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
98
Copy Routing BOM form
• Fields for setting copy parameters:
• From Category • Copy UET Values
• To Category • Copy Indented BOM
• Job • Extend by Scrap Factor
• Sched ID • Option
• Rework • Labor, Material, or Both
• Item • After Oper
• Release • Effective
• Revision • Copy to PS Release BOM
• Starting and Ending Operation
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
102
Check your understanding
Give an example of how you might use the Copy
Routing/BOM activity.
• Identify the supporting code lists that must be set up for ECNs.
• ECN planning
• Which BOM types and items need control
• List of reasons that changes are needed
• Priorities for implementation
• Distribution lists for notifications and approvals
• Inventory Parameters form
• Select BOM types to control (Current, Job, or Estimating)
• All – all changes for that BOM type are under ECN control
• Individual – only items within that BOM type with Revision Track check box selected are
under ECN control
• Never – ECNs are not used for that BOM type
• All three forms can be found in Master Explorer > Modules > Materials >
Engineering Change Notices > Files folder.
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
110
Scenario: ECN set up
• Refer to your Training Workbook for instructions to
complete this activity on your own.
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
112
Check your understanding
What are the three BOM types that ECN control can be
established for?
1. Current BOM
2. Job BOM
3. Estimating BOM
• Form fields:
• From Type
• Line Status
• From and To ECN
• Starting and Ending ECN Line
• Job Type
• Process Preview and Commit
• All ECN items within the ECN must be approved or not approved before
the ECN can be approved or not approved.
• Status of the ECN items and the ECN can be individually changed
manually or by using a change status utility.
• Change ECN item status
• Change ECN status utility
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
134
Check your understanding
Which utility do you use to save the current bill of materials
for an item to History?
?
Copyright © 2014. Infor. All Rights Reserved. www.infor.com
140
Course review
Select the BOM types that are supported by SyteLine.
Select all that apply.
a. Current
b. Estimating
c. Industry
d. Job
e. Production Schedule
f. Standard
g. Temporary
a) Current
b) Estimating
c) Job
d) Production Schedule
e) Standard
a) Shrink Factor
b) Lot Number
c) Safety Stock Percent
d) Unit Cost
a) 20.00
b) 0.20
c) 0.33
d) 20/60
a) Manufactured
b) Other
c) Purchased
d) Transferred
a) Current BOM
b) Job BOM
c) Estimating BOM
d) Standard BOM