Powerlift ESP Industry

Downhole Unit Installation & Pulling Overview

SPH Chapter 20
Guidelines / Content

 HS&E
 Proper Tooling
 Pre-installation Checks
 Installation
 Commissioning
 Pulling

SPH Chapter 20
Health & Safety

 Installation crews must comply with all team and


operator HS&E directives

 Correctly designed and certified tooling should be


used to install & pull the system

 Proper lifting procedures should be used so as not


to damage the equipment or risk the safety of the
installation crew

 At any time if a condition exists that would


compromise the health and safety of the crew, the
job should be stopped and the condition addressed
before continuing

SPH 191
Proper Tooling

 All tools used should be of the proper design and in


good working order
 Use properly designed and certified lifting clamps
and slings
 Meters should be in good condition and regularly
calibrated to ensure accuracy

SPH 191
Proper Tooling

 All tools used should be of the


proper design and in good working
order

SPH 191
Proper Tooling

 Use properly designed and


certified lifting clamps and slings

Serial Number and


Certification Date

Appropriate
Equipment for
Clamp Design

SPH 191
Proper Tooling

 Meters should be in good


condition & regularly
calibrated to ensure
accuracy

SPH 191
Pre-Installation

 Locate and verify equipment


 Position equipment for lifting
 Document serial numbers & specifications
 Do pre-install equipment checks
 Assess site risks
 “Toolbox Talk”
 Prepare work site

SPH 191
Pre-Installation

 Locate and verify equipment


 Position equipment for lifting

SPH 191
Pre-Installation

 Document serial numbers & specifications

SPH 191
Pre-Installation
 Do pre-install equipment checks
 Motor electrical checks (Ph-Ph)(Ph-PG)

The integrity of the motor’s insulation should be tested prior to


installation. Phase-to-phase measurements can be taken
most accurately using a digital multimeter. Record the
measurements and compare them to the data shown in the
motor resistance tables in the Technical and Engineering
Information chapter. Measurements must be balanced
within 2% and the value cannot be less or more than 10%
of the published value.
Phase-To-Ground Measurements :
The megger is used to check the motor insulation resistance
to ground. The meter test lead marked earth is clipped onto
a bolt head where a good ground can be established. The
other probe lead is connected to each phase individually.
Each phase on a new motor must measure a minimum of
120 megohms to ground.

SPH 191
Cable electrical checks (Ph-Ph)(Ph-PG)

1. Remove the shipping cap on the flat cable extension. Conductors at opposite ends must be
clean, dry and clear of the cable reel and each other.
2. Using and ohmeter, connect the ground lead to the cable armor and the probe to each
individual lead. Record the measurements.
3. Using the ground lead and the probe lead, check phase A-B, B-C and A-C. Record the
measurements. New cable should read near infinity both phase-to-ground and phase-to-
phase. Depending on weather and humidity, measurements of only 1500 megohms are
obtainable and considered normal.

 Shaft extension checks (Extension & rotation)


Pre-Installation

 Assess site risks


 “Toolbox Talk”
 Prepare work site

SPH 191
Installation Overview

 Lift motor to servicing position


 Fill motor with oil
 Lower motor into well to connecting position
 Lift seal servicing position and connect to motor
 Fill seal with oil
 Lower seal to assembly position
 Lift pump / intake to servicing position and connect to seal
 Lower pump to assembly position and connect tubing
 Reposition unit, connect and band MLE

SPH 193
Installation Overview

 Lift motor to servicing position


 Fill motor with oil
 Lower motor into well to connecting
position

SPH 194
Installation Overview

 Lift seal to servicing position and connect


to motor
 Fill seal with oil
 Lower seal to assembly position

SPH 194
Seal Filling
Seal Filling

r
Seal Filling

Motor
Fill
Valve
Seal Filling

Motor
Fill
Valve
Seal Filling

Motor
Fill
Valve
Seal Filling

Motor
Fill
Valve
Seal Filling

Middle Guide Fill


Valve,
(Repeat Process for
Upper Guide also)

r
Installation Overview

 Lift pump / intake to servicing


position and connect to seal
 Lower pump to assembly position
and connect tubing

SPH 194
Installation Overview

 Reposition unit, connect & band


MLE

SPH 194
Running In Hole
 Run rate should be steady, but allow time for cable
banding / clamping

 If a field cable splice is required, the process should


be done per manufacturer’s specifications using
proper components

 Electrical readings should be taken periodically to


insure insulation integrity

 Care should be taken not to damage the cable in the


slips
Running In Hole

 Run rate should be steady,


but allow time for cable
banding / clamping

Cable / By-pass
Tubing Clamp

SPH 195
Running In Hole

 If a field cable splice is required, the process should be


done by certified personnel using the manufacturer’s
approved procedures & components

SPH 195
Running In Hole

 Electrical readings should be taken


periodically to ensure insulation integrity for
Each 1000 ft

SPH 195
Commissioning & Start-up

 Final electrical connection of the downhole cable


should be done at the junction box

 Motor controller protection (voltage and current)


should be set per manufacturer’s recommendation

 High & low current settings may have to be disabled


during startup but current should be monitored at all
times

 Under and over current protection should be reset


after unit stabilizes

SPH 198
Pulling

 A unit that has shut down and does not restart


should be analyzed at the surface to determine if the
problem can be linked to a downhole equipment
failure or surface condition
 If the downhole unit has failed, pulling of the unit
should be done with the same care and attention
that is given to the installation
 Valuable information can be collected during the
pulling operation that could be used when the
equipment is analyzed after the pull

SPH 198
Pulling Report

 Data recorded on the pulling report should include …


– Electrical readings of cable & motor
– Any holes in tubing
– Condition of equipment outer surfaces and cable armor
– Debris in pump discharge or intake
– Pump, Seal, and Motor shaft rotation and play
– Condition of oil in seal section & motor

SPH 198
8. Operation and Shutdown of Downhole Equipment