SPH Chapter 20
Guidelines / Content
HS&E
Proper Tooling
Pre-installation Checks
Installation
Commissioning
Pulling
SPH Chapter 20
Health & Safety
SPH 191
Proper Tooling
SPH 191
Proper Tooling
SPH 191
Proper Tooling
Appropriate
Equipment for
Clamp Design
SPH 191
Proper Tooling
SPH 191
Pre-Installation
SPH 191
Pre-Installation
SPH 191
Pre-Installation
SPH 191
Pre-Installation
Do pre-install equipment checks
Motor electrical checks (Ph-Ph)(Ph-PG)
SPH 191
Cable electrical checks (Ph-Ph)(Ph-PG)
1. Remove the shipping cap on the flat cable extension. Conductors at opposite ends must be
clean, dry and clear of the cable reel and each other.
2. Using and ohmeter, connect the ground lead to the cable armor and the probe to each
individual lead. Record the measurements.
3. Using the ground lead and the probe lead, check phase A-B, B-C and A-C. Record the
measurements. New cable should read near infinity both phase-to-ground and phase-to-
phase. Depending on weather and humidity, measurements of only 1500 megohms are
obtainable and considered normal.
SPH 191
Installation Overview
SPH 193
Installation Overview
SPH 194
Installation Overview
SPH 194
Seal Filling
Seal Filling
r
Seal Filling
Motor
Fill
Valve
Seal Filling
Motor
Fill
Valve
Seal Filling
Motor
Fill
Valve
Seal Filling
Motor
Fill
Valve
Seal Filling
r
Installation Overview
SPH 194
Installation Overview
SPH 194
Running In Hole
Run rate should be steady, but allow time for cable
banding / clamping
Cable / By-pass
Tubing Clamp
SPH 195
Running In Hole
SPH 195
Running In Hole
SPH 195
Commissioning & Start-up
SPH 198
Pulling
SPH 198
Pulling Report
SPH 198
8. Operation and Shutdown of Downhole Equipment