Definition of Material Management
2
AIM OF MATERIAL MANAGEMENT
To get
1. The Right quality
2. Right quantity of supplies
3. At the Right time
4. At the Right place
5. For the Right cost
3
PURPOSE OF MATERIAL MANAGEMENT
•To gain economy in purchasing
•To satisfy the demand during period of
replenishment
•To carry reserve stock to avoid stock out
•To stabilize fluctuations in consumption
•To provide reasonable level of client services
4
Objective of Material
Management
Primary Secondary
•Right price •Forecasting
•High turnover •Inter-departmental
•Low procurement
•& storage cost
harmony
•Continuity of supply •Product
•Consistency in improvement
quality •Standardization
•Good supplier •Make or buy
relations decision
•Development of
•New materials &
personnel
•Good information products
system •Favorable reciprocal
relationships
5
Four basic needs of Material Management
1.To have adequate materials on hand when
needed
2.To pay the lowest possible prices,
consistent with quality and value
requirement for purchases materials
3.To minimize the inventory investment
4.To operate efficiently
6
Basic principles of material management
1. Effective management & supervision
It depends on managerial functions of
• Planning
• Organizing
• Staffing
• Directing
• Controlling
• Reporting
• Budgeting
2. Sound purchasing methods
3.Skillful & hard poised negotiations
4.Effective purchase system
5.Should be simple
6.Must not increase other costs
7.Simple inventory control programme
7
Points to remember while purchasing
•Proper specification
•Invite quotations from reputed firms
•Comparison of offers based on basic price, freight& الشحن
insurance, taxes
•Quantity & payment discounts
•Payment terms
•Delivery period, guarantee
•Vendor reputation
(reliability, technical capabilities, Convenience, Availability, after-
sales service, sales assistance)
•Short listing for better negotiation terms
•Seek order acknowledgement
8
Storage
•Store must be of adequate space
•Materials must be stored in an appropriate place
• in a correct way
•Group wise & alphabetical arrangement helps in
•identification & retrieval
•First-in, first-out principle to be followed
•Monitor expiry date
Issue & use
Can be centralized or decentralized
9
Inventory control
10
Functions of inventory control
11
•Re-order level: stock level at which fresh
order is placed. This equal to =
Average consumption per day x lead
time + buffer stock
•Lead time: Duration time between placing
an order & receipt of material
•Ideal – 2 to 6 weeks.
12
Raw materials:- These are materials that are
used in the product which is in an
unprocessed condition.
13
In-progress materials:- They are called ‘work
in progress’ inventories. These goods require
further processing.
14
Four factors affecting the purchase of raw materials
are
1) Quality :- The suitably of an item to accomplish the
intended work.
The raw materials should satisfy the following
requirements.
i. A- Efficiency of the material.
ii. B- Cost and the shelf –life عمر المنتج.
iii. C- For equipments, power consumption and power
requirement.
15
From the inventory point of view, quantity standards
are decided on the following parameters;
i. A- Maximum inventory
ii. B- Minimum inventory
iii. C- Standard order
iv. D- Reorder point
3) Price
4) Delivery Date
16
Definition:- It is a systematic study of every
element for it’s cost in a part, material or service to
make certain that it performs it’s function at the
lowest possible cost.
Benefits of value analysis:-
i. A- Decrease in existing cost of the product or
service.
ii. B- Unnecessary expenditure is identified and
eliminated.
iii. C- Product value improves for new materials and
processes.
iv. D- More profits.
17
In this technique (n) number of questions are applied, like:-
o what must I do?
o What else does the item do?
o What does it cost?
o What else will the job do?
o What will be alternative costs?
18
Centralized :- the purchasing Decentralized:- different
procedure of materials for department purchase their
different department is requirement seperately.
done together from one This is basically seen in
purchasing department. large organizations.
This is seen in small
organizations. Advantages
Advantages A-Flexible purchasing
A- Efficient system system
B- Bargaining capabilities B- Procurement الش راءis
increasedزيادة القدرة على faster
المفاوضة
C-Good raw material
obtained at lower price
19
The supplier or the person who sells the required
materials or services for the production is known as a
vendor.
20
Four stages of vendor development
21
The following sources are considered for information
Trade directories دالالت تجاريه:-
Trade journals:- e.g. Pharmatimes
Telephone directories
Supplier’s catalogue
Salesmen
22
After getting the information of the suppliers, detailed
analysis of the supplier is being carried out. A
comparison is being made between the different
suppliers on basis of the following points:-
a. Technological competition,
b. service competition,
c. price competition,
d. delivery time.
23
The following aspects can be verified by the first hand
visit:-
Internal facilities of the vendor
Financial adequacy, stability and reputation of the
vendor
Location of vendor’s factory
After sales service
Industrial relations
24
The vendors who clear the enquiry stage are selected and
negotiations are being carried out with them.
25
The buyer evaluates and appraises the performance of
the vendor.
The objective is to improve the performance of the
vendors.
Few ways of evaluating a vendor are:-
o Categorial method
o Weighted point method
o Cost ratio method
26
The buyer sets up some category on which the evaluation of the vendor is done.
Specimen عينهof supplier’s evaluation form is given below.
Grading
Rigorous دقيقfollow
up is not necessary
Willing to
accommodate
استيعابwhen
production schedules
are suddenly
changed
27
Here the rating points are divided between quality,
delivery and price.
28
Quotations الع روض:- It is a kind of an inquiry
done to know whether the vendor can supply the
desired material and at what price.
They are not the purchase order. They just contain
29
Spot quotations:- this is basically used for the small
items not related to the technical purpose.
30
Tenders:-
It is a written letter or a published
document that is aimed at finding the price for
procuring للحصول علىcertain materials.
31
Single tender:- It is invited from one reliable
supplier. This kind of tender is floated يط رحonly
when the items are required urgently.
Open tender:- Also known as ‘ press tender’. This
is used when the value of item to be purchased is
very high. It is used to locate more suppliers.
In this tender procured, a small amount of the
deposit money is taken from the supplier so that
they do not withdraw from the submitted rates.
هنا المزود ال يستطيع االنسحاب من االسعار المقدمة
32
Closed tender or limited tender (Negotiations):- It is done
to arrive at the mutual understanding between the
supplier/vendor and the buyer.
33
What’s the need for negotiation?
@ prices are related to large volumes or to a large
value.
@ terms and conditions are required for large volumes.
@ contract is desired for a longer period.
@ variations in quantity to be purchase are possible.
@ when supplies or services can be obtained from only
one source.
@ when no acceptable quotations عروضare received
from the other vendors.
34
Process of negotiations:- It is a kind of win-win situation.
Both the parties try to benefit to the maxima through the
negotiation.
It is not a kind of bargaining but a mutual understanding
between the two parties.
35
Discounts:- They are cash concessions تنازلoffered by the vendor
to the buyer, in order to enhance the volume of the business
opportunities.
Reasons for offering discounts?????
! When there is a bulk purchaseشراء ذو حجم كبير.
! When the bills are cleared immediately. عند دفع الفاتورة
مباشرة
! And also to maintain the good rape اي عالقة وثيقةwith
the buyer
Types of discounts:-
1) Volume contracts.
2) Deals
3) Discounts
4) Consignment terms
36
# Volume contracts:- This kind of discount is offered
proportionate متناسب معto the volume of material ordered.
37
The purchasing department of the company is
responsible for the purchase of all the raw materials as
well as the requirements.
The following steps are followed in the purchasing cycle.
1) Recognition of need and receipt of requisitionالمطل وب:
The requisition includes the following information:-
- Name
- Quality and quantity specifications
- Date by which material is required
- Place at which material is to be delivered
38
2) Selection of potential sources of supply
3) Making request for quotationالعروض
4) Receipt and analysis of quotations
- material specifications and quality
- price of the material
- taxes
- terms of payemeny
- place of delivery
- delivery period
- guarantee period
- validity of tender
39
5) Selection of right source of supply
6) Issuing the purchase order
7) Follow-up of the order
8) Receipt of materials,reports and analysis
9) Checking and approving of vendor’s invoice for
payment
10) Closing of completed order
11) Maintenance of record and file
Purchasing cycle flow chart has been given in the
following slide.
40
Location of Stores :
Objectives :
Minimum wastage of space
Maximum ease سهولةof operation
Minimum handling costتكلفة النقل او التدبير
Minimum other operational cost
41
Functions of stores
Maintenance of hygieneالنظافة,
sanitationالجانب الصحي, and pest
controlمكافحة االفات
Maintenance of material handling
equipment
42
Functions of stores
Optional functions :
Dispensingتوزيع, Maintenance of weights &
measures
43
RightDefinition :
Material handling uses the
right method to provide the right amount
of the right material at the right place, at
the right time, in the right sequence, in
the right position, in the right condition,
and at the right cost.
44
Involves handling, storing, and controlling
material
The raw materials, in-process materials and
finished goods are moved from one place to
another in the plantالمؤسسة.
Adds value through time and place utility
Impacts space requirement, profits, quality,
safety, and productivity
On an average, 20% of production cost is
spent on material handling system
45
1. Planning principle. Plan all material handling
and storage activities to obtain maximum
overall operating efficiency.
46
3. Material flow principle. Provide an
operation sequence and equipment layout
تصميمoptimizing material flow.
47
6. Space utilization principle. Make optimum
utilization of space .
48
9. Automation principle. Provide automation
to include production, handling, and
storage functions.
49
11. Standardization principle. Standardize
handling methods as well as types and sizes
of handling equipment.
50
13. Dead weight principle. Reduce ratio of
dead weight of mobile handling equipment
to load carried.تخفيض نسبة المواد المفقوده
51
16. Obsolescence principle: مبدأ التقادمReplace
obsolete handling methods and equipment
when more efficient methods or equipment
will improve operations.
52
18. Capacity principle. Use handling
equipment to help achieve desired
production capacity.
53
Safely
Efficiently
At low cost
In a timely manner
Accurately (the right materials in the
right quantities to the right
locations)
And without damage to the materials
54
Increase in cost of raw material and finished
products
Delay in production schedule and long
production cycle
Waste of machine time and personnel time
Increase in in-process inventories
Damage or loss of material and employee
safety liabilitiesمتطلبات
Employee frustration and reduced morale
Customers dissatisfaction
55
Salvage :
It is defined as the processing of materials
(items) for advantageous use or disposal of
company property, which is no longer
economically useful in its present position.
Salvage operation :
Waste materials are properly collected and
stored at one place continuously, so that
these can form a separate batch in
production.
Recoverable materials مواد قابلة العادة استعمالهاare
stored in a scientific way as other items
stored.
56
Disposal مستهلكاتof scrapالمتبقية,
waste and surplus materials can be
effected by several way :
58
Containerization :
59
It eliminates unproductive handling of the
materials like back-trackingالتتبع اعادة,
rehandling اعادة المعالجةetc.
60
The quality of the materials is also
maintained through minimum human
touches, elimination of breakagesالكسور, etc.
61
Reduced operating costs and timely
production.
62