Professional Documents
Culture Documents
A
GROUP
A CASE STUDY
The project concept entails development of Infinity Industrial Park where 200 acres of land
will be bought and serviced with all requisite infrastructure facilities constructed to
SLIDE TWO
international standards. The park when fully developed is expected to enhance Kenya’s
position as an international competitive and attractive investment location. The Park will be
comprehensively designed and planned to provide an institutional framework, physical
SLIDE THREE
infrastructure and administrative services that are currently not available elsewhere in the
entire Eastern and Central African region. The actual design components of the proposed
development, as depicted on the architectural drawings attached in this study, include:-
SLIDE FOUR
Creation of the basic and standard infrastructural amenities towards realization of this goal
Construction of numerous godowns and other peripheral amenities Construction of a driveway,
sidewalk and parking lot for vehicles Development utilities (water, drainage, electricity etc)
SLIDE FIVE
SCREENING
SLIDE ONE
An Environmental Impact Assessment study was carried out and the study handed to
SLIDE FOUR
NEMA on 10th January 2014 an assigned reference NEMA/EIA/PSR/1518. On review, the
Authority saw the need to conduct a thorough Environmental Assessment Study to further
address any possible impacts from this project. The sheer magnitude of the project with a
SLIDE FIVE
possibility of diverse industrial possibilities necessitated the study.
ENVIRONMENTAL EXAMINATION
SLIDE ONE
There is a growing concern in Kenya and at global level that many forms of development
activities cause damage to the environment. Development activities have the potential to damage
the natural resources upon which the economies are based. Environmental Impact Assessment is a
SLIDE TWO
useful tool for protection of the environment from the negative effects of developmental
activities. It is now accepted that development projects must be economically viable, socially
SLIDE THREE acceptable and environmentally sound.
SCOPING
SLIDE FOUR
The project assessment investigates and analyses the anticipated environmental impacts of the
proposed development in line with the Environmental (Impact Assessment and Audit ) 2003
location of the project including the physical area that may be affected by the project’s activities.
SLIDE FIVE
IMPACTS MITIGATION AND ENVIRONMENTAL MANAGEMENT
SLIDE ONEMANAGEMENT or MONITORING PLAN
during its construction, operation and associated with the life cycle of the
Interviews were carried out in the neighbourhood by the use of one on one conversations
SLIDE TWO
and printed questionnaires to find out all the views from the neighbours’ within Githioko
estate towards the Eastern Industrial Park project.
SLIDE THREE
SLIDE FOUR
SLIDE FIVE
SLIDE ONE
THANK
YOU
SLIDE TWO
FOR
SLIDE THREE
SLIDE FOUR
LISTENING
SLIDE FIVE