Professional Documents
Culture Documents
HPCL
BOKARO
DEPOT
SUSTAINABILITY IS THE NEW WAY OF
LIVING!
2
ENERGY
EFFICIENCY
(100 Points)
- Implement comprehensive
measurement, monitoring
and management systems
for energy parameters.
- Adopt progressive targets
in environmental
parameters and ensure
resource availability
towards achieving them.
Average DAILY
EB
Solar- 23.4
Consumption:
4395 Units
Solar
Generation :
Thermal-6.2 1459 units
DG
Electrical-
70.4 Consumption:
390 Units
Critically monitor and control usage of major energy consuming equipments (ACs & Lights)
Contract Demand reduced from 1500 KVA to 750 KVA and further to 550 KVA.
Installation of energy meters on feeders, Variable Frequency Drives (VFDs), Soft Starters, LEDs. Installation of
1. Daily
Mean variance
Value study
= 1.1 KWH/KL
KWH/KL of Feeders carried
out.
2. Analysis done for
more than 10%
variation.
60%
1. HMT
Mean and=Under
Value 1.1 KWH/KL
carriage light
operated due to
Rake Unloading
LIGHTING AC LIGHTING AC
Timestamp PANEL-1 PANEL-2 Remarks
07-03-2024
00:00 64.15 332
08-03-2024 Rake
00:00 87.44 788.66 unloading
09-03-2024 Rake
00:00 115.55 840.95 unloading
10-03-2024 Rake
00:00 103.78 618.84 unloading
11-03-2024
00:00 131.055 326
12-03-2024
00:00 119.69 318.69
13-03-2024
00:00 119.79 271.58
14-03-2024
00:00 60.47 154.95
1. Ethanol
Mean ValuePump
= 1.1 KWH/KL
insulation was found
to be low and after
cable rectification,
consumption
reduced
Due to this energy efficiency and efficacy improved. High to low consuming electrical
components/apparatus would be identified and corrective action taken to improve efficiency.
Utilization of VFDs, savings 40% and Soft starters (Reduces Peak Demand)
20
21
Case Studies with Corrective actions
after Variance Analysis
Date Issue Observed
5 April 2023 Observed insulation of Ethanol Pump is low and was drawing higher current of 55 Amps. After
replacing cables, the drawing current reduced drastically to 40-43 Amps.
Rectification:
Insulation of Ethanol pump is rectified by replacement of cables. After replacement of cables,
ethanol pump is drawing lower current which helps in lower unit consumption. A savings of Rs
5200 per month is achieved.
Rectification:
Solae generation was monitored for the day, it was observed that due to faulty inverters, solar
generation was not happening.
Training to electrician on
detecting cable fault and
corrective action to be taken.
Individual
Installation of VFDs for each
Energy Meters pump. All
for Daily Integrated
Monitoring with Terminal
Automation
system
Individual
Installation of VFDs for each
Energy Meters pump. All
for Daily Integrated
Monitoring with Terminal
Automation LED in Gantry
LED in Sheds
system
9 Thermal Energy to Electrical Energy Conversion kWh 165455 133223 96694 55867
10 Total Annual Energy of the location kWh 901726 818951 817665 688405
Month Jan'22 Feb'22 Mar'22 Apr'22 May'22 June'22 July'22 Aug'22 Sept,22 Oct,22 Nov'22 Dec'22
Monthly
14500 14500 14500 14500 14500 14500 14500 14500 14500 14500 14500 14500
output
Actual
Monthly 13830 14320 14390 13512 13753 13774 12300 12850 13555 13450 12340 14331
O/P
Efficiency 95% 99% 99% 93% 95% 95% 85% 89% 93% 93% 85% 99%
Month Jan'23 Feb'23 Mar'23 Apr'23 May'23 June'23 July'23 Aug'23 Sept,23 Oct,23 Nov'23 Dec'23
Monthly
14355 13398 14355 14355 14355 14355 14355 14355 14355 14355 14355 14355
output
Actual
Monthly 4711 11597 13514 13456 13452 8400 6926 29911 31590
O/P 13426 14353 7765
Efficiency 33% 87% 94% 94% 100% 94% 94% 59% 48% 54% 208% 220%
Month Jan'24 Feb'24 Mar'24 Apr'24 May'24 June'24 July'24 Aug'24 Sept,24 Oct,24 Nov'24 Dec'24
Monthly
14355 13398 14355
output
Actual
Monthly 30037 31224 9632
O/P
Efficiency 209% 233% 67% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
31
STRATEGY FOR SEC REDUCTION
Regular
Variance Awareness Recognition
Analysis and Training Schemes
Equipment
wise Process Preventive Root Cause
Consumption Improvement Maintenance Analysis
monitoring
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
32
ENERGY FLOW DIAGRAM
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
32
SEC AND PROJECT
PROJECT NAME BUDGET (Rs) Budget Allocation UNIT SAVED IN KWH Year SEC for the Year
Installation of additional
13000000 13000000 115028 2023-2024 1.28
225 KWP Solar Plant
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
35
SEC PATTERN FOR LAST 4 YEARS
1.87
1.86
1.80 31 %
Reduction
of SEC in
1.28 2023-24.
Base 0.5% 4%
Year
31%
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
35
THRUPUT PATTERN (TMT) IN LAST 4 YEARS
592.34
494.72
473.14
10%
395.79 increase by
442.9 March
2024
Till March
2024 should
reach
2019-20 2020-21 2021-22 2022-23 2023-24* 640.34
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
32
Details of the projects implemented to reduce specific energy
consumption
• Installation of 150 KWp On-grid Solar (Jan-2020) and 225 KWp on grid ground
mounted solar in (2023). Hence, Total 375 KWp Solar.
• Bi-Directional Meters installed for monitoring Export and import energy data.
Major Projects • Installation of Energy Meters for Monitoring (CEMS online Portal)
• Conversion of conventional lightings of all areas in LED light fittings
• Installation of VFD for 200 KW FO motor, Saving 40% of energy
• Filling rate enhancement by maximizing flow rate to 1600 LPM (Change in
Loading Arms)
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
37
INITIATIVES DURING PROJECT
Reduction of CD
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
38
Savings from Reduction of CD
Details of Electricity Consumption FY-2020-21
Contract
Unit Actual
Consumption Units Demand 1500
Consumed P.F. Demand
Month KVAh KVA, Billing
KWh (KVA)
(= 75% of CD)
Saving = Rs 23.62 Lacs per annum 20-Apr 43884 46080 95 313.2 1125
20-May 45072 47232 95 115.2 1125
20-Jun 53568 55512 96 352.8 1125
20-Jul 66564 68652 97 403 1125
20-Aug 32029 33577 95 68 1125
20-Sep 71290.8 73846.8 97 327 1125
20-Oct 69552 71712 97 352 1125
energy saving
Implemented in Dec,21 20-Nov
20-Dec
75456
79956
77472
82872
97
96
316.8
316.8
1125
562.5
21-Jan 66528 69156 96 122.4 562.5
21-Feb 65988 68688 96 363.6 562.5
21-Mar 66384 68976 96 450 562.5
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
38
Installation of Solar Plant 375 KWp
200000
100000
50000
0
2021-22 2022-23 2023-24
Implemented in Jan 2021 and Nov,23 KWH
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
38
Savings from LED
monthly
Earlier 06:30PM to 06:30AM (12
528 211 12 2532
Scenario Hrs)
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
41
Individual VFDs for every pump
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
45
CEMS for controlling, monitoring and recording
VFD performance
Gross Energy Saving by Installation of VFDs and Soft Starters
Sl Rated Power Running Savings in
Particulars Savings (In KW) Remarks
No KW KW Hrs Unit/Day
Savings of 156240 KWH per Annum
HSD Pump
1 1 45 25 20 8 160 VFD
HSD Pump Without
2 2 45 32.2 12.8 6 76.8 VFD
HSD Pump Without
3 3 45 32.2 12.8 2 25.6 VFD
HSD Pump Withot
4 4 45 32.2 12.8 2 25.6 VFD
SKO
loading is
7 SKO Pump 37 very few
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
41
Bay Utilisation : Productivity Improvement
HPCL BOKARO DEPOT CREDIT 2 : REDUCTION IN SEC FOR PAST 3 YEARS 50 POINTS
48
30 KW
Series 1
Drawing
Maximum Rating of Pump-30 KW Higher power
due to low
insulation.
42.00 Rectified
01.11.21 27.00
01.12.21 29.00
37.00 01.01.22 25.00
01.02.22 28.00
01.03.22 27.00
01.04.22 26.00
29.00 28.0027.00 28.00 28.0029.00 29.00 28.0028.00 01.05.22 28.00
27.00 26.00 26.00 26.00 27.00 01.06.22 26.00
25.00 25.0024.00 25.00 25.0026.00 01.07.22 28.00
23.00 01.08.22 29.00
01.09.22 25.00
01.10.22 24.00
01.11.22 0.00
01.12.23 23.00
01.01.23 29.00
01.02.23 37.00
01.03.23 42.00
01.04.23 25.00
01.05.23 26.00
01.06.23 28.00
01.07.23 28.00
0.00 01.08.23 25.00
1 1 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 01.09.23 26.00
1.2 2.2 1.2 2.2 3.2 4.2 5.2 6.2 7.2 8.2 9.2 0.2 1.2 2.2 1.2 2.2 3.2 4.2 5.2 6.2 7.2 8.2 9.2 0.2 01.10.23 27.00
.1 .1 .0 .0 .0 .0 .0 .0 .0 .0 .0 .1 .1 .1 .0 .0 .0 .0 .0 .0 .0 .0 .0 .1
01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01.11.23
01.12.23
27.00
26.00
01.01.24 28.00
01.02.24 26.00
Series 1
21 21 21 22 22 22 22 22 22 23 23 23 23 23 23 24
01.09.23 98.00
. . . . . . . . . . . . . . . . 01.10.23 97.00
. 06 . 08 . 10 . 01 . 03 . 05 . 07 . 09 . 11 . 01 . 03 . 05 . 07 . 09 . 11 . 01 01.11.23 97.00
01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01.12.23 97.00
01.01.24 97.00
01.02.24 97.00
2
T ank T ruc k
K IR L O S AK R IE 2 - 94.5% IE 3 - 95.4%
Approx 80%
P ump Motors
3
T ank Wag on
K IR L O S AK R IE 2 - 94.5% IE 3 - 95.4%
equipment used are
P ump Motors
4 VF D L &T
VF D + Invertor
B es t in the Market
best available in
T ec hnolog y
5
H ig h Mas t
B AJ AJ 0.98 power fac tor B es t in the market
market
T owers
6 J oc key P ump K IR L O S K AR IE 2 - 93.8% IE 3 - 95.4%
7 UP S 20 K VA HITACHI H IT AC H I B es t in the market
8 C C TV INF INO VA VP 130-A220C 762 B es t in the market
9 LE D S AMS UNG Q E 55T B es t in the market
10 AC B L &T B es t in the market
C AP AC IT O R
11 L &T B es t in the market
B ANK
12 F IR E E NG INE K IR L O S K AR B es t in the market
E L E C T R IC AL
13 L &T B es t in the market
P ANE L
14 S olar Inverter P ower O ne B es t in the market
15 Air C ompres s or S ullair B es t in the market
16 Air C onditioner 5 s tar rated B es t in the market
17 F ANS Normal F ans B L D C F ANS
18 HC D G E L T R O NIX B es t in the market
19 H VL R AK R O N B R AS S B es t in the market
20 C B AC G O DR E J B es t in the market
CREDIT 3.2 : At least 50% of the energy intensive equipment used in the
HPCL BOKARO DEPOT
factory is of best available market efficiency
5 POINTS
56
Other Energy Saving Equipments
50 8 no
NEW VFD
Pumps
62 MOTION
SENSORS
NEW
ENERGY
METERS
5 STAR
RATING AC
PF AND CAPACITOR
MANAGEMENT
CREDIT 3.2 : At least 50% of the energy intensive equipment used in the
HPCL BOKARO DEPOT
factory is of best available market efficiency
5 POINTS
58
High Efficiency (IE2) Motors and Pumps in Tank
Truck and Wagon Loading
CREDIT 3.2 : At least 50% of the energy intensive equipment used in the
HPCL BOKARO DEPOT
factory is of best available market efficiency
5 POINTS
60
1.9 2.6
1.4
1.28
1.0
Raipur Depot Patna Depot Guwahati Depot Haldia Terminal Kolkata Terminal
Improvements >0.95
2. Replacing Conventional gantry
HPCL BOKARO DEPOT CREDIT 4.2.2 : Implementation of Energy Audit Recommendations 3 POINTS
65
SEC Comparison with Competitors
3
2.69
Bokaro Depot
2.5
has lowest SEC
in comparison to
its counterparts 2
situated in same
place and under 1.33
1.5
same
environmental 1.28
condition. 1
0.5
0
IOCL Jasidih BPCL POL BOKARO HPCL POL BOKARO
Series 1
Thank You!