By Asmelash Mebrahtu
Dec, 2023
Adama, Ethiopia
Contents
Introduction
Problem statement
Objectives
Significance of the study
Expected outcome
Scope and Delimitation
Methodology
Work plan
Budget plan
2
Introduction
o Wind energy is one of the most available and exploitable
sources of renewable energy.
o Among them DFIG wind turbines are widely used
Lower converter cost
Sub- and super-synchronous speed
Reduced filter etc.
o However, the stator terminals of these generators are directly
connected to the grid.
3
Cont’d…
o Highly vulnerable to power system faults mainly to
voltage dips.
o So, this project is proposing hybrid SDBR and crowbar to
improve their LVRT capability.
o A fuzzy logic controller will be applied.
o Case study on Adama II wind power.
4
Problem statement
o During grid fault, voltage dips at the POI happens which in
further leads to
Inrush the stator and rotor currents
DC bus over voltages
5
Cont’d…
o As a result, this work is planning an effective measure of
Protection and
Control approach to mitigate the aforementioned problems.
o Moreover, it will enhance the generator’s performance, and
the stability as well as quality of the grid.
6
Objectives
General Objective
o To enhance the LVRT of DFIG wind powers with SDBR and
crowbar protections using fuzzy logic controller.
Specific Objectives
To model and simulate the whole system in MATLAB/Simulink
Investigate the generator’s performance at steady as well as
transient states.
To compare the LVRT enhancing devices using FLC and PI
controllers.
7
Significance of the study
o This research work will benefits directly or indirectly
DFIG wind turbine owners, including EEP
The researcher
8
Expected outcome
o In the end, this project result is expected to show
9
Scope and Delimitation
o In this project
Evaluation of an appropriate value of SDBR
The generator, converter, etc. parameters will be taken from
Adama II wind power
Modelling and simulation will be done in MATLAB/Simulink
10
Methodology
o The general flow employed in this work is
Literature review
Mathematical modelling
G Grid
SDBR
RSC
Filter
DC link GSC
Control
Crowbar
2 3,4 1,2 3,4 1,2 3,4 1,2 3,4 1,2 3,4 1,2 3,4 1
Literature review
Data collection and
analysis
Modelling
Simulation and analysis
Interpretation and
conclusion
Report preparation
13
Budget plan
Table 2: Lists of materials with their costs required for the project
Unit cost
S/No Items Unit Quantity Total cost (ETB)
(ETB)
1 Printing paper Pack 1 800 800
2 Printing (non-colour) PCS 400 5 2000
3 Photo copy PCS 150 3 450
4 Printing (colour) PCS 30 15 450
5 Binder (Hard and ring) PCS 3 600 1800
6 Flash disk PCS 1 600 600
7 Internet - 7 500 3500
8 Mobile cards - 20 25 500
9 Professional cost - 2 2000 4000
Sub total 14100
Contingency Considering 10% 1410
Total 15,510