# States Approved on Approved on Approved on Approved on Approved on Approved on Approved on Total approved in Daily run rate Pending as of Day
(if
to complete
current daily
22-Sep 23-Sep 24-Sep 25-Sep 26-Sep 27-Sep 28-Sep the past 7 days today run rate)
1 Jammu and Kashmir 824 444 666 723 615 332 216 3820 546 27936 51
2 Ladakh 28 8 0 33 81 89 0 239 34 201 6
3 Manipur 0 0 0 34 0 27 0 61 9 520 60
4 Meghalaya 204 83 47 259 60 188 64 905 129 5005 39
Total 1056 535 713 1049 756 636 280 5025 718 33662 155
1200
2 25th Sept (Monday) saw the highest BPM approvals after the 600 535
0
22-Sep 23-Sep 24-Sep 25-Sep 26-Sep 27-Sep 28-Sep
Status of mapping (As on date)
120.00%
100.00% 96.81%
83.73% 82.42%
80.00%
*For a detailed list, kindly refer to the issue registry. The support team can share the status of any other issue not covered here Resolved
Pending
Status of issues reported last week* - 2
Reported issue Current Status
#
4 Need the list of CBOs mapped and D reports or downloadable excel reports made available at SPM/BPM level
unmapped. It was available earlier but with detailed summaries
had been removed.
5 In Hindi mode, the Aadhar verification
doesn't work It is enabled in the new versions
6 P-1 and P-2 reports aren't updating and The mismatches have been identified and the dashboard team is updating
there is a mismatch with dashboard their tables to ensure matching with the reports
values
7 Server issues leading to delays at BPM High CPU utilization causing WB servers loading, the technical team is
level working on resolving this issue
9 Village organization is not reflecting in Issues raised to MW/DIC reports team and has been resolved. If any BPM
BPM ID isn’t able to see, kindly contact support team
10 In BPM id Members: all member not After checking all details guide about Inactive member don’t come for
reflecting approval
*For a detailed list, kindly refer to the issue registry. The support team can share the status of any other issue not covered here Resolved
Pending
KEY UPDATES
New releases and features
Updates on new releases and builds
1. Training of state officials on transaction module tentatively planned for 10-13 th October
How does LokOS interact with NRLM-MIS database for fund transfers ?
e-KYC for
Aadhar verification LokOS
NRLM-
MIS If Rejected:
BPM Sent back to e-BK
For correction
By 1st April ‘23
Mapping to e-BK
All profile data
migrated to LokOS
BPM validates profile
NIC