ZXPOS CNT Introduction

ZTE University
Contents

 Test preparation
 Coverage test
 CS service test
 PS service test
 Indoor coverage test
Overview

 Radio network optimization (RNO) is the important step in network construction.


RNO adjust the planning and design reasonably , improve the network coverage,
increase the network capacity, improve the network service quality and resource
utilization ratio. Make the network operation more stably , and provide excellent
service.
 Data collection is the necessary premise of analysis and adjustment. Optimization
data including : Driving test data ( DT ) ,Call quality test data ( CQT ) ,OMC
performance data, Customer’s complains, Alarm data , signaling data and other
data.
 ZXPOS CNT ( UMTS Edition, Short for CNT) is the professional network
optimization test software developed by ZTE . CNT helps the RNO engineer to do
the test and analysis. Locate network problem and evaluate network quality and
capacity, constitute the optimization solution.

© ZTE Corporation. All rights reserved


Preparation

 Edit the site information table


 Create map and design testing route
 UE driver installation
 Software installation
 Hardware license driver installation and upgrade
 Connect the equipment
 Build the test environment

© ZTE Corporation. All rights reserved


Edit the site information table
 CNT can support Excel format site information table load and
unload.
 The requirement of the site information table, at least must
including 9 parameters as follows:

© ZTE Corporation. All rights reserved


Create map and design testing route
 Tow methods to create map
 Import the MapInfo format map
 Use MapInfo convert JPG or BMP format file to Tab format file.
 Steps of convert JPG or BMP format file to Tab format file
 Download the city map via the accessorial software ( for example Supperget2000 series ).
 Use MapInfo open the map
 Click <Register> to calibrate the map
 Select 3-5 points from Google earth or by GPS test, Click <Add> , Enter the right longitude and
latitude as.
 Click <OK> , the software will generate map automatic, then the calibration is finished.

© ZTE Corporation. All rights reserved


Create map and design testing route

© ZTE Corporation. All rights reserved


Method to design the testing route

 Some times you need prepare the testing route at


first, The method to design the route in MapInfo as
follows
 Open MapInfo, open the map file. Click <New Table>, Create
a new layer on the map layer.
 Save the file to certain folder.
 Click [Map →Layer Control], select the pop-window from
layer control window, add the new layer just now created.
 Now the new layer is displayed in the status bar, Select the
drawing tools to design the testing route.
 Save the route.

© ZTE Corporation. All rights reserved


Method to design the testing route

© ZTE Corporation. All rights reserved


UE driver installation

 Here the test equipment is ZTE T6 mobile phone Double click setup. exe to install.

© ZTE Corporation. All rights reserved


Software installation

 CNT software installation


 Double click to install

© ZTE Corporation. All rights reserved


Hardware license driver install and upgrade
 First plug the USB dog, if inform “find new hardware” , click <cancel>. Click [ Start
→Program→ZTE WiNOM →ZXPOS CNT-UMTS →Micro Dog Install Driver ], Open the install
window.
Select install USB dog driver to install.

© ZTE Corporation. All rights reserved


Connect the equipment
 The figure shows how to connect the equipment , List the equipment for test, such as GPS,
GPS antenna, RS-232 cable, Test Mobile phone, Mobile cable, CNT hardware license, Laptop

© ZTE Corporation. All rights reserved


Build Test Environment

 Connect all equipment


 Start the software. In the left of the window, add mobile and GPS.

Parameter
Parameterdescription
description
Build In
Build In ::
((11) )Sim
SimNavigator
Navigator: :Simulate
Simulateaa
GPS
GPS, ,when
whenno noGPS
GPSconnect
connectto tocomputer,
computer,
software
software will simulate a GPS, willgenerate
will simulate a GPS, will generate
location
locationinformation
informationrandomly
randomly
(( 2 ) Indoor Navigator:
2 ) Indoor Navigator :IfIfdo
dothetheindoor
indoor
test,
test,
selection
selectionthis
thisoption
option
COM
COM : The portconnect
: The port connectthe
theequipment
equipment
APT
APTFile
File: :load
loadororunload
unloadtest
testdata.
data.
CellSite
CellSite File : load or unload siteinformation
File : load or unload site information

© ZTE Corporation. All rights reserved


Build Test Environment

 Click[ My computer →Management→ Device


management→ port ( COM and LPT ) ], Check the
port information.
 Right click to detect GPS and UE. Then right click test
phone, select<Test Mode> to active test. Select a
folder to save the test data in the pop-window.

© ZTE Corporation. All rights reserved


Build Test Environment

© ZTE Corporation. All rights reserved


Build Test Environment

 Load map and testing route


Button
Button to
to show
show map
map window.
window.

Button
Button to
to add
add map
map and
and testing
testing route.
route.

© ZTE Corporation. All rights reserved


Build Test Environment

 Load site information.


 Click [ File->Load Cell Site…] to load site information.

 Notice : Click [ File->Unload Cell Site ] can unload the site information. If
already load site information, then you add other site information table,
former will be unload.

© ZTE Corporation. All rights reserved


Build Test Environment

 Display style setting


 Click button , Set the Active Set and Monitor Set Line color and
cell site label parameters.

© ZTE Corporation. All rights reserved


Build Test Environment
 Display style setting
 Click to set the Theme

© ZTE Corporation. All rights reserved


Contents

 Test preparation
 Coverage test
 CS service test
 PS service test
 Indoor coverage test
Overview

 The aim of coverage test is to know the cell coverage,


relationship between capacity and coverage, and
whether it is uplink or downlink limited.

© ZTE Corporation. All rights reserved


Pilot Coverage Test

 In CNT click shortcut icon to open pilot set window

© ZTE Corporation. All rights reserved


Drive Test Replay

 CNT can save the drive test data in “apt” format, and support replay.

© ZTE Corporation. All rights reserved


Contents

 Test preparation
 Coverage test
 CS service test
 PS service test
 Indoor coverage test
Overview

 CNT supports voice automatic redial test. The details


as follows:
 Powerful service planning sequence function. You can
define the auto-test plan flexibly.
 Support WCDMA/GSM mode test
 Locate the call failure reason through layer 3 message,
offer the call statistic information.
 Record the time information during call test.

© ZTE Corporation. All rights reserved


CS Service Test Procedure

 Step 1. Click [View → Phone→ Voice Call Test]

© ZTE Corporation. All rights reserved


CS Service Test Procedure

 Step 2. Set the parameters and click “Apply”, and


then click “Start Call”

© ZTE Corporation. All rights reserved


CS Service Test Parameter Description

 Plan Name
 Call Number, for example, 10010
 Service Option, normally select CS12.2K
 Call Pattern: select Origination or Termination
 Continuous Call: select it for continuous call
 Redial On Drop: On Continuous Call mode , redial after call
drop
 Call Count
 For discontinuous call, the following parameter will be valid,
 Setup Time: Maximum time for call setup
 Call Time: Conversation duration
 Tear Down Time: Maximum time for radio link release
 Idle Time: Idle duration between two conversations

© ZTE Corporation. All rights reserved


CS Service Test Call Statistics

 It includes call procedure, time and statistic information.

© ZTE Corporation. All rights reserved


Call statistic parameter description
 Current Call column shows all information as follows
 Phone Modal
 Phone State: Service status
 Setup Time
 Conversation Time
 Tear Down Time
 Idle Time
 Current Plan column shows all the statistic information as follows
 Call Success : Call success time and ratio
 Call Block : Time and ratio
 Call Drop : Time and ratio
 Call Fail : Time and ratio
 Link Error : Call error and link fault because of UE link broken
 Call Prerelease
 Call Remain : Conversation duration
 Call Count : Call times

© ZTE Corporation. All rights reserved


CS Service Test Time Statistics

 In Time Statistics window, record all the time statistic message during
conversation, including access request count, call setup time, call time, teardown
time, and Idle time.

© ZTE Corporation. All rights reserved


Contents

 Test preparation
 Coverage test
 CS service test
 PS service test
 Indoor coverage test
PS Service Test Procedure

 Step 1. Click [View → Phone→ Data Call Test]

© ZTE Corporation. All rights reserved


PS Service Test Procedure

 Step 2. Click , to add or delete a test item, and set parameters

© ZTE Corporation. All rights reserved


Plan parameter description
 Connection test
 Connect is used to establish the dial-up connection automatically, so that no need to
dial up manually. It’s recommend to be the first item.
 PPP service test
 The same setting as connection test.
 FTP service test
 Host
 Port
 PASV : Setup the connection on passive mode of not
 User Name
 Password
 Anonymous
 Timeout
 Direction: Upload or download
 Restore : Restore the connection when it’s fault.
 Local File
 Remote File

© ZTE Corporation. All rights reserved


Plan parameter description
 Http service test
 URL
 Direction: Upload or download
 Timeout
 Local File
 Ping service test
 Host
 Packet Size (bytes) 、

 Timeout (ms)
 Ping Count
 Delay (ms): Timing interval between to test.
 TCP/UDP service test
 Down Link , Up Link
 TCP , UDP
 Server Address
 Port
 Datagrams Length (bytes)
 Speed (KBits/s)

© ZTE Corporation. All rights reserved


Message

 Step 3. Click <Apply> , Then <Start Call>.

© ZTE Corporation. All rights reserved


Throughput

 Step 4.Click <Throughput> to check the throughput, status of data


transmit and statistic message.

© ZTE Corporation. All rights reserved


Transfer Information
 Color
 Different to identify different service.
 Right click menu
 Update 500ms
 Update 1000ms
 Update 1500ms
 Show In Kbytes
 Option : Color and style of the throughput line
 Transfer information
 Service Type
 Status
 Total Data(Kbytes): Totally data size will be transmit.
 Load Data(Kbytes) : Transmitted data size.
 Direction: Upload or download
 Percent : Progress
 Duration : Transmit duration
 Avg Throughput(Kbps)

© ZTE Corporation. All rights reserved


Contents

 Test preparation
 Coverage test
 CS service test
 PS service test
 Indoor coverage test
Overview

 Indoor coverage test will record the test data without


GPS. You can input the location information according
to the map information, and define the test route,
using “Click and walk” method to do indoor drive
test.

© ZTE Corporation. All rights reserved


Indoor coverage test

© ZTE Corporation. All rights reserved


Button Instruction

© ZTE Corporation. All rights reserved