Electrical System in RSMML
RSMML has 8MVA power connection from
AVVNL at 132KV supply.
Two Sub-station-> (1) 16MVA, 132/33/3.3KV
(2) 8MVA, 33/11/3.3KV
Power Transformers- (1) 12.5/16MVA, 132/33KV
(2) 10/12.5MVA, 33/3.3KV
(3) 4MVA, 33/11KV
(4) 3MVA, 11/3.3KV
Load Centres:-
Example SLD
Records
1. Earth pit resistance
2. Relay testing
3. Transformer oil filtration
4. Transformer Maintenance
5. Motor and starter panel Mtc
6. Updated single line diagram
7. Electrical Return
Electrical Statutory Manpower
1. Electrical Engineer
2. Electrical Safety Officer
3. Electrical Supervisor
(A) Electrical Engineer:-
In-charge for the electrical work carried out in respective
area.
CE-2
3 Shock due to leakage during working Ensuring shut down of the line by the
on transformer/circuit breaker/isolator authorized person Discharging of the line
at sub-station by earthing rod 2.25 Manager (Elect)
CE-3
4 Shock due to presence of supply during Ensuring shut down of the line by the
maintenance of switch yard. authorized person Discharging of the line
by earthing rod 1.8 Manager (Elect)
CE-4
Use of safety belt General precautions Manager (Elect)
Injury due to slipping / falling from the Work by trained persons 1.5
5 pole CE-5 Manager (Elect)
3. Control Measures
After assessing the hazard/ risk at the work place and ranking it to
identify the critical hazard, the next step was to asses/initiate the
control measure aiming for complete elimination of critical
hazard
In this process the emphasis to be given on both:
(1) First to look the present control system and
(2) Secondly to apply for additional control mechanism and
accordingly the control plan work sheets to be prepared for
immediate control mechanism.
(3)In this process due consideration shall be given to identify the
source of potential risk and the present control mechanism.
(4) Decide the responsible person
(5) Decide the time frame to mitigate the risk
4. Auditing
To exercise the proper control and effective implementation of control measures
so as to eliminate the critical risk hazard;
A. a system of regular auditing and reviewing of the risk ranking/ risk rating has been
developed and accordingly the team constituted vide above order will regularly
conduct audit,
B. add/delete the new hazard/eliminate the hazards
C. regularly update worker engaged about their safe working procedure
D. frame a policy for non reoccurrence of any accident/incident and work to record
near miss accident/hazards occurrence
E. Proper MIS system for information in time to all
F. Monthly review at departmental level/Mines manager level
G. Proper recording of each mis-happening
H. Proper Enquiry of Each accident
I. Quarterly review at SBU Head level
J. Six monthly review at Corporate Level/CIS Level
K. Annual Review of all safety systems at company level
Motor & Starters
(A) Motors
Regular current & temperature monitoring.
Periodically greasing work
Periodically motor maintenance i.e. Connection
tightening.
Motor Earthing
IR value record
(B) Motor Starters:-
Panel shall be properly earthed.
Protection- Overload, Single phase preventer, ELR.
Input and output cable shall be inserted through
suitable glands.
Regular dust cleaning & connection tightening.
NGR
Earthing
(A) What is earthing- The process of connecting metallic
bodies of all electrical apparatus and equipment to
huge mass of earth by a wire having negligible
resistance is called earthing.
2. Hand gloves
3. Earthing rod:-