Professional Documents
Culture Documents
1. Product Development
2. Branding
3. CSR/PR
AJIR have divided the regions they operate in into
five polygons,
1. Polygon1-Gulshan, Banani, Baridhara,
Bashundhara
2. Polygon 2- Uttara
3. Polygon 3- Mirpur
4. Polygon 4- Dhanmondi
5. Polygon 5- Motijheel
Internet service is all about how speed we can
provide to our customers. Capability to provide
high speedy wireless internet to customers is the
main core competency of AJIR. Superior 24/7
customer service and greater network coverage are
playing a vital role as their core competencies
We have launched some new packages for a part of advertisement. It may helpful,
the cause we have to do something new in business arena.
• AJIR offers fixed WiMAX service for Home & Business (SME) use.
• AJIR product is differentiated by Speed (256 Kbps, 512 Kbps, 1 Mbps, 2
Mbps etc.).
• Fixed Monthly Billing for Sky Packages (256 and 512 packages)
• User Name & Password stored in Modem and connection “Always On”.
• Any PC will be connected on Internet without extra Authentication.
• People can share the bandwidth among multiple PCs using a Router or LAN.
Just provide our Installation Engineer on your router/ Switch LAN cable.
Radio advertisement: Radio Amar, Radio foorti , ABC Radio etc.
Print media: Prothom-Alo, The Daily Star, Naya-Digonto, and
through billboard.
LOCATION: Our location is situated in Polygon1-Gulshan, Banani,
Baridhara, Bashundhara Polygon 2- Uttara Polygon 3- Mirpur
Polygon 4- Dhanmondi Polygon 5- Motijheel. We have divided into
five sector so that we be will able to serve our customer more
efficiently. In a commercial area so many social networking are
required as a result our modem will solve all the requirement. We have
spread our service to home based customer, retailer, commercial area
everywhere that possible.
Total capital is needed 100000000 taka for started
our business
Sources of capital
As we found our business as a partnership form and
we are four partners so we provide 25 percent of
total capital equally and the rest of the capital is
collected from bank loan.
Total capital 100000000
Stock capital 80782
Land Purchase 1000000
Building 2000000
Machine Purchase 3000000
Raw Materials 3000000
Equipments 5000000
Investment ( project) total taka =14000000