F-35 Electro-Optical Targeting System

Producibility Improvements Save More Than $224M

Six phases of Navy ManTech projects are significantly improving the affordability of F-35 infrared components
.
WHAT IS IT? HOW DOES IT WORK? WARFIGHTER BENEFITS
The Office of Naval Research ManTech Phases 1-3 implementation of Phase 1 The project increased the
Program’s Electro-Optics Center improved and automated FPA and IDC Manufacturing Readiness Level from 4 to
conducted projects, executed under six manufacturing processes, tools, and 8 while reducing the cost per IDC
phases, that are significantly improving equipment (significantly reduced cost assembly by 19%, saving over $117M.
the affordability of the F-35 Electro- and increased yield and reliability). The return on investment (ROI) is over
Optical Targeting System (EOTS). EOTS Phase 4 is transitioning the mid-wave 25X for the F-35 Program.
is a high-performance, lightweight, multi- infrared IDC to a high operating Phase 2 The project provided
functional system for precision air-to-air temperature advanced detector (will affordability savings of over $18M. The
and air-to-surface targeting. The system increase capacity, significantly reduce ROI is over 43X for the F-35 Program.
provides high-resolution imagery, FPA cost and increase the reliability). Phase 3 The project provided
automatic tracking, infrared search-and- Phase 5 is implementing an FPA batch affordability savings of over $5M. The
track, laser designation with range manufacturing process (significantly ROI is over 7X for the F-35 Program.
finding, and laser spot tracking at greatly lowers manufacturing costs) and Phase 4 The project is expected to save
increased standoff ranges. Funded by the automating the lower vacuum over $62M for the F-35 Program when
Air Force, Navy, and Defense-Wide assembly test station (significantly implemented in 2021.
Manufacturing Science & Technology decreases manufacturing time and Phase 5 The project is expected to save
Program, the EOTS efforts have rework costs). over $19M for the F-35 Program when
optimized manufacturing processes for F- Phase 6 is implementing an in-situ etch implemented in 2021.
35 infrared components, including the and passivation tool (improves yield Phase 6 The project is expected to save
integrated Dewar cooler (IDC) and the and reliability and reduces cost) and over $3M for the F-35 Program when
focal-plane array (FPA). implementing wafer photolithography implemented in 2022.
improvements (streamlines Total Estimated Savings of More Than
manufacturing process, reduces cost, $224M
INTERESTING FACT and improves yield).
The F-35 EOTS Producibility Phase 1 project was awarded the 2015 Defense Manufacturing Technology Achievement Award.