0% found this document useful
Loading
Professional Documents
Culture Documents
Document
Item Description Unit Standby Operation Size 1 2 3 4 5 6 7 9 10 13 14 15 17 18 19
Added by basil ameen
Document
Technical Specification 3.5 Completion
Added by basil ameen
Document
Block 23 Casing/Tubing REQUIREMENT - 2022 Work Programme: Size Grade Connection Weight (PPF) IS Well (M) QCN Well (M)
Added by basil ameen
Document
Technical Specification 3.5 Completion
Added by basil ameen
Document
Iot Offer Optimum Petroluem
Added by basil ameen
Document
IOT OFFER OPTIMUM Petroluem
Added by basil ameen