- DocumentWQIP-H3-ILF-T-0281 V2, Manufacturer Inspection Test Plan (SPS - Saudi Pipe System)uploaded by
Mohamed Ali
- DocumentWQIP-H3-ILF-T-0448 V0, Third-Party Inspection Notification (TPI) for DI Pipes 11th Dec. 2023uploaded by
Mohamed Ali
- DocumentWQIP-H3-ILF-T-0448 V0, Third-Party Inspection Notification (TPI) for DI Pipes 11th Dec. 2023uploaded by
Mohamed Ali
- Document14-frame-connections-_240530_204348-1uploaded by
Mohamed Ali
- Documentدليل خطوط التنفيذuploaded by
Mohamed Ali
- Documentطلب مواد سفتي لمهندس شريفuploaded by
Mohamed Ali
- Documentانتاجية شهر ابريل م محمد سباعيuploaded by
Mohamed Ali
- Documentدليل خطوط التنفيذuploaded by
Mohamed Ali
- Documentالضغط المائي8uploaded by
Mohamed Ali
- Document9الوصلات المنزليةuploaded by
Mohamed Ali
- Documentتحليل سعر فرعة انحدار 500 ممuploaded by
Mohamed Ali
- Document3 صرف فلوس كاشuploaded by
Mohamed Ali
- Document046 Letter of Intent (False Ceiling )uploaded by
Mohamed Ali
- Documentنوتة موقعيةuploaded by
Mohamed Ali