You are on page 1of 20

STM Quality Limited

7 Wastes

TOTAL QUALITY MANAGEMENT

7 Wastes
ABSL Quality Solutions 2007 STM Power Limited

Waste

STM Quality Limited

How often have you used the expressions: That was a waste of time! or That was a waste of money! or That was a waste of effort!
STM Quality Limited

Wasted Time

STM Quality Limited

Just imagine if we could collect all the time together that we have wasted in the past How much time would that be?
STM Quality Limited

Wasted Money

STM Quality Limited

Just imagine if we could collect all the money together that we have wasted in the past How much money would that be?
STM Quality Limited

Wasted Effort

STM Quality Limited

Just imagine if we could collect all the effort together that we have wasted in the past How much effort would that be?
STM Quality Limited

The Problem With Waste

STM Quality Limited

The problem with wasted time, money & effort is:


When its gone - its gone!

STM Quality Limited

Eliminating Waste

STM Quality Limited

So what can we do to eliminate

waste?

We first need to identify what is &

is not waste, then we can look at ways of eliminating or at least reducing waste.

STM Quality Limited

Identifying Waste in the Workplace

STM Quality Limited

Operational Activity Value added Operations Any process that changes the nature, shape or characteristic of the product in line with customer requirements e.g. Pressing, welding, heat treatment.
This is where we make a profit!
STM Quality Limited

Identifying Waste in the Workplace

STM Quality Limited

Operational Activity Non-Value added Operations Work carried out which is necessary under current conditions, but does not increase product value. e.g. Inspection, tool change, maintenance.
This is where we make a loss!
STM Quality Limited

Value Added and Non-Value Added operations

STM Quality Limited

The objective is to raise the ratio of Value

added operations to non-value added operations and eliminate waste.


OPERATOR TIME
WASTE NON-VALUE ADDED

VALUE ADDED

ELIMINATE

MORE TIME FOR OTHER ACTIVITIES

NON-VALUE ADDED

VALUE ADDED

STM Quality Limited

7W The Elimination of Waste

STM Quality Limited

So, now we understand the difference in

value added & non-value added operations, what are the benefits in eliminating all waste?

Reduced costs Greater Capacity Bottlenecks are identified


STM Quality Limited

7W 7 Types of Waste

STM Quality Limited

1 Over-production

2 Inventory
3 Transportation

4 Process
5 Idle Time 6 Operator Motion 7 Bad Quality
STM Quality Limited

7W 1. Over-production

STM Quality Limited

Over-production

Producing more than is needed hides a

multitude of problems. Excessive set-up times, machine faults, risk of producing obsolete stock.
STM Quality Limited

7W 2. Inventory

STM Quality Limited

Inventory

Carrying stock attracts cost & storage

problems. Storage leads to stacking, racking, sophisticated computers, bar coding & automation, all for an activity that adds no value to the product.
STM Quality Limited

7W 3. Transportation

STM Quality Limited

Transportation

This may appear unnecessary but does add

value. Large transport is easily identified but small transport such as manual labour may not be so noticeable. These can be improved by changes to the work environment.
STM Quality Limited

7W 4. Process

STM Quality Limited

Process

Adds cost but no value - e.g.trimming &

moulding to a level that is beyond the required standard adds extra time that customers do not want to pay for.
STM Quality Limited

7W 5. Idle Time

STM Quality Limited

Idle Time

Typically, waiting for products & services from

preceding operations, waiting for work from their previous set-up or waiting for cycles to finish, or meetings to start.
STM Quality Limited

7W 6. Operator Motion

STM Quality Limited

Operator Motion

Typically, single handed operations where

both should be used, stretching unnecessarily or awkwardly and walking between things. All of these take time or use time poorly, none add value.
STM Quality Limited

7W 7. Bad Quality

STM Quality Limited

Bad Quality

Rejects are always produced by systems and

procedures created by management. If operators fail it is because the process allowed them to fail through inadequate training or because the process was not capable in the first place.
STM Quality Limited

7W The Elimination of Waste


Produce only what is needed; Carry only essential stock; Use transportation more wisely;

STM Quality Limited

So, now we understand the 7 wastes, we can:

Produce work to the standard required;

Plan our production processes;


Put our efforts to the best possible use; Train to make quality work every time!
STM Quality Limited

You might also like