GENERAL Prepared By Date of the visit Client : : : Sawit J. (TET, RBO) 30 Aug 2013 9.00 to 16.00 VINYTHAI PUBLIC COMPANY LIMITED Khun Anex P. (VNT) RAYONG
2.0 PURPOSE OF THE VISIT To check and verify the proposed areas to confirm the feasibility, obstruction and interference free.
3.0 FINDINGS New blower, heat exchanger and separator will be installed on new steel structure in PCP area. New 16 pipe will be routed on existing pipe racks and bridges from PCP area to existing incinerators in VCM area.
QM-GEN-25, Rev.1
Page 2 of 10
QM-GEN-25, Rev.1
Page 3 of 10
New structure will be constructed for new separator and heat exchanger.
Existing spill wall will be demolished. New spill wall and paving will be constructed.
Fig. 2
QM-GEN-25, Rev.1
Page 4 of 10
Fig. 3
Fig. 4
QM-GEN-25, Rev.1
Page 5 of 10
VCM area.
PCP area.
Fig. 5
PCP area.
Fig. 6
QM-GEN-25, Rev.1
Page 6 of 10
PCP area.
VCM area.
Fig. 7
VCM area.
PCP area.
Page 7 of 10
Some supports will be added on pipe rack for new 16 pipe Option 1 Extend from existing columns. Option 2 Add new supports beside pipe sleepers. Fig. 9
PCP area.
Fig. 10
QM-GEN-25, Rev.1
Page 8 of 10
New 16 pipe will be routed on existing racks. VCM area. PCP area.
Fig. 11
PCP area.
VCM area.
Fig. 12
QM-GEN-25, Rev.1
Page 9 of 10
Incinerators.
Fig. 13
Incinerators.
Fig. 14
QM-GEN-25, Rev.1
Page 10 of 10
Fig. 15
Fig. 16
QM-GEN-25, Rev.1