SITE SURVEY REPORT


Ref. To From Date Subject Project Project No 1.0 : : : : : : : 4251-SVR-T357-001 Bang-on O. (Project Engineer) Sawit J. (Civil Engineer) 03 Sep 2013 SITE SURVEY REPORT 001
DETAIL ENGINEERING SERVICE FOR SEND VCM EMISSIONS TO INCINERATION PROJECT

4251

GENERAL Prepared By Date of the visit Client : : : Sawit J. (TET, RBO) 30 Aug 2013 9.00 to 16.00 VINYTHAI PUBLIC COMPANY LIMITED Khun Anex P. (VNT) RAYONG

Time of the visit : Person Contacted: Site Location :

2.0 PURPOSE OF THE VISIT To check and verify the proposed areas to confirm the feasibility, obstruction and interference free.

3.0 FINDINGS New blower, heat exchanger and separator will be installed on new steel structure in PCP area. New 16 pipe will be routed on existing pipe racks and bridges from PCP area to existing incinerators in VCM area.

4.0 AREAS OF CONCERNS (if any) None

QM-GEN-25, Rev.1

Page 2 of 10

SITE SURVEY REPORT


5.0 CONCLUSIONS After performing site survey, we found that PCP area, existing stair will be demolished then replacing by the new steel structure. (Fig. 1) PCP area, the new blower will be installed at existing gravel area. So, new paving and spill wall will be constructed after installing of the new blower. (Fig. 2) PCP area, existing manhole will be relocated to any suitable area. (Fig. 1) PCP area, new analyzer house will be constructed next to the new blower. (Fig. 3) Spaces of existing pipe racks and bridges are available for the new 16 pipe. (Fig. 4 to 12) VCM area, new special pipe supports will be constructed for the new 16 pipe to incinerators. (Fig. 13 to 14) VCM area, two existing filters will be relocated for connecting the new 16 pipe to existing line, so new foundations of the filters are required. The new foundations are considered as additional work. (Fig. 15 to 16)

6.0 REFERENCES None

QM-GEN-25, Rev.1

Page 3 of 10

SITE SURVEY REPORT


7.0 ATTACHMENTS

Existing stair will be demolished

Existing manhole will be relocated to any suitable area.


Fig. 1

New structure will be constructed for new separator and heat exchanger.

New foundation of blower will be constructed.

Existing spill wall will be demolished. New spill wall and paving will be constructed.
Fig. 2

QM-GEN-25, Rev.1

Page 4 of 10

SITE SURVEY REPORT

The proposed area for new analyzer house.

Fig. 3

New 16 pipe will be routed on existing racks.

Fig. 4

QM-GEN-25, Rev.1

Page 5 of 10

SITE SURVEY REPORT

VCM area.

PCP area.

New 16 pipe will be routed on existing racks.

Fig. 5

PCP area.

New 16 pipe will be routed on existing racks. VCM area.

Fig. 6

QM-GEN-25, Rev.1

Page 6 of 10

SITE SURVEY REPORT

New 16 pipe will be routed on existing racks.

PCP area.

VCM area.

Fig. 7

VCM area.

PCP area.

New 16 pipe will be routed on existing racks.


Some supports will be added on pipe rack for new 16 pipe Option 1 Extend from existing columns. Option 2 Add new supports beside pipe sleepers. Fig. 8
QM-GEN-25, Rev.1

Page 7 of 10

SITE SURVEY REPORT

New 16 pipe will be routed on existing racks.

VCM area. PCP area.

Some supports will be added on pipe rack for new 16 pipe Option 1 Extend from existing columns. Option 2 Add new supports beside pipe sleepers. Fig. 9

PCP area.

New 16 pipe will be routed on existing racks. VCM area.

Fig. 10
QM-GEN-25, Rev.1

Page 8 of 10

SITE SURVEY REPORT

New 16 pipe will be routed on existing racks. VCM area. PCP area.

Fig. 11

PCP area.

VCM area.

New 16 pipe will be routed on existing racks.

Fig. 12

QM-GEN-25, Rev.1

Page 9 of 10

SITE SURVEY REPORT

New 16 pipe will be routed on existing racks.

Incinerators.

Special pipe supports will be constructed for new 16 pipe.

Fig. 13

New 16 pipe will be routed on existing racks.

Incinerators.

Special pipe supports will be constructed for new 16 pipe.

Fig. 14

QM-GEN-25, Rev.1

Page 10 of 10

SITE SURVEY REPORT

Existing filter will be relocated.

New location of filter.

Fig. 15

Existing filter will be relocated.

New location of filter.

Fig. 16