You are on page 1of 29

1.

2.

1.

2.




1.
2.
3.
4.

5.
6.
7.

Power Boiler (PB#11)


Power Boiler (PB#12)

1. Pareto Maximum Variable cost


1



2. Pareto Maximum Energy Cost



3.



5 6
1.
2.

1.
6 14

2. 110,000




3.0-7.5


57,000-65,000




1.
2.
3.



1-2
1
Heating Value



4.

5.

6.

()




()

()


-
-

()

1) Five Force Model


2) Value Chain
3) SWOT Analysis
4) Space Matrix
5) BCG Growth Share Matrix

()

1. Five Forces Model


-
-
-
-
-

()
2) Value Chain Analysis
-
-
-
-
-

()

3) SWOT
4) SPACE Matrix
5) BCG Growth Share Matrix

()

-
-
-

()
(2)
1)
2)
3)
4)

Z-Score (MDA)

()

1)
2)
3)
4)
5) Z-Score

()

Five Force Model Value Chain

SWOT 1

SPACE Matrix

You might also like