Professional Documents
Culture Documents
No.
01 36.23 Earth work excavation and depositing on bank within initial 50.00 1 1811.50
m3 lead and initial lift in hard stiff clay, stiff black cotton, hard red m3
earth slabs etc as per Ss 20B & SI 62 for foundation
02 29.28 Sand filling with filling sand including water etc. 322.30 1 9436.94
m3 m3
03 9.88 m3 CC 1:5:10 using 40mm HBGS Metal 1531.42 1 15130.42
m3
04 23.05 R.R. Masonry in CM 1:5 1379.69 1 31801.85
m3 m3
05 22.70 CC 1:4:8 using 40mm HBGS metal 1656.37 1 37599.59
m3 m3
06 18.43 C.C. 1:2:4 using 20mm HBGS metal 2456.63 1 45275.69
m3 m3
07 40.54 Brick work in CM 1:3 1964.61 1 79645.28
m3 m3
08 203.64 Plastering in CM 1:3 113.16 1 23043.90
m2 m2
09 L.S. Provision for inlet & Out let pipes and necessary Gate valves L.S. 500.00
Total 2,45,000.00
09 Provision for Inlet and outlet pipes and necessary gate L.S.
valves